## Richfield City Council Agenda
May 26, 2026 -- 7:00 PM
## Richfield Municipal Center
## Council Chambers
## 6700 Portland Avenue South
1. Call to Order
2. Pledge of Allegiance
3. Approval of the Agenda
4. Approval of Minutes
a. Meeting Minutes from the City Council Work Session from May 12, 2026.
b. Meeting Minutes from the City Council Regular Meeting from May 12, 2026.
## 5. Open Forum
Participants can share their comments in person, by voicemail, or email, and may also request to
participate virtually. For more information on submitting comments, refer to the Council Agenda and
Minutes page on richfieldmn.gov/citycouncil
6. Proclamations and Presentations
a. Proclamation Celebrating Pride Month.
## 7. Consent Calendar
Consent Calendar contains several separate items, which are acted upon by the City Council in one
motion. Once the Consent Calendar has been approved, the individual items and recommended
actions have also been approved. No further Council action on these items is necessary. However,
any Council Member may request that an item be removed from the Consent Calendar and placed
on the regular agenda for Council discussion and action. All items listed on the Consent Calendar
are recommended for approval.
## a. Approve Disbursements/Claims
b. Approve a work order in the amount of $680,570 with Stantec Consulting Services, Inc.
for engineering services for the 69th Street Reconstruction Project.
c. Consider approval of a request for a new Secondhand Goods Dealer license for
EcoATM, LLC, located at 826 West 66th Street (inside Speedway).
d. Consider the approval of the second reading of an ordinance amending Subsection
210.01 of the City Code related to City Council salaries for 2027 and 2028 and summary
publication of said ordinance.
## 8. Consideration of Items, if Any Removed From Consent Calendar
## 9. Public Hearings
## 10. Proposed Ordinances
11. Resolutions
## 12. Other Business
a. Consider alternate appointment to fill a vacancy on the Human Rights Commission.
## 13. City Manager’s Report
## 14. Council Discussion
a. Hats off to Hometown Hits
## b. Council Liaison Reports
15. Adjournment
Auxiliary aids for individuals with disabilities are available upon request. Requests must be made at least 96 hours in advance to the
City Clerk at 612-861-9739.
Includes Materials - Materials relating to these agenda items can be found in the Council Chambers Agenda Packet book located by
the entrance. The complete Council Agenda Packet is available electronically on the City of Richfield website.
Page 1 of 43
## CITY COUNCIL MEETING MINUTES
## Richfield, Minnesota
## City Council Work Session
May 12, 2026
## ITEM #1
## CALL TO ORDER
Mayor Supple called the work session to order on May 12, 2026, at 5:45 p.m., in Bartholomew
Conference Room.
## Council Present:
## Mary Supple, Mayor; Walter Burk, Sean Hayford Oleary, Sharon
Christensen, Rori A. Coleman-Woods.
## Staff Present:
## Guest Presenter:
## Katie Rodriguez, City Manager; Karl Huemiller, Recreation Director; Jay
## Henthorne, Police Chief; Jennifer Anderson, Support Services Manager;
## Scott Kulzer, Senior Analyst; Jordan Vennes, Utilities Engineer; Russ
## Lupkes, Utilities Superintendent; Mary Tietjen, City Attorney; and Michelle
Friedrich, City Clerk.
Sean Korn, Utility Rate Study Consultant with HDR.
## ITEM #2
## ITEM DISCUSSION
## a. Discussion of Park Alcohol Ordinance Update
Recreation Director Huemiller presented proposed updates to the city’s alcohol policy for parks and
city facilities to allow limited alcohol service at designated events and facility rentals, including the
Wood Lake Nature Center, Community Center, Ice Arena, and certain city-sponsored park events.
Staff reviewed proposed ordinance changes related to low-alcohol beverage definitions, temporary
liquor licensing, designated service areas, event oversight, staffing and security requirements,
permitting, enforcement provisions, and community celebration permits. Council and staff also
discussed THC beverage and cannabis regulations, with clarification that the ordinance changes
applied only to alcohol and that smoking remains prohibited in parks.
Council consensus supported the proposed updates, including clarification of designated decks,
patios, and designated outdoor service areas, and allowing expanded alcohol service, including hard
liquor service at the Wood Lake Nature Center and Community Center, subject to licensing, staffing,
and security requirements.
## b. Utility Rates
Senior Analyst Scott Kulzer and HDR Utility Rate Study Consultant Sean Korn presented an update
on the city’s water utility rate study, reviewing current residential tiered billing and flat-rate structures
for multi-family and commercial customers. Staff and consultants analyzed 2025 water consumption
data to evaluate potential tiered rate structures, finding that most residential users remain in the
lowest tier and that multi-family properties would largely fall within lower usage tiers, resulting in a
Page 2 of 43
## City Council Work Session Minutes -2- May 12, 2026
modest projected revenue difference under a tiered alternative. For commercial accounts, staff noted
significant variability in usage across business types and cautioned that a uniform tiered structure
could present administrative and equity challenges. Council discussed potential tiered approaches in
relation to sustainability, fairness, conservation goals, irrigation usage, and system cost recovery.
Staff recommended no change to multi-family rates and provided no specific recommendation on
commercial tiering, instead deferring the policy decision and offering to provide additional analysis
for Council review.
Council consensus supported maintaining the current multi-family rate structure and requested
further information and analysis from staff on commercial usage and tiered rate options.
## ITEM #3
## ADJOURNMENT
Mayor Supple adjourned the work session at 6:51 p.m.
## Date Approved: May 26, 2026
## Mary B. Supple
## Mayor
Michelle Friedrich Katie Rodriguez
## City Clerk City Manager
Page 3 of 43
## ITEM #1
## CALL TO ORDER
The meeting was called to order by Mayor Supple at 7:00 p.m. on May 12, 2026, in the Council
Chambers.
## Council Present:
## Mary Supple, Mayor; Walter Burk, Sean Hayford Oleary,
Sharon Christensen, and Rori A. Coleman-Woods.
## Staff Present:
## Guests:
## Katie Rodriguez, City Manager; Mary Tietjen, City Attorney; and
Michelle Friedrich, City Clerk.
None.
## ITEM #2
## PLEDGE OF ALLEGIANCE
Mayor Supple led the Pledge of Allegiance.
## ITEM #3
## APPROVAL OF THE AGENDA
MOTION: made by Council Member Hayford Oleary, seconded by Council Member Burk to
approve the agenda as presented.
Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council
Member Christensen, and Council Member Coleman-Woods.
Motion carried: 5-0
## ITEM #4
## APPROVAL OF MINUTES
MOTION: made by Council Member Coleman-Woods, seconded by Council Member Burk to
approve the minutes of the (4a) City Council Work Session from April 28, 2026, and (4b) Regular
Meeting from April 28, 2026.
Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council
## Member Christensen, and Council Member Coleman-Wood
Motion carried: 5-0
## ITEM #5
## OPEN FORUM
## CITY COUNCIL MEETING MINUTES
## Richfield, Minnesota
## Council Regular Meeting
May 12, 2026
Page 4 of 43
## City Council Meeting Minutes -2- May 12, 2026
Mayor Supple expressed sadness over the shooting that occurred two weeks earlier and extended
wishes for healing to Sergeant Leon and Sergeant Schultz, along with condolences to the family of
Mr. Hollis. Mayor Supple noted that the tragedy affected the entire community and encouraged
residents to support one another. Mayor Supple also stated that body-worn camera footage had
been released, but because the BCA investigation was ongoing, council members would not
comment on the case details.
Mayor Supple noted the process for individuals wishing to speak during Open Forum and reviewed
the three-minute time limit for public comments and explained the use of time warning cards to alert
the speaker when their time is almost expired. Instructions were given for speakers to state their
name and city of residence before speaking.
Two residents addressed the Council during the Open Forum opportunity.
Chara Blanch, Richfield resident, expressed concerns regarding the recent police shooting
involving Desaver Hollis and urged city leadership to review police policies, procedures, and
training in light of the shooting incident.
Nikki Holliday, Richfield resident and Florida resident, representing the family of Desaver Brian
Hollis expressed concerns regarding the April 29 police shooting, including the level of force used,
officer actions, and public safety impacts on nearby residents.
## ITEM #6
## PROCLAMATIONS AND PRESENTATIONS
a. Proclamation Celebrating Jewish American Heritage Month.
Mayor Supple read the proclamation recognizing Jewish American Heritage Month. The
proclamation was received by Ken Liss and Doris Rubenstein.
b. Proclamation Recognizing Peace Officers' Memorial Day.
Mayor Supple read the proclamation recognizing Peace Officer's Memorial Day. The proclamation
was received by Richfield Police Chief Jay Henthorne.
## ITEM #7
## CONSENT CALENDAR
City Manager Rodriguez presented the consent calendar.
## a. Approve Disbursements/Claims
## U.S. BANK Thru 05-08-2026
A/P Checks/ETF’s: (04-18-2026 thru 05-01-2026) $1,899,786.36
Payroll (4-24-2026) $1,408,498.13
## TOTAL $3,308,284.49
b. Richfield 4th of July Committee celebration license application.
Page 5 of 43
## City Council Meeting Minutes -3- May 12, 2026
c. Consider a resolution authorizing the Mayor and City Manager to finalize and execute a
## Cooperative Construction Agreement with the State of Minnesota Department of
Transportation, Contract No. 1061135, for the 73rd Street Trail project completed in 2025.
## RESOLUTION NO. 2026-12421
## AUTHORIZING THE MAYOR AND CITY MANAGER TO FINALIZE AND EXECUTE A
## COOPERATIVE CONSTRUCTION AGREEMENT WITH THE STATE OF MINNESOTA
## DEPARTMENT OF TRANSPORTATION, CONTRACT 1061135, FOR THE 73RD
## STREET TRAIL PROJECT COMPLETED IN 2025
d. Consider approval of a request for a new Secondhand Goods Dealer license for EcoAtm,
LLC, located at 6540 Penn Avenue South (located in CVS).
e. Consider a resolution authorizing the Mayor and City Manager to enter into an agreement
with the Conservation Corps of Minnesota for installation of rain gardens funded by the
Richfield-Bloomington Watershed Management Organization (RBWMO) Grant Program.
## RESOLUTION NO. 2026-12422
## AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT
## WITH THE CONSERVATION CORPS OF MINNESOTA AND IOWA FOR
## INSTALLATION OF RAIN GARDENS FUNDED BY THE RICHFIELD-BLOOMINGTON
## WATERSHED MANAGEMENT ORGANIZATION (RBWMO) GRANT PROGRAM,
## PROJECT NO. 220-11293
f. Site Plan Approval for conversion of a retail tenant space to a fitness studio at 6503
Nicollet Avenue South.
