RecordingTranscript available3:08

Agenda: Edina - Aquatic Center Maintenance Tax Abatement - Early July 2025

Edina City CouncilMonday, July 14, 2025
Watch on original source

Document Analysis

Analyze the transcript to extract topics, key quotes, people, and more — then generate focused stories for any topic.

Transcript
[Music] Welcome to Agenda Edina, a program summarizing the actions taken at city hall that affect you most. I'm your host, Dorothia Marty. The city is exploring a new way to fund long overdue upgrades to the Edina Aquatic Cent's pump house, which has been in use since 1958. The original pool pump house needs to be replaced with a code compliance structure with a modern system. The deteriorating infrastructure poses operational risks, safety concerns, and compliance issues which could force facility closures if left unressed. 10 days before the scheduled opening of the Dina Aquatic Center in 2021, a mechanical failure occurred. Because the systems are obsolete, used parts were used as an interim solution, allowing the facility to reopen. In 2024, the aquatic center experienced ongoing electrical spikes causing operational issues. Over the past few years, the city's facilities division has developed plans to build a new filter room adjacent to the current pump house. Time is of the essence as delays in addressing these issues could lead to further deterioration, higher repair costs, and potential closure of the facility. Staff would like to begin construction this year so the new pump house would be complete before the 2026 season. We engaged an architect and engineer to look at not only the structure itself u from a safety standpoint, but all the equipment and uh pieces of that pool. We realized that new construction was required and without this new construction there's a possibility that the uh aquatic center in itself and the filtration system may fail at any point in time. The city sought state bonding for the project during the 2023 and 2025 legislative sessions but was unsuccessful. Municipal bonds for recreation projects are limited. It would also not be possible to increase user fees to finance the project in the necessary timeline or without significant increases that would impact affordability. The finance department has proposed selling tax abatement bonds to pay for the estimated $9 million project. We could essentially wait and do a bond referendum in the next couple of years. What does that mean? that would mean that we risk um malfunctions at the aquatic center that would result in even bigger problems. So therefore if we want to take care of the problem now tax abatement is our only option and we do have that tax capacity within those surrounding identified parcels that says hey the city has enough within that calculation that proves that this is an option if we want to do something about it this year. The city council will decide at its meeting July 15th if tax abatement bonds should be used to fund the project. If it is approved, bonds will likely be sold later this