## RESOLUTION NO. 2026-12423
## SITE PLAN APPROVAL FOR FITNESS STUDIO A 6503 NICOLLET AVENUE SOUTH
g. Consideration of the approval of a Temporary On-Sale Intoxicating Liquor license from the
Fourth of July Committee for events scheduled at Veterans Memorial Park, July 4, 2026.
MOTION: made by Council Member Hayford Oleary, seconded by Council Member Burk, to
approve consent calendar items 7a-g as presented.
Council thanked the Fourth of July Committee for their work organizing upcoming events and shared
information regarding EcoATM kiosks, which accept used electronic devices such as phones and
laptops. Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council
Member Christensen, and Council Member Coleman-Woods.
Motion carried: 5-0
## ITEM #8
## CONSIDERATION OF ITEMS, IF ANY, REMOVED FROM CONSENT
## CALENDAR
None.
## ITEM #9
## PUBLIC HEARINGS
None.
## ITEM #10
## PROPOSED ORDINANCES
a.
Consider the first reading of an ordinance amending Subsection 210.01 of the City Code
Page 6 of 43
## City Council Meeting Minutes -4- May 12, 2026
related to City Council salaries for 2027 and 2028.
## BILL NO. 2026-05
## AMENDING SUBSECTION 210.01 OF THE CITY CODE RELATED TO CITY COUNCIL
## SALARIES FOR 2027 AND 2028
Council Member Burk presented staff report 10a, consideration of the first reading of an ordinance
amending City Code Section 210.01 related to mayor and council member salaries for 2027 and 2028.
Council Member Burk added that the council had directed staff at the April 28 Work Session meeting, to
prepare the ordinance reflecting no salary increases for 2027 and 2028.
MOTION: made by Council Member Burk, seconded by Council Member Christensen, to approve the
first reading of an ordinance amending Subsection 210.01 of the City Code related to the City Council
salaries for 2027 and 2028, and to schedule the second reading at the May 26, 2026, Council meeting.
Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council
Member Christensen, and Council Member Coleman-Woods.
Motion carried: 5-0
## ITEM #11
## RESOLUTIONS
a. Modifying the General Services Post Employment Health Care Savings Plan and
Management Post Employment Health Care Savings Plan.
## RESOLUTION NO. 2026-12424
## MODIFYING THE GENERAL SERVICES POST EMPLOYMENT HEALTH CARE
## SAVINGS PLAN AND MANAGEMENT POST EMPLOYMENT HEALTH CARE SAVINGS
## PLAN
Council Member Coleman-Woods presented staff report item 11a, and modifications to the city’s
General Services Post-Employment Health Care Savings Plan (HCSP) and Management Post-
Employment Health Care Savings Plan. Council Member Coleman-Woods added the changes
update plan language to align with the city’s 2024 compensation and classification structure
adopted following the Baker Tilly study, replacing references to the former pay system. The plans
continue to distinguish eligibility based on pay grades, with employees in grade 12 and below in the
General Services plan and grade 13 and above in the Management plan.
MOTION: made by Council Member Coleman-Woods, seconded by Council Member Christensen,
to approve a resolution modifying the General Services Post Employment Health Care Savings
Plan and Management Post Employment Health Care Savings Plan.
Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council
Member Christensen, and Council Member Coleman-Woods.
Motion carried: 5-0
## ITEM #12
## OTHER BUSINESS
None.
## ITEM #13
## CITY MANAGER’S REPORT
City Manager Rodriguez noted that there was nothing to report.
Page 7 of 43
## City Council Meeting Minutes -5- May 12, 2026
Council discussed concerns about inappropriate comments on city social media, following a recent
incident, and requested review of the city’s social media policy to consider whether comments
should be disabled. Council directed staff to gather information and bring the social media policy to
Council for discussion at a future work session.
## ITEM #14
## COUNCIL DISCUSSION
a. Hats off to Hometown Hits.
Council Member Burk noted the Human Rights Commission expressed appreciation for the City Clerk’s
upcoming presentation on elections and voting processes and noted that the public is encouraged to
attend the session.
Councilor Hayford Oleary noted he would be helping lead a tour of Richfield and Bloomington for the
National Association of City Transportation Officials conference in Minneapolis, highlighting local projects
and regional collaboration. Council Member Hayford Oleary also thanked city staff and Hennepin County
representatives for their assistance in organizing the tour.
Council Member Christensen noted nothing to report at this time.
Councilor Coleman-Woods provided updates on recent sustainability and community events, including
a tree sale, compost distribution at Donaldson Park, and a shredding and electronics recycling event,
and thanked the relevant commissions for their work.
Mayor Supple shared information on two assistance programs, the Bring It Home Minnesota, offering
rental support for eligible residents with a June 9–16 application window; and the Citizens Utility Board’s
temporary utility assistance program, available through October 31, 2026.
## b. Council Liaison Reports
Brief reports noted above in Hats off to Hometown Hits.
## ITEM #15
## ADJOURNMENT
MOTION: made by Council Member Burk, seconded by Council Member Coleman-Woods to adjourn
the meeting at 7:31 p.m.
Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council Member
Christensen, and Council Member Coleman-Woods.
Motion carried: 5-0
## Date Approved: May 26, 2026
## Mary Supple
## Mayor
## Michelle Friedrich Katie Rodriguez
## City Clerk City Manager
Page 8 of 43
Proclamation of the City of Richfield
WHEREAS, Pride month is a positive stance against discrimination and violence toward individuals who identify
as Two-Spirit, Lesbian, Gay, Bisexual, Transgender, Queer and/or Questioning, Intersex and Asexual
(2SLGBTQIA+) and celebrates sexual and gender identities; and
WHEREAS, the month of June was chosen for Pride Month to commemorate the Stonewall riots, which occurred
in June 1969, championed in part by two transgender women of color, Marsha P. Johnson and Sylvia Rivera, and
became a catalyst for the 2SLGBTQIA+ movement; and
WHEREAS, the Richfield City Council and staff identified the strategic importance of diversity, equity and
inclusion as core values and key components of a thriving hometown; and
WHEREAS, the citizens of Richfield’s Ward 2 elected its first openly gay City Council member, Sean Hayford
Oleary, who has been their voice on the City Council since 2021; and
WHEREAS, Leigh Finke was elected in 2021 to the Minnesota House of Representatives, becoming the first
openly transgender person to ever serve in the Minnesota Legislature; and
WHEREAS, in 2011, two years prior to same-sex marriage becoming legal in the State of Minnesota, the City of
Richfield established a domestic partnership registry as a means by which unmarried, committed couples who
resided or worked in Richfield and who shared a life and home together could document their relationship; and
WHEREAS, while the 2SLGBTQIA+ civil rights movement has achieved great progress, the Federal
Government and many states threaten that progress by enacting dehumanizing policies designed to dismantle the
basic human rights of our neighbors and friends in the 2SLGBTQIA+ community; and
WHEREAS, we see and acknowledge the trauma experienced by our 2SLGBTQIA+ neighbors and friends in the
context of the current political environment, and stand with them in compassion and resolve, remembering, in
particular, our transgender neighbors; and
WHEREAS, the 2SLGBTQIA+ community has made, and continues to make, great and lasting contributions to
the City of Richfield and the greater community; and
WHEREAS, the Richfield Human Rights Commission supported this proclamation at its May 5
th
, 2026 meeting
and recommended the Richfield City Council do the same;
Now, THEREFORE, I, Mary Supple, mayor of Richfield, on behalf of the Richfield City Council, do
hereby proclaim the month of June 2026 as Pride Month in the City of Richfield and call on the people of
Richfield to observe this month with appropriate programs, activities, and ceremonies, and continue to
honor the contributions of 2SLGBTQIA+ residents throughout the year.
PROCLAIMED this 26
th
day of May, 2026.
## Mary B. Supple, Mayor
Page 9 of 43
## City Council Meeting 5/26/2026
## Agenda Section: Consent Calendar
Agenda Item: 7.b.
## Report Prepared By:
## Matt Hardegger, Transportation Engineer
## Department Director:
## Kristin Asher, Public Works Director
## Item for Consideration:
Approve a work order in the amount of $680,570 with Stantec Consulting
Services, Inc. for engineering services for the 69th Street Reconstruction Project.
## EXECUTIVE SUMMARY
Public Works staff are beginning plan development for a reconstruction project on 69th
Street from Xerxes Avenue to Penn Avenue. The scope and final design of the project
will be determined through the City's Public Engagement Process, and will include
replacement of the undersized and deteriorated storm sewer system.
## RECOMMENDED ACTION
By Motion: Approve a work order in the amount of $680,570 with Stantec
Consulting Services, Inc. for engineering services for the 69th Street
Reconstruction Project.
## HISTORICAL CONTEXT
This project is identified in the 2027-2030 Capital Improvement Program for construction
in 2028. The project proposes to add permanent pedestrian and bicycle paths,
reconstruct the roadway, and replace or rehabilitate City utilities. Staff intend to open
bids for the project in late 2027 to coordinate construction with Hennepin County's
adjacent Penn Avenue reconstruction project (75th Street to Highway 62) that is
expected to begin in 2028.
The storm sewer in this section of roadway is undersized and creates flood risks for
several adjacent blocks. The storm sewer is also near the end of its expected life.
69th Street is identified as a project in the city's 2024 Active Transportation Action Plan,
and was also originally identified in the 2013 Bicycle Master Plan. A demonstration
project of a multi-use trail has been ongoing since 2016 using temporary materials. The
final roadway section will be determined using the City's Public Engagement Process.
Staff reviewed proposals from two consultants in the City's engineering services pool—
Stantec and Bolton & Menk—to perform design and engineering services for this
project. Stantec's proposal was chosen for their focus on the utility design aspect of the
job, demonstrated recent experience with the City's public engagement process, and
coordination benefits at the interface with the County project.
## EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS
Page 10 of 43
Equitable Considerations: Approval of a work order for engineering services is standard
city business. Equity considerations will be determined and addressed as design
advances through the City's public engagement process.
Strategic Considerations: This project advances the sustainable infrastructure strategic
priority by ensuring City infrastructure supports service needs.
## POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)
Project development will follow the Public Engagement Process for Street
Reconstruction Projects, the Complete Streets Policy, and principles of the Active
Transportation, Bicycle, and Pedestrian Master Plans.
## CRITICAL TIMING ISSUES
Staff intend to begin public outreach and engagement in summer 2026 to keep the
project on track for a fall 2027 letting.
## FINANCIAL IMPACT
• This project has been identified for up to $7,000,000 in street reconstruction and
utility bonds. These funds are expected to cover the entirety of design and
construction costs.
• Staff are expecting a future amendment to this work order for easement
acquisition services. The scope for this task will be determined based on the final
design of the roadway.
• Additional costs are expected for construction administration, likely 5-10% of the
total construction cost.
## LEGAL CONSIDERATIONS
None.
## ALTERNATIVE RECOMMENDATION(S)
None.
## ATTACHMENTS
## 1. WO26-02 69th Street Reconstruction
Page 11 of 43
## Public Works Department
## Utilities Division
## 1 9 0 1 E . 6 6
th
S T , R I C H F I E L D , M I N N E S O T A 5 5 4 2 3. | P H O N E : 6 1 2 . 8 6 1 . 9 1 7 0
## W W W . R I C H F I E L D M N . G O V | A N E Q U A L O P P O R T U N I T Y E M P L O Y E R
## MAYOR
## MARY SUPPLE
## CITY COUNCIL
## WALTER BURK
## SHARON CHRISTENSEN
## RORI A. COLEMAN-
## WOODS
## SEAN HAYFORD OLEARY
## CITY MANAGER
## KATIE RODRIGUEZ
May 4, 2026
Stantec Consulting Services, Inc.
## 733 Marquette Ave
Suite 1000
## Minneapolis, MN 55402
Subject: WO26-02 – 69
th
## Street Reconstruction
## Ms.Schlegel,
Enclosed is an electronic copy of the subject work order to retain Stantec Consulting
Services, Inc.’s services for the 69
th
Street Reconstruction project. Please note that the
work order is not to exceed $680,570 without prior approval.
Please have the Work Order executed and return an electronic copy to me for Richfield’s
records.
Should you have any questions, please feel free to contact me at (612) 861-9791 or
jpowers@richfieldmn.gov.
## Sincerely,
## Joe Powers
## City Engineer
## Enclosures
Page 12 of 43
## Work Order Form
## WORK ORDER NO. 26-02
Authorization to proceed and site-specific scope of services
Project: 69
th
## Street Reconstruction Project Engineering Services
## Location: City of Richfield
We transmit the following information for your use:
## Stantec Consulting Services, Inc.’s Proposal for the 69
th
Street Reconstruction Project dated April 28, 2026.
We hereby authorize you to proceed with the following phases of services for the above-referenced Project and
Location in accordance with the AGREEMENT between CITY and CONSULTANT dated March 12, 2026 .
* Tasks and deliverables described in attached Stantec Consulting Services, Inc. Proposal
Payment shall be on the basis of (select from the following):
Cost Plus Fee: Direct salary cost times audited overhead plus fee of percent and reimbursable expenses.
Cost Plus Fixed Fee: As for Cost Plus Fee, however total Fee shall not exceed .
Lump Sum: One sum payable by percent of completion of the Services (plus reimbursable expenses).
Cost Times a Factor: Direct salary cost times a factor of , plus reimbursable expenses.
Standard Hourly Billing Rates: Hourly rates plus reimbursable expenses.
The Not to Exceed Limit for this Work Order is: $680,570.00.
A Construction Cost Limit of is agreed upon between CITY and CONSULTANT for this Project.
## CONSULTANT: CITY:
## STANTEC CONSULTING SERVICES, INC. CITY OF RICHFIELD
## Signed: Signed:
## Its: Its: Public Works Director
## Signed: Signed:
## Its: Its: City Engineer
## Dated: Dated:
Page 13 of 43
## 69th Street Reconstruction Project
Stantec Consulting Services Inc.
## City of Richfield, Minnesota
April 28, 2026
Page 14 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 1
Stantec Consulting Services Inc.
733 Marquette Ave.
Suite 1000
## Minneapolis, MN 55402
## Attention:
## City of Richfield, MN
## Matt Hardegger
## Transportation Engineer
## 6700 Portland Avenue
## Richfield, MN 55423
612-861-9792
## MHardegger@richfieldmn.gov
## Reference:
69th Street
## Reconstruction
## Project
## Dear Mr. Hardegger and Selection Committee Members:
The 69th Street Reconstruction Project represents a critical investment in
one of Richfield’s key east–west corridors. This project balances aging
infrastructure needs with multimodal safety, community priorities, and
constrained right of way conditions. The proposed improvements between
Xerxes Avenue and Penn Avenue provide an important opportunity to fully
reconstruct the roadway, modernize underground utilities, and implement
bikeway and pedestrian enhancements consistent with the Richfield Bike
Plan, while improving safety and long-term performance for all users.
Stantec understands the technical and policy considerations that will shape
this project’s success. The corridor presents familiar challenges, including
limited right of way, existing retaining walls, coordination with State Aid
requirements, and the need to thoughtfully integrate bikeways, sidewalks,
lighting, and utilities within a 60foot corridor. Equally important, this project
requires clear, transparent alternatives analysis and meaningful public
engagement to support informed decision-making by staff, the
## Transportation Commission, and City Council. Our proposed approach
reflects these realities and is structured to support the City at every stage—
from early alternative development through final design and bidding.
Stantec is well suited to deliver this project because of our depth of
experience with municipal street reconstruction, State Aid–funded projects,
and integrated roadway and utility design. Our multidisciplinary team brings
coordinated expertise in roadway design, multimodal planning, stormwater
management, watermain replacement, sanitary sewer improvements,
lighting design, geotechnical coordination, and constructability review. This
integrated approach allows us to identify conflicts early, manage risk, and
deliver clear, buildable plans that support efficient bidding and construction.
We appreciate the opportunity to continue our partnership with the City of
Richfield and support a project that advances the City’s multimodal, safety,
and infrastructure goals. Our team understands the technical complexity of
this corridor, including constrained right‑of‑way conditions, existing
retaining walls, and the need to balance multimodal priorities within a
60‑foot ROW.
The team we assembled for this project brings a depth of municipal
roadway and utility experience. Stantec will partner with Zan Associates to
deliver the Public Engagement component of this project. This partnership
brings experience working within Richfield’s transportation planning
framework and an understanding of the Transportation Commission’s role
in reviewing, refining, and recommending projects that balance safety,
mobility, and community context.
Our team is accustomed to developing and clearly communicating
alternatives and tradeoffs related to bikeway design, sidewalk treatments,
and right‑of‑way constraints, allowing the Commission to evaluate options
in a transparent and informed manner. We have extensive experience
delivering State Aid–funded reconstruction projects that incorporate
adopted plans such as the Richfield Bike Plan, address intersection safety,
and require close coordination with City staff and partner agencies. This
approach supports clear Commission communication, alignment with City
policy, and well‑supported recommendations to City Council.
Page 15 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 2
## Project Understanding
This proposal is for preliminary topographic survey, public engagement, preliminary and final design, preparation of
construction documents, and bidding services for the above-mentioned project. It is our understanding that a
subsequent amendment will be provided for construction administration once design and bidding is completed.
The 69th Street project includes a full roadway reconstruction between Xerxes Avenue and Penn Avenue, with a
scope that integrates transportation, utility, and public realm improvements. Key project elements include:
• Full reconstruction of 69th Street from Xerxes Avenue to Penn Avenue
• Evaluation of full reconstruction versus full‑depth reclamation, supported by geotechnical investigation and
analysis
• Storm sewer replacement and improvements to address aging infrastructure and drainage performance
• Full watermain replacement and coordination with adjacent utilities
• Sanitary sewer lining within the project limits
• Installation of pedestrian‑level lighting to improve safety and comfort for people walking and biking
• A central focus of the project will be the development of layout alternatives, with particular emphasis on:
• Bikeway location and type consistent with the Richfield Bike Plan
• Sidewalk placement, width, and separation
• Multimodal safety and comfort within constrained right‑of‑way areas
• Consideration of existing retaining walls and locations where effective ROW width is reduced
## Meet Your Project Team
The project team assembled for this effort brings proven experience in municipal roadway and utility improvements
and a strong understanding of Richfield’s transportation planning process. Stantec will partner with Zan Associates
to lead public engagement, supporting the Transportation Commission’s role in reviewing, refining, and
recommending project solutions that balance safety, mobility, and community context.
## PROJECT MANAGER
## Kellie Schlegel
## PE
## PRINCIPAL IN CHARGE
## Tyler McLeete
## PE
## Engagement Lead
## Dan Edgerton
## AICP
## Zan Associates
## Geotechnical
## Braun Intertec
## Preliminary
## Design/Multimodal
## Lead
## Andrew Boyle
## PE
## Roadway Design
## Joe Pond PE
## Constructability
## Rick Kreuser
## Water Resources
and Stormwater
## Aaron Nemitz
## PE
## Utility Design and
## Coordination Lead
## Kellie Schlegel
## PE
## City of Richfield, MN
## QA/QC
## Utilities: Phil Gravel PE
## Roadway: Steven Voelker PE
## Water Resources: Tyler Johnson PE
Page 16 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 3
## Design Approach and Key Considerations
Stantec will work closely with City staff to develop and evaluate alternatives that respond to corridor constraints
while prioritizing safety and usability. Our approach will include:
• Development of multiple cross
‑section and layout alternatives to test bikeway and sidewalk
configurations
• Intersection safety analysis, with openness to traffic calming measures and safety enhancements
consistent with City policy and community context
• Coordination with State Aid funding requirements and affiliated approvals, ensuring designs meet
applicable standards and documentation needs
• Utility assessments and recommendations for methods of improvements
• Retaining wall investigation and design
• Coordination with CSAH 32 (Penn Avenue) intersection improvements
• Close collaboration with Public Works, including engineering and utility staff, and partner agencies to
support an integrated and constructible design
## Scope of Services
This proposal is for public engagement, preliminary design, and final design for the above-mentioned project. This
scope is broken down into several tasks which include: Topographic survey, public engagement, preliminary
design, permitting and state aid coordination, stormwater analysis and management plan, final design, bidding
support, and project management. A detailed scope for each task is provided below.
## Task 1: Topographic Survey & Structure investigations
Stantec will complete a field topographic survey of the corridor. The existing topographic survey information
available will be used to the greatest extent possible. Existing utility structures and utilities will be reviewed within
the project limits including upstream and downstream structures. Stantec will also locate (as able) existing property
corners and use these monuments as well as the plat to create a parcel basemap. The following components are
included in this task:
• Collect sufficient elevation data to generate surface contours at a 1’ contours interval across the corridor
• Locate visible improvements, above ground utility structures, streets, and site features within the corridor
• Locate public and private utility lines marked as a result of a Gopher State One Call utility locate request
based on visual, above-ground evidence and plans provided
• Determine rim and invert elevations and pipe sizes at sanitary and storm sewer structures within the
corridor, as well as structures immediately upstream and downstream
• Prepare a parcel basemap based on found property markers, available plat information, and Hennepin
County parcel linework
## Task 1 Deliverables
• Existing conditions base and parcel maps
## Task 2: Public Engagement
Public engagement will be central to the success of this project, so the design solutions for 69th Street reflect both
technical requirements and community priorities. Engagement will provide meaningful opportunities for residents to
share how they experience the corridor, inform evaluation of design options, and build understanding and support
for implementation. To achieve this, engagement will be integrated throughout every phase of the project.
Richfield has established a strong precedent for thoughtful, collaborative street reconstruction projects, supported
by a clear and effective engagement process. This approach incorporates the Transportation Commission and City
Council as key forums for community input. Our team brings direct experience with this process, including people
who are Richfield residents and former Transportation Commission members, that means we will be able to build
on what already works.
Page 17 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 4
We will refine our approach in partnership with the City through development of a communication and engagement
plan. We anticipate aligning with the City’s four-phase engagement framework, while right-sizing efforts to match
the scale of the project. This will include a mix of accessible, high-impact strategies such as on-site meetings at
Jefferson Park, flexible virtual engagement options, and targeted outreach along the corridor.
The following section outlines our proposed public engagement work plan.
## Task 2.1: Richfield Transportation Commission
The Transportation Commission will serve as the primary policy advisory body, providing input on technical issues,
reviewing engagement materials, and making recommendations to City Council. We will facilitate up to four
workshops aligned with key project milestones. Agendas will be coordinated with the City, and materials will be
provided at least one week in advance.
## Task 2.2: Open Houses
We will plan and facilitate up to four open houses at key milestones, consistent with the City’s engagement
process. To maximize accessibility, meetings will be held at Jefferson Park (weather permitting) to serve nearby
residents. Each open house will include a virtual component (online survey) to broaden participation.
## Task 2.3: Pop-up Events
To expand reach, we will conduct up to two pop-up events, bringing engagement materials directly into the
community. Potential venues include Penn Fest, Jefferson Park youth programming, or the Richfield Farmers
Market. The team will coordinate, prepare, and staff the events.
## Task 2.4: Project Website
We will provide content and up to four updates for a City-hosted project website. The site will share project
information, promote engagement opportunities, and host virtual open house materials.
## Task 2.4: Project Communications
We will develop one project fact sheet and up to four mailers to share updates and promote engagement. Materials
will be formatted for both print and digital distribution. We assume mailer production and postage will be handled by
the city. We will also design, produce, install, and remove yard signs along the corridor to increase awareness and
drive participation. Flyers and yard signs will be translated into Spanish, as needed.
The public engagement plan has been scoped to follow the City’s process. We welcome the opportunity to review
this scope with the city and refine assumptions before executing contracts.
## Task 2 Deliverables
• Meeting logistics, agendas, materials, and summaries for open houses and pop-ups
• One project fact sheet
• One yard sign design (printed and installed)
• Up to four mailers (electronic and print-ready)
## Task 3: Preliminary Design and Bikeway Alternative analysis
Andrew Boyle will lead the preliminary design and bikeway alternative analysis. During this phase, we will explore
opportunities to improve safety for multimodal users throughout the corridor, incorporating the results from the
public engagement process, in addition to input from city staff, the Transportation Committee, and other
stakeholders. We will also review available traffic/crash data to identify any specific areas of concern along the
corridor. This phase will incorporate conceptual and preliminary design, up to a 30% design deliverable package.
During conceptual design, we will work with the Transportation Committee and Zan Associates to identify several
(up to 3) potential roadway sections, as well as localized treatments such as curb bump-outs or medians. We will
produce high-quality drawings, graphics, renderings, and layouts for meetings, reviews, and public engagement
activities. These visuals will clearly articulate alternatives.
## Easements
Our team will approach the project with the intention to fit the proposed roadway within the existing right of way. If
the preferred layout alternative is determined to require temporary or permanent easements, Stantec can support
the city in securing these easements as an additional service.
## Task 3 Deliverables
• Conceptual layouts and typical sections for up to three (3) concepts
• Conditions assessment of existing retaining walls
Page 18 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 5
## Task 4: Stormwater Analysis & Management Plan, Design and Permitting
Stantec will provide the required stormwater management engineering and coordination with regulatory agencies
for the project through final design. The project will require a Richfield-Bloomington Water Management
Organization permit. Project tasks include the following:
• Regulatory review of applicable stormwater design and permitting requirements
• Evaluation and modeling of existing conditions
• Proposed condition modeling and BMP design
## • Coordination with City Staff
## • Preparation of Stormwater Management Plan
## • Richfield-Bloomington Water Management Organization Permit Application/Submittal and Coordination
• Final design of storm sewer system and associated documentation to meet watershed and State Aid
standards
## Task 4 Deliverables
## • Stormwater Management Plan
• Required submittals for State Aid review
• Required submittals for Richfield-Bloomington WMO permit application
## Task 5: Final Design
## Roadway Design
Once a preferred road and bikeway design has been approved, our team will initiate the final design phase of this
project. The final design will incorporate the design alternative selected in the preliminary design phase. We will
also design pedestrian-level lighting along the corridor. We will provide the following key milestone deliverables to
the City for review:
• 60% Plans and Estimated Opinion of Probable Cost (EOPC)
• 90% Plans, Specifications, and EOPC (These will also be provided to MnDOT State Aid for review)
• 100% Construction documents to include plans and specifications, in addition to final EOPC
## Sanitary Sewer Design
It is our understanding that the City is interested in using trenchless line (CIPP) for the existing sanitary sewer pipes
within the project area. We will review any current televising files and identify any areas of concern that may need
to be addressed prior to pipe lining. We will also discuss with the City the option of including sewer repairs or spot
replacement with this project.
## Watermain Design
Stantec’s experienced utility team will identify any watermain improvements that may be required, such as isolated
replacement of aging pipe, and offsets to accommodate proposed improvements. It is our understanding that
no modeling or review of existing modeling is required.
## Lighting Design
Our team will design pedestrian-level lighting improvements throughout the corridor.
## Task 5 Deliverables
• Draft Plans, Specifications, and EOPC as milestones identified above
• Final Construction documents
• MN Department of Health Watermain Plan Review application and submittal requirements
## Task 6: Bidding
Stantec will lead the bidding process using the QuestCDN electronic bidding site. We will prepare an Advertisement
for Bids and coordinate publication with the City. We will post bidding documents to the QuestCDN site, respond to
contractor questions, and prepare and post addenda as needed. Stantec will host the electronic bid opening and
provide a tabulation of the bids and a bid results letter to the city for review.
## Task 6 Deliverables
• Bid tabulation and award recommendation letter
Page 19 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 6
## Task 7: Project Management
Project management time has been included to manage the team and project financials. Client meetings have also
been included in this task to coordinate with various City staff throughout the design process.
## Task 7 Deliverables
• Meeting agendas and minutes
## Geotechnical Engineering
Subsurface borings and an associated geotechnical report will be required for the design of this street and utility
project. We have obtained a preliminary estimate for this work consisting of the following:
• 5 Pavement Cores and Hand Auger Borings; 2 SPT Borings (10’ depth): $11,920
• Ground-Penetrating Radar (GPR): $1,771
We recommend that GPR be completed if a full-depth reclamation is considered as the depth of existing pavement
and gravel base will be an important consideration in this analysis. The total estimated geotechnical fee would then
be $13,690. A City selected contractor will ultimately contract directly with the City of Richfield. Stantec will support
finalizing this scope of work and coordinating the work on behalf of the City.
## Assumptions/Exclusions:
This project will be completed on a Time and Materials basis. Initial budgets will be established for various tasks
and Stantec will provide periodic updates to the City during the design and bidding process.
The City’s project budget for this project is $7M and we will work with the city to deliver the project within this
budget.
• The roadway will be designed to meet Minnesota State Aid standards
• Environmental studies, including wetland delineation, or Environmental Site Assessments, will not be
required and are not included in this scope.
• Design will be completed with AutoCAD Civil 3D 2025.
• Easement documentation and assistance with easement procurement are not included.
This scope of work does not include construction administration or observation services. An amendment can be
provided at a future date if these services are requested.
## Proposed Schedule
## Project Kick-off Spring 2026
Topographic Survey and Utility Investigations Summer 2026
## Preliminary Design/Public Engagement Summer/Fall/Winter 2026
Final design Spring/Summer 2027
## Bidding Fall 2027
## Construction Summer 2028
This schedule is an estimate and may be impacted by City scope changes, permitting timelines, easements,
and reviews.
Page 20 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 7
## Compensation
The fees summarized below are based on the project scope and assumptions noted above. A detailed fee estimate
can be found in Appendix B. Upon selection we will be willing to review the scope and fee with the city and make
refinements to most accurately meet the project needs and expectations of the city. Our current estimated fee is
$680,570. This fee does not include permitting fees. We estimate $500 in reimbursable expenses (mileage, printing
etc.). Actual expenses incurred will be invoiced as accrued and may exceed the estimate. This work will be
completed as a time and materials task order under our existing Master Services Agreement. Additional services
can be provided at our standard hourly rates after receiving written authorization.
## Task No. Task
## Estimated Fee
1 Topographic Survey $ 28,356
2 Public Engagement $ 90,218
3 Preliminary Design $ 75,948
4 Stormwater Analysis and Management Plan $ 81,961
5 Final Design $ 327,100
6 Bidding Support $ 6,284
7 Project Management $ 70,203
Expenses $500
## Total Estimated Not to Exceed Fee $ 680,570
Geotechnical Services $ 13,690
## Advantages of Stantec
• Strong understanding of Richfield’s priorities
Experience integrating adopted plans—such as the Richfield Bike Plan—into State Aid-funded
reconstruction projects while balancing safety, mobility, and community context.
• Multimodal and utility expertise under one team
Coordinated roadway, bikeway, sidewalk, lighting, stormwater, watermain, and sanitary sewer design
reduces conflicts and supports efficient delivery.
• Clear alternatives development and decision support
Development of multiple cross section and layout alternatives, supported by high-quality graphics, to clearly
communicate trade-offs within constrained right of way areas.
• State Aid and permitting coordination
Proven experience navigating MnDOT State Aid reviews and Richfield-Bloomington WMO permitting
requirements to keep projects moving forward.
• Public engagement that informs design
Integrated engagement approach aligned with the City’s established framework, supporting Transportation
Commission review and well-supported recommendations to City Council.
• Focus on constructability and risk management
Early geotechnical coordination, retaining wall investigation, and dedicated QA/QC reviewers to reduce
construction risk and change orders.
• Responsive project management
Close coordination with City staff, clear communication, and transparent budget and schedule management
throughout design and bidding.
Page 21 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 8
Stantec is excited about the opportunity to partner with the City of Richfield on the 69th Street Reconstruction
Project. This project represents an important investment in the City’s transportation and utility infrastructure, and we
are committed to delivering a thoughtful, technically sound solution that enhances safety, supports multimodal
mobility, and reflects community priorities. Our team brings the experience, local knowledge, and collaborative
approach needed to guide the project from early alternatives through final design and bidding with clarity and
confidence.
We appreciate your consideration and the opportunity to present our qualifications for this important project. We
look forward to continuing our partnership with the City of Richfield in service of its residents and stakeholders.
Please contact either of us should you have any questions or wish to discuss our approach in more detail.
## Sincerely,
## STANTEC CONSULTING SERVICES, INC.
## Kellie Schlegel
## PE
## Project Manager
612-712-2125
kellie.schlegel@stantec.com
## Tyler McLeete
## PE
## Principal in Charge, Practice Leader
612-712-2089
tyler.mcleete@stantec.com
Page 22 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 9
## Appendix A
## Team Resumes
Page 23 of 43
## Kellie Schlegel PE
## Civil Engineer
22 years of experience · Minneapolis, Minnesota
Kellie brings nearly 23 years of experience,
specializing in municipal infrastructure. Her multi-
disciplinary experience incorporates planning and
design for a variety of projects, including pedestrian,
roadway, and utility improvements. Kellie regularly
serves as the project manager for infrastructure
projects, working closely with both city and internal
Stantec staff. Her knowledge of municipal and State
Aid processes, engagement, and permitting
regulations brings a well-rounded approach.
## EDUCATION
## Master of Science, Infrastructure Systems Engineering,
## University of Minnesota, Minneapolis, MN
## Bachelor of Science, Civil Engineering, University of
## Minnesota, Minneapolis, MN
## Bachelor of Arts, Mathematics, Carleton College,
## Northfield, MN
## REGISTRATIONS
## Professional Engineer #46200, Minnesota
## Professional Engineer #E-49643, Wisconsin
## PROJECT EXPERIENCE
## 2025 Elm Creek Pavement Rehabilitation, Expansion,
## and Accessibility Improvements | Three Rivers Park
## District, MN | Project Manager
## Kellie worked closely with Three Rivers Park District to
improve ADA deficiencies, drainage issues, and
pavement conditions for several trails, roadways, and
## parking lots within Elm Creek Park Reserve. This
recently completed project also included the design of
two additional parking lots.
## 2026 Bishop Drive Street and Utility Reconstruction |
## Westerville, OH | Project Manager
Kellie is the project manager for this project that consists
of street and utility reconstruction for ½-mile of urban
residential roadway. Components of this project include
conceptual design to examine several roadway sections
to accommodate both roadway and pedestrian/bicycle
traffic, a public open house, final design, and
coordination with private utilities.
## 2025 Nine Mile Regional Trail Reconstruction | Three
## Rivers Park District, Minnesota | Project Manager
Kellie is the project manager for this federally-funded
project in the City of Hopkins. This project includes the
reconstruction of approximately ½-mile of regional trail
along 11th Avenue South. The project scope consisted of
easement analysis, ADA improvements, and close
coordination with the City of Hopkins to remove a
northbound lane of 11th Avenue S in conjunction with
recommendations from a Corridor Study.
## 2019 Infrastructure Improvements | Lauderdale, MN |
## Project Manager
Kellie provided project management, client coordination,
and led the design efforts for the reconstruction of ½ mile
of roadway and storm sewer, mill and overlay of ½ mile of
roadway, construction of 800’ of alleyways, and
replacement of 3,000 feet of watermain. The project
required coordination with Ramsey County during the
turnback process, close collaboration with St. Paul
Regional Water Services during the design and
construction of the water main (a portion of which was
installed using trenchless methods), and ongoing
communication between residents and key stakeholders.
## 2023 Houlton Area Roadway and Drainage
## Improvements | St. Joseph, WI | Design
## Lead/Assistant Project Manager
Kellie was the lead designer and assistant project
manager for this urban reconstruction project. This half-
mile network of roads consisted of narrow roads with
aging pavement and a multitude of drainage issues,
including an eroding raving downstream of the
neighborhood. The improvements combined rural and
urban sections, a storm sewer network, and stabilization
of an eroding ravine. It also included engagement,
roadway, and storm sewer improvements, and grant
requirements for the ravine stabilization component.
## 2021 Lookout Trail Improvements | Oak Park Heights,
## Minnesota | Design Lead
Kellie was the lead designer and project manager on this
project that reconstructed 2,200 feet of urban roadway
that was recently turned back to the City. Key components
of this project included close coordination with residents
and the city regarding pedestrian safety, driveway access,
and parking; coordination with private utilities regarding
utility relocation; and phasing of the project to maintain
access to an adjacent scenic overlook.
## 2020 Downtown Area Street and Utility Improvements
## | Centerville, MN | Project Manager
Kellie provided project management, client coordination,
and design oversight for this street, watermain, and storm
sewer reconstruction project. This project included the
reconstruction of 3,200 feet of street and storm sewer and
installation of 3,000 feet of new watermain in a
neighborhood in the City’s downtown area. Key
components of this project included assistance with
procuring Anoka County grant funding, water services and
well abandonment coordination with residents, streets and
utility design to accommodate future redevelopment, and
stormwater reuse for stormwater management.
Page 24 of 43
## Tyler J. McLeete PE
## Principal, Practice Leader
18 years of experience · Minneapolis, Minnesota
Tyler is a principal and practice leader in Stantec’s
municipal and urban mobility engineering team. He
brings extensive experience delivering road
reconstruction projects. Tyler serves as Stantec’s
client service manager for Minneapolis and Hennepin
County, and as project manager for various projects
throughout greater Minnesota. His responsibilities
include civil and municipal design, oversight of plan
and specification preparation, project management,
report preparation, cost estimates, construction
administration, and communication with city staff,
agencies, and public stakeholders.
## EDUCATION
## Bachelor of Science, Civil Engineering Major,
## Construction Management Minor, University of
## Minnesota, Minneapolis, MN
## REGISTRATIONS
## Professional Engineer #51774, Minnesota
## MEMBERSHIPS
## City Engineers Association of Minnesota
## American Public Works Association
Women in Transportation (WTS)
## Minnesota Surveyors and Engineers Society
## AWARDS
## 2020 APWA National Award, Minneapolis North Loop
## Reconstruction
## PROJECT EXPERIENCE
## Broadway Street NE Paving Improvements |
## Minneapolis, MN | Project Manager
## Broadway Street NE from Stinson Boulevard to Industrial
Boulevard in Northeast Minneapolis is the reconstruction
of an industrial corridor including shared-use pedestrian
facilities. Stantec is providing final design from 30%
layout through bidding. The project includes Federal
funding. Tyler serves as project manager leading project
coordination, communication, and QA/QC.
## Historic North Loop Public Realm Reconstruction |
## Minneapolis, MN | Project Manager
Tyler served as project manager on the award-winning
## Historic North Loop Project which reconstructed
approximately one mile of city streets within a historic
district. With the area’s transition from primarily industrial
to mixed-use commercial and residential in mind, Tyler
worked closely with the City of Minneapolis and its
multiple departments to design and deliver a project that
not only improved pedestrian access and safety but also
preserved the historic aspect of the Warehouse District.
## Nicollet Avenue Reconstruction (CSAH 52) | Richfield,
## MN | Project Manager
Tyler led the design and delivery of the multimodal
reconstruction project for Hennepin County within the City
of Richfield. This 1.3-mile reconstruction project includes
extensive public engagement and implementation of a
variety of multimodal and complete street elements
including roundabout(s), off-street bike facilities, Green
Stormwater Infrastructure, and support for future BRT
along the corridor. The design team completed an
extensive analysis of the public utility infrastructure to
provide recommendations on methods of reconstruction of
the impacted sewer and water facilities.
## 1st Avenue Reconstruction | Minneapolis, MN |
## Multimodal Engineering and Final Design Lead
This initiative will transform the half-mile stretch between
North 8th Street and Washington Avenue into a vibrant,
multimodal pedestrian corridor. The project aims to
enhance the public realm with expanded, ADA-compliant
sidewalks, upgraded bicycle facilities, dynamic, flexible
street design, new pavement, curb and gutter,
underground utilities, lighting, signals, and the addition of
trees and ultra-urban green infrastructure elements,
including street-level plantings.
## Broadway Avenue Road Lane Reduction | Winona, MN
## | Project Manager
Tyler served as project manager on the downtown
roadway diet in Winona. To help Winona finance the $3.1
million project, Stantec successfully prepared applications
for supplemental state and federal funds. The City
received $900,000 of Transportation Alternatives funding
through the state and $1 million in Federal Accelerated
Innovation Deployment (AID) Demonstration grant funds.
## Upper Harbor Terminal Infrastructure Engineering and
## Design | Minneapolis, MN | Deputy Project Manager
Tyler is leading the infrastructure design for this 48-acre
Upper Harbor Terminal area, stretching just under one
## mile along the Mississippi River in North Minneapolis. This
project will transform the largest redevelopment site in the
city. Tyler is leading a multi-disciplinary and collaborative
team to design the public infrastructure and support the
creation of a great public space.
## 2021 Evanswood | Maple Grove, MN | Project Manager
Tyler provided the city trunk roadway utility planning and
oversight of the infrastructure needed to support a 140+
acre residential redevelopment.
## 2021 TH 43 Public Utility Improvements | Winona, MN |
## Project Manager
Tyler designed and prepared construction and bidding
documents for the reconstruction of deficient segments of
existing watermain and sanitary sewer for inclusion in
MnDOT’s TH 43 Mankato Avenue Improvements project.
Page 25 of 43
Andrew S Boyle P.E.
## Senior Civil Engineer
12 years of experience · Minneapolis, Minnesota
Andrew is a senior civil engineer within our municipal
and multimodal engineering team who has extensive
experience delivering multi-modal, street and utility
reconstruction, and retrofit projects. He is a car-lite
Minneapolis resident and passionate about improving
non-auto-based transportation modes as a way to
build community, improve safety, and achieve
economic and environmental goals.
## EDUCATION
## Bachelor of Science, Geography, University of Minnesota
## Twin Cities, Minneapolis, MN
## Bachelor of Civil Engineering, University of Minnesota
## Twin Cities, Minneapolis, MN
## REGISTRATIONS
## Professional Engineer #56703, Minnesota
## MEMBERSHIPS
## Member, City Engineers Association of Minnesota
## PROJECT EXPERIENCE
## Downtown East Reconstruction | Minneapolis, MN |
## Design Engineer
Andrew worked collaboratively with City staff, the lead
engineering firm, and State Aid Hydraulics to design
storm sewer and green infrastructure elements, for this
challenging downtown reconstruction. He also designed
modifications for utilities and assisted with the design and
review of the streets, bike, and pedestrian facilities.
## Capital City Bikeway Wabasha Extension | St. Paul,
## MN | Project Manager / Design Lead
Andrew served as project manager and design lead for a
complex downtown bikeway and streetscape project. He
led corridor design development, coordinated
multidisciplinary engineering tasks, and supported
stakeholder engagement for a constrained urban
environment. He guided design decisions related to
sidewalk-level bikeway facilities, pedestrian
improvements, stormwater infrastructure, and ADA-
compliant curb ramps while coordinating closely with City
staff and project partners to advance the project through
design and construction preparation.
## Upper Harbor Terminal Infrastructure Engineering
## and Design | Minneapolis, MN | Design Engineer
Andrew assisted in the design and review of the
parkways, parkway storm sewer, green infrastructure,
utilities, and the review of the Dowling Ave storm sewer
and green infrastructure on this large collaborative City of
Minneapolis project.
## Phillips Traffic Safety Project | Minneapolis, MN, |
## Project Manager, Lead Design Engineer
Andrew worked with City transportation planners and
engineers to engage the Phillips community and deliver
concept designs and 100% plans of a AAA bikeway along
## East 24th Street between I-35W and Hiawatha Ave, and
targeted safety improvements at several intersections
along E 24th Street, Chicago Ave S, and E 28th Street
corridors to meet the residents’ needs, as well as safety
and environmental goals. The project involved
coordination with Metro Transit to mitigate the impact on
existing routes and design curb extensions that could
accommodate bus stops. He also coordinated with private
utilities and MWMO to develop green infrastructure.
## Broadway Avenue ADA Improvements | Winona, MN |
## Lead Design Engineer
Andrew designed ADA compliant ramps for 94 quadrants
in a challenging corridor retrofit that included a mill and
overlay and minor storm sewer modifications.
## MnDOT TH 43 Reconstruction | Winona, MN | Utility
## Engineer
With an aging infrastructure and major safety concerns
along this corridor, this is one of MnDOT’s and the City’s
highest priority projects in the Rochester District. Stantec
was responsible for the project management activities
including managing the design, leading the public
involvement efforts, coordinating a major multimodal
traffic study, environmental documentation (including
preparation of a CATEX), and coordination of public and
private utilities.
## Winona - Mankato Ave Utility Improvements | City of
## Winona | Winona, Minnesota, United States | 2021 |
## Design Engineer
Andrew designed the water an utility infrastructure along
Mankato Avenue in coordination with a MnDOT
reconstruction that was concurrently being designed. The
project required lots of coordination work and creative
solutions including horizontal directional drilling, pipe
bursting, and pipe lining due to MnDOT requirements,
limited ROW space, and extensive private utilities.
## Northside Greenway | Minneapolis, MN | Preliminary /
## Final Design Lead
Andrew served as preliminary design lead for the full four-
mile corridor and led final design for the first two miles. He
coordinated with City of Minneapolis staff, the prime
consultant, and private utilities to develop an innovative
urban retrofit focused on traffic calming and improved
bicycle and pedestrian connectivity across North
Minneapolis. Andrew guided design development for
roadway, utility, and streetscape elements, helping
advance a safe and comfortable east–west route that
responds to neighborhood context and multimodal needs.
Page 26 of 43
## Joseph Pond PE
## Civil Engineer
16 years of experience · Minneapolis, Minnesota
Joe is a professional engineer with experience
focusing on municipal infrastructure projects including
roadway and utility design. Joe’s experience,
knowledge and skills allow him to deliver high-quality
projects for our clients.
## EDUCATION
## Bachelor of Science, Civil Engineering, University of
## Minnesota, Minneapolis, Minnesota, United States, 2008
## REGISTRATIONS
## Professional Engineer #51829, Minnesota
## PROJECT EXPERIENCE
## 2020 Downtown Area Street and Utility Improvements
## | Centerville, MN | Design Lead
Joe led the design team for this urban street, watermain,
and storm sewer reconstruction project. This project
included the reconstruction of 3,200 feet of street and
storm sewer and installation of 3,000 feet of new
watermain in a neighborhood in the City’s downtown
area. Key components of this project included assistance
with procuring Anoka County grant funding, coordination
of water services and well abandonment with residents,
design of streets and utilities to accommodate future
redevelopment, and use of an adjacent stormwater reuse
system to provide stormwater management.
## 2026 Bishop Drive Street and Utility Reconstruction |
## Westerville, OH | Design Lead
Joe is the lead designer for this project that consists of
street and utility reconstruction for ½-mile of urban
residential roadway. Components of this project include
full reconstruction of the roadway, adding sidewalks to
both sides of the street, watermain and storm sewer
replacement, and coordination with private utilities.
## 2023 Houlton Area Roadway and Drainage
## Improvements | St. Joseph, WI | Design Lead
Joe led the design of this neighborhood roadway
reconstruction. The project expanded to over 0.5 mile of
full depth roadway reconstruction including storm sewer.
Improvements for an eroding ravine area through storm
water management improvements and permanent
stabilization methods. Joe was responsible for
preliminary and final design, plan production, cost
estimates and specifications as well as coordination with
property owners and private utility owners.
## 2025 Nine Mile Regional Trail Reconstruction | Three
## Rivers Park District, Minnesota
Joe led the design for this federally-funded project located
in the City of Hopkins. This project includes the
reconstruction of approximately ½-mile of regional trail
along 11th Avenue South. The project scope consisted of
easement analysis, ADA improvements, and close
coordination with the City of Hopkins to remove a
northbound lane of 11th Avenue S in conjunction with
recommendations from a Corridor Study.
## 2022-2023 Street Rehabilitation Project | Mounds
## View, MN | Design Lead
Joe led the design, plan production, and cost estimating of
this 2-mile roadway rehabilitation project to state aid
standards. The project reclaimed the existing roadway
and provided new curb and gutter, storm sewer
replacement, sanitary sewer lining, signing and lighting
improvements. An ADA compliant multi-use pedestrian
path was included for the entire length of the project
providing a critical longitudinal link between existing
pedestrian facilities on each end of the project. An
additional 0.4 miles of ADA compliant trail were added to
the project to link existing and future pedestrian facilities.
## 2021 Lookout Trail Improvements |
## Oak Park Heights, MN | Design Engineer
This project reconstructed 2,200 feet of urban roadway
that was recently turned back to the City. Key components
included close coordination with residents and the city
regarding pedestrian safety, driveway access, and
parking; coordination with private utilities regarding utility
relocation; and phasing of the project to maintain access
to an adjacent scenic overlook.
## 2019 Infrastructure Improvements | Lauderdale, MN |
## Design Lead
Joe led the design of ½ mile of roadway reconstruction
and ½ mile of mill and overlay. This project introduced
concrete curb and gutter, improved storm sewer and
watermain, and completed alleyway connections.
Coordination was required with adjacent property
## developers, St. Paul Regional Water Services, and other
private utility owners.
## Minnesota River Bluffs Regional Trail Extension* |
## Carver, Minnesota | Design Engineer
As the lead design engineer, Joe was responsible for daily
coordination of preliminary design and construction plan
preparation. This 2-mile multi-use trail included a trailhead
and parking amenities, a bridge and an alignment atop an
existing railroad bed and levee of the Minnesota River.
Page 27 of 43
## Aaron Nemitz EIT
## Civil Designer
8 years of experience · Minneapolis, Minnesota
Aaron is a civil designer with expertise in municipal
and transportation stormwater management, hydraulic
modeling, and flood mitigation strategies with strong
technical skills designing and analyzing complex
drainage systems to support resilient infrastructure.
Aaron is proficient in HydroCAD, HEC-RAS, and
XPSWMM, as well as other modeling and design
tools, enabling him to deliver accurate and efficient
solutions for water resources projects. His work
emphasizes sustainable design practices and
compliance with regulatory requirements.
## EDUCATION
## Bachelor of Science in Biosystems Engineering,
## University of Minnesota, Minneapolis, MN
## CERTIFICATIONS & TRAINING
## Design of Construction - SWPPP, University of
## Minnesota, Minneapolis, MN
## Contractor On-Track Safety, FRA 214 Railroad
## Workplace Safety, Minneapolis, MN
## REGISTRATIONS
## Engineer-In-Training #154854, Minnesota
## PROJECT EXPERIENCE
## Nicollet Avenue Stormwater System Design and
## Permitting | Bloomington, MN | Stormwater Lead
Aaron was lead stormwater engineer for this 2.3-mile
urban roadway corridor reconstruction, which included
underground stormwater BMPs and an extensive storm
sewer system meeting State-Aid, City, County, and
Watershed District standards. He worked with regulators
and stakeholders to navigate large, complex sewershed
areas, extensive in-place utilities, MPCA Superfund
contamination areas, and multiple watershed
jurisdictions. The design used XPSWMM, MicroStation
## Open Roads Designer, and HydroCAD stormwater
modeling software.
## TH 41 & CSAH 61 Stormwater System Design and
## Permitting | Chaska, MN | Water Resources Engineer
Aaron led the storm sewer and treatment BMP design for
this multi-road reconstruction project through the center
of downtown Chaska, MN in a manner that met State-
Aid, City, County, and Watershed District standards.
Project specific stormwater challenges included large
offsite sewersheds, internal levee drainage, local lift
station design, and extensive existing utilities.
## Creek Road/Savanna Way Stormwater System Design
## and Permitting | Chaska, MN | Water Resources
## Engineer
Aaron led the design of a complex stormwater system
including storm sewer, wet ponds, and biofiltration basins
used to treat new impervious from a new City road. The
project required significant coordination with the City to
design the system to allow for future roadway expansion
and stormwater service to potential future development.
The system was also designed to meet City, Watershed,
and State-Aid requirements.
## SDDOT Interstate 90 Drainage Design | Sturgis, SD |
## Water Resources Engineer
Aaron worked with a team of Stantec's Transportation
engineers to locate and size culverts and manage median
drainage along a three-mile stretch of Interstate being
reconstructed near Sturgis, SD. The design consisted of
determining peak flow rates to each pipe, sizing pipes to
meet allowable headwater and velocity requirements, and
ensuring adequate median ditch and drain capacities per
SDDOT design requirements. The hydraulic modeling
software HY-8 was used for the design.
## TH-30 Flood Analysis and Improvement Study |
## Danville Township, MN | Water Resources Engineer
Aaron used the hydrologic modelling software XPSWMM
to evaluate a riverine system that frequently overtopped
TH-30 in southern Minnesota. The system was modeled
in both one and two dimensions to quantify current
flooding and develop a number of solutions to help
mitigate flooding issues along the road caused by local
runoff and rising river levels. Project deliverables included
a report highlighting the peak flood reduction of eleven
potential solutions, as well as animated flood elevation
maps showing the extent of flooding as it occurred
throughout several modeled storm events.
## Gleason Fields Stormwater System Design | Maple
## Grove, MN | Water Resources Engineer
Aaron designed a complex stormwater collection and
conveyance system in conjunction with the complete
redesign of Gleason Fields Park. The design and
modeling were done in HydroCAD, which was used to
evaluate peak discharge rates leaving the park and
mitigate existing drainage issues on neighboring
residential properties.
## St. Cloud Park Improvements | St. Cloud, MN | Water
## Resources Engineer
Aaron designed integrated stormwater BMPs and piping
systems within three parks in the City of St. Cloud that
achieved required water quality and volume reduction
goals. The designs accounted for local and upstream
drainage while optimizing usability of the park space and
focused on safety for baseball fields and playground.
Page 28 of 43
* denotes projects completed with other firms
## Rick Kreuser
## Senior Construction Manager
39 years of experience · Minneapolis, Minnesota
Rick is a Senior Construction Manager with m
experience in the public sector. Before joining Stantec,
Rick worked as a senior project manager for the City
of Minneapolis in the Transportation Engineering and
Design Division and was the project manager on
several major capital projects. Rick has extensive
experience in project delivery, from planning and
funding to coordinating public engagement with
stakeholders and construction management through
finalization. He is a strong project manager who is
adept at leading field survey crews and design teams.
Rick brings a vast and unique perspective to teams
given his experience working for the City of
## Minneapolis and on MnDOT, Hennepin County, and
Metropolitan Council, multi agency projects. Rick’s
responsibilities include civil and municipal design,
constructability reviews, plan preparation, project
management, construction management/mentorship,
communication with City staff, other public agencies,
public stakeholders, and client management.
## EDUCATION
## Land Surveying, Dunwoody College of Technology ,
## Minneapolis, MN
## Engineering Drafting, Anoka Technical College,
## Anoka, MN
## PROJECT EXPERIENCE
## Capital City Bikeway Wabasha Extension |
## St. Paul, MN | Constructability
Rick provided constructability review for a constrained,
high-profile urban corridor. His involvement focused on
identifying construction sequencing issues, access
constraints, and utility conflicts associated with sidewalk-
level bikeway facilities, ADA-compliant curb ramps,
stormwater improvements, and signal upgrades. Rick’s
input helped inform design decisions that balanced
multimodal needs while accommodating adjacent
properties, venues, and concurrent public projects.
## 1st Avenue North Reconstruction | Minneapolis, MN |
## Constructability /Utility Coordination
Rick provided constructability review and utility
coordination support for a multimodal corridor
reconstruction. His role included reviewing plans for
underground utility replacements, coordinating conflicts
with existing infrastructure, and advising on construction
phasing. Rick’s experience with complex projects
informed practical solutions for sequencing roadway,
sidewalk, and utility work while supporting ADA
upgrades, bicycle facilities, and streetscape
improvements.
## Robert Street Construction | St. Paul, MN |
## Construction Advisor
Rick served as a construction advisor, drawing on
decades of public-sector and urban construction
management experience. He provided guidance on
construction staging, coordination among multiple
agencies, and management of impacts to traffic, utilities,
and adjacent properties. His advisory support helped the
project team anticipate construction risks, address field
issues efficiently, and align construction activities with
project goals for safety, access, and schedule.
## Historic Nicollet Mall Project | Minneapolis, MN |
## Project Manager / Utility Coordination
As project manager for the project, Rick led delivery of a
$50 million reconstruction through the core of downtown
Minneapolis. He managed design, construction, and utility
coordination for a complex corridor that included full
sanitary sewer replacement, major utility conduit work,
and multiple private utility upgrades. Rick coordinated
closely with transit agencies, downtown organizations,
business owners, and public stakeholders while
overseeing construction management and integration of
public art elements. His leadership supported successful
delivery of a highly visible transit and pedestrian mall in an
active urban environment.
## Marquette Avenue and 2nd Avenue Bus Rapid Transit
(BRT) Project (MARQ2)* | Minneapolis, MN | Design
## Lead and Construction Manager
The MARQ2 project was a full reconstruction of two miles
of roadway. Rick worked as the design lead and
construction manager for the award-winning project. He
worked closely with the design consultant for “over-the-
shoulder review” during the design phase, and
coordinated daily construction activities, communications,
and coordination with Metro Transit, contractors, and
stakeholders. The project improved drive time for
downtown and with real-time signage, improved
communication with transit riders.
## CCLRT Central Corridor | Minneapolis–St. Paul, MN |
## Utility Coordination / Construction Manager
Rick served as construction manager and utility
coordination lead for Metro Transit’s Green Line between
Minneapolis and St. Paul. Acting as the primary liaison
among the City of Minneapolis, University of Minnesota,
## Hennepin County, Metro Transit, and contractors, he
coordinated LRT construction through dense urban areas
and major institutional corridors. Rick oversaw day-to-day
construction related to city infrastructure, traffic
management, and utilities, and supported final
acceptance of municipal facilities and coordination of
project funding agreements.
Page 29 of 43
## DAN EDGERTON, AICP
## V
ice President
Dan is a Vice President at Zan Associates and brings over 15 years of
experience in multimodal transportation planning and design public and
stakeholder engagement, and project delivery. He is an accomplished
engagement professional and brings an ideal combination of experience
and expertise in mentorship and planning to advise project staff on
engagement for this project. He understands the complex relationship
between community values, technical constraints, and agency policy
direction and is passionate about engaging communities and
stakeholders in relevant and meaningful conversations to inform project
solutions. Dan is a Richfield resident and lived off 69th Street for 10 years.
## RELEVANT PROJEC
## T EXPERIENCE
## Penn Avenue Safety Improvements / Hennepin County
Dan oversees engagement implementation for this multi-year
reconstruction. Zan Associates, as part of a consultant team, is leading the
public engagement process for the reconstruction of Penn Avenue
through Richfield, Minnesota. Engagement tasks include public open
houses, pop-up listening sessions, and working with Hennepin County, the
City of Richfield, and the consultant team to gather current and past
experiences using the roadway before design options are brought to the
public.
Penn Avenue Corridor Study / Hennepin County + City of Richfield
Dan was the project manager for the development of design concepts
for the reconstruction of Penn Avenue. This community-based process is
focusing on providing improved multimodal solutions along Penn
Avenue, improved public realm treatments, and improved connections
for bicycles and pedestrians.
## Pedestrian Plan / City of Richfield
Dan led the plan development process, which included a non-traditional
approach to understanding pedestrian demand based on contextual
factors such as land use, population density, and proximity to activity
centers. A key outcome of this plan was to create a citywide and project
specific process to appropriately balance pedestrians in context with all
other modes, based on community values which were informed by
community engagement.
Edina Comprehensive Plan + Small Area Plans / City of Edina
Dan was responsible for developing and implementing stakeholder and
community engagement, including working with stakeholder
committees. The focus of this project was to complete three small area
plans and a city-wide comprehensive update for the City of Edina.
Engagement activities were purposefully developed to ensure that the
final planning products reflected the values of the community, while
recognizing technical and regulatory constraints.
## EDUCATION
## Master of Urban + Regional
## Planning / Minnesota State
## University
## Bachelor of Science in Finance,
## Insurance, + Real Estate / Saint
## Cloud State University
## PROFESSIONAL
## AFFILIATIONS
## APA / MN Chapter Program
## Committee Former Co-Chair
## TRAINING/
## CERTIFICATIONS
## American Institute of Certified
Planners (AICP)
## IAP2 Fundamentals in Public
## Participation / Certification
## CONTACT
(c) 612.207.5722
(o) 612.354.2101
dedgerton@zanassoc.com
www.zanassoc.com
105 5th Ave S, Suite 130
## Minneapolis, MN 55401
Page 30 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 10
Stantec Consulting Services Inc.
Preparation and submittal of Stormwater Management Plan and permit applications
1.
## Divider or Appendix
## Appendix B
## Fee Estimate
Page 31 of 43
NameMcLeete, Tyler Schlegel, Kellie Roeber, DanielRuhl, PriceBoyle, AndrewPond, JosephPriya, AvraVoelker, Steven
## Terhaar,
## Edward
## Nemitz, AaronMischio, OwenJohnson, TylerGravel, PhilKreuser, Rick
## Leonard,
## Michael
Khanna, Prekshi FitzPatrick, MikeBollu, AnkitaOehrlein, Chuck Capra, Andrea
## Chapman,
## Debbie
## ExpensesZan Associates
Project Billing Rate (T&M )$223.00$212.00$212.00$300.00$203.00$203.00$177.00$212.00$223.00$197.00$164.00$285.00$251.00$223.00$203.00$177.00$223.00$197.00$223.00$164.00$183.00$1.00$1.00
Total Units (T&M )6448120561606267443412172272261856465247588262050072,745.25 Project Summary Hours Labour Expense Subs Total
Fee (T&M )$14,272.00$101,972.00$4,240.00$16,800.00$32,480.00$127,078.00$131,688.00$7,208.00$2,676.00$33,884.00$44,608.00$7,410.00$4,518.00$12,488.00$9,338.00$9,204.00$10,481.00$11,426.00$1,784.00$4,264.00$3,660.00$500.00$72,745.25 Fixed Fee0$0.00$0.00$0.00$0.00
Escalation (T&M )$365.09$2,989.24$0.00$0.00$343.60$3,732.02$4,871.04$288.32$34.87$368.05$590.44$46.74$180.72$381.21$295.49$254.88$368.90$405.97$71.36$170.56$87.50$0.00$0.00 Time & M aterial2,998$607,325.01$500.00$72,745.25$680,570.26
Total Fee (T&M )$14,637.09$104,961.24$4,240.00$16,800.00$32,823.60$130,810.02$136,559.04$7,496.32$2,710.87$34,252.05$45,198.44$7,456.74$4,698.72$12,869.21$9,633.49$9,458.88$10,849.90$11,831.97$1,855.36$4,434.56$3,747.50$500.00$72,745.25 Total2,998$607,325.01$500.00$72,745.25$680,570.26
Task Code Task Name Start Date End DateUnits Task Type Hours Labour Expense Subs Total Comments
1
## 69th Street Improvements
2026/05/012027/12/31Time & M aterial2,998$607,325.01$500.00$72,745.25$680,570.26
1.1
## Topographic Survey & Structure Investigation
2026/05/012026/08/01Time & Material114$28,356.00$0.00$0.00$28,356.00
1.1.1Topo Survey2026/05/012026/07/0124404Time & Material50$14,084.00$0.00$0.00$14,084.00Includes utilities/GSOC
1.1.2Structure Inventory/Measure Downs2026/05/012026/07/0116Time & Material16$4,800.00$0.00$0.00$4,800.00
## 1.1.3Create Parcel Basemap2026/05/012026/08/0116Time & Material16$3,392.00$0.00$0.00$3,392.00
1.1.4
## Create Topo Basemap
2026/05/012026/07/011616Time & Material32$6,080.00$0.00$0.00$6,080.00
Includes utility linework
1.2
## Public Engagement
2026/05/012027/09/3072,745.25Time & Material82$17,472.74$0.00$72,745.25$90,217.99
ZAN Support for up to 4 meeting
1.2.1
## Richfield Transportation Commission
2026/05/012027/09/30288Time & Material18$3,845.39$0.00$0.00$3,845.39
One staff. Up to 4 meeting. Includes presentation material and
attendance.
1.2.2
## Open Houses
2026/05/012027/09/3021616Time & Material34$7,235.38$0.00$0.00$7,235.38
Two staff. Up to 4 meetings. Includes coordination, presentation
material, attendance, and summary.
1.2.3
## Pop-Up Events
2026/05/012027/09/30288Time & Material18$3,845.39$0.00$0.00$3,845.39
Two staff. Up to 2 meetings. Includes coordination, presentation
material, attendance, and summary.
1.2.4
## Project Website
2026/05/012027/09/302244Time & Material12$2,546.58$0.00$0.00$2,546.58
Zan provides content with support from Stantec. Website hosted
by city. Material for launch plus 4 updates.
1.3
## Preliminary Design & Bikeway Alternative Analysis
2026/05/012027/02/28Time & Material376$75,948.57$0.00$0.00$75,948.57
1.3.1Concept Typical Sections and Layouts2026/05/012027/02/28460408428Time & Material126$26,086.57$0.00$0.00$26,086.57Up to 3 layout options/cross sections
1.3.2
Retaining wall investigations and report
2026/05/012026/09/30816Time & Material24$4,456.00$0.00$0.00$4,456.00
1.3.3
## Site Visit/Photos
2026/05/012026/09/304446Time & Material18$3,770.00$0.00$0.00$3,770.00
1.3.430% Design2026/10/012026/12/304164080404Time & Material184$36,616.00$0.00$0.00$36,616.0030% Plans and EOPC
1.3.5
## Geotechnical Coordination and Review
2026/05/012026/09/30422Time & Material8$1,700.00$0.00$0.00$1,700.00
1.3.6
## Preliminary Utility Coordination
2026/05/012026/09/3088Time & Material16$3,320.00$0.00$0.00$3,320.00
1.4
## Stormwater Analysis & Management Plan &
## Permitting
2026/05/012027/09/15Time & Material444$81,961.03$0.00$0.00$81,961.03
1.4.1Background Data/Regulatory Review2026/05/012026/09/30488Time & Material20$3,736.00$0.00$0.00$3,736.00Includes up to 2 meetings with agencies/City
1.4.2Existing Conditions2026/05/012026/09/3024244Time & Material52$9,804.00$0.00$0.00$9,804.00
1.4.3Proposed Conditions/BMP Design2026/05/012026/09/3040408Time & Material88$16,720.00$0.00$0.00$16,720.00
1.4.4
## Stormwater Mgmt Plan / memo
2026/05/012026/09/308164Time & Material28$5,340.00$0.00$0.00$5,340.00
1.4.5
## Watershed and State Aid Submittal
2026/05/012026/09/3028162Time & Material28$5,194.00$0.00$0.00$5,194.00
1.4.6
## Storm Sewer Design
2026/05/012027/09/15601608Time & Material228$41,167.03$0.00$0.00$41,167.03
30%, 60%, 90%, 100%
1.5
## Final Design
2027/03/012027/09/15Time & Material1,623$327,099.76$0.00$0.00$327,099.76
1.5.160% Design2027/03/012027/06/01Time & Material0$0.00$0.00$0.00$0.00
1.5.1.1Roadway2027/03/012027/06/018401202008424Time & Material386$76,675.04$0.00$0.00$76,675.04
1.5.1.2Lighting2027/03/012027/06/016122Time & Material20$4,313.92$0.00$0.00$4,313.92
1.5.1.3Watermain2027/03/012027/06/01881222Time & Material32$6,647.68$0.00$0.00$6,647.68
1.5.1.4Sanitary Sewer2027/03/012027/06/011281622Time & Material40$8,265.92$0.00$0.00$8,265.92
1.5.1.5Cost Estimate/SEQ2027/03/012027/06/01483212Time & Material47$9,103.12$0.00$0.00$9,103.12
1.5.1.6
## Utility Coordination
2027/03/012027/06/01884Time & Material20$4,380.48$0.00$0.00$4,380.48
1.5.290% Design2027/06/012027/08/01Time & Material0$0.00$0.00$0.00$0.00
1.5.2.1Roadway2027/06/012027/08/01824120240861624Time & Material446$87,611.68$0.00$0.00$87,611.68
1.5.2.2Lighting2027/06/012027/08/0128242Time & Material36$7,677.28$0.00$0.00$7,677.28
1.5.2.3Watermain2027/06/012027/08/01481222Time & Material28$5,765.76$0.00$0.00$5,765.76
1.5.2.4Sanitary Sewer2027/06/012027/08/01841222Time & Material28$5,803.20$0.00$0.00$5,803.20
1.5.2.5State Aid Submittals & Coordination2027/06/012027/08/01163248Time & Material60$12,467.52$0.00$0.00$12,467.52
1.5.2.6Specifications2027/06/012027/08/013216422484Time & Material72$15,250.56$0.00$0.00$15,250.56
1.5.2.7Cost Estimate/SEQ2027/06/012027/08/0142222Time & Material12$2,618.72$0.00$0.00$2,618.72
1.5.2.8Utility Coordination2027/06/012027/08/018124Time & Material24$5,224.96$0.00$0.00$5,224.96
## 1.5.3100% Design/Construction Documents2027/08/012027/09/15Time & Material0$0.00$0.00$0.00$0.00
1.5.3.1Roadway2027/08/012027/09/15816601208248Time & Material226$44,684.64$0.00$0.00$44,684.64
1.5.3.2Lighting2027/08/012027/09/15484Time & Material16$3,494.40$0.00$0.00$3,494.40
1.5.3.3Watermain2027/08/012027/09/1542822Time & Material18$3,762.72$0.00$0.00$3,762.72
1.5.3.4Sanitary Sewer2027/08/012027/09/15881222Time & Material32$6,647.68$0.00$0.00$6,647.68
1.5.3.5State Aid - Final Submittal2027/08/012027/09/15816Time & Material24$5,141.76$0.00$0.00$5,141.76
1.5.3.6Specifications/Project Manual2027/08/012027/09/158444412Time & Material36$7,508.80$0.00$0.00$7,508.80
1.5.3.7Cost Estimate/SEQ2027/08/012027/09/15248222Time & Material20$4,053.92$0.00$0.00$4,053.92
1.6Bidding2027/10/012027/12/31Time & Material31$6,283.68$0.00$0.00$6,283.68
1.6.1Document Upload and QuestCDN Coordination2027/10/012027/12/3114Time & Material5$902.72$0.00$0.00$902.72
1.6.2Contractor Questions and Addenda2027/10/012027/12/318824Time & Material22$4,598.88$0.00$0.00$4,598.88
1.6.3Bid Opening, Bid Tab, Recommendation Letter2027/10/012027/12/3122Time & Material4$782.08$0.00$0.00$782.08
1.7
## Project Management
2026/05/012027/12/30Time & Material328$70,203.23$0.00$0.00$70,203.23
1.7.1Monthly meetings with City2026/05/012027/12/301080Time & Material90$19,648.80$0.00$0.00$19,648.8020 Meetings
1.7.2Internal bi-weekly design meetings2026/05/012027/12/301080204042010410Time & Material198$42,465.56$0.00$0.00$42,465.5640 Meetings
1.7.3Project Management2026/05/012027/12/302020Time & Material40$8,088.87$0.00$0.00$8,088.872 hrs/month for 20 months
1.8Expenses2026/05/012027/12/31500Time & Material0$0.00$500.00$0.00$500.00Mileage
## FEE ESTIMATE - 69th St Reconstruction
Page 32 of 43
## Zan Associates Cost Proposal
## Project Name:
## Estimated PoP:16 months
## Anticipated Start Date:2026-05-01
## Anticipated End Date:2027-09-30
Date of submission:
2026-04-07
## Rate Sheet:
## Assumed Inflation: 3.00%
## President
## Vice
## President
## Senior
Associate 3
Sr.
Associate 2
Sr.
Associate 1
Associate 2Associate 1
## Sr. Creative
2
## Sr. Creative
1
Creative 2Creative 1AdminInternMktg Coord
## WBSTasksAssumptions
## Start DateEnd Date
283.55$ 239.20$ 224.90$ 190.35$ 154.25$ 121.90$ 102.30$ 190.35$ 154.25$ 121.90$ 102.30$ 82.95$ 82.95$ 265.90$
## HoursFeeEscalation
## Total Labor
0.0068.000.000.000.002.000.000.001.000.000.0016.000.000.0087.0017,990.85 - 17,990.85
1.1Project launchWorkplan and schedule, staff coordination, etc. 2026-05-012027-09-304.002.001.007.001,354.850.001,354.85
1.2Project administrationInvoicing, progress reporting, and general PM activities2026-05-012027-09-3032.0016.0048.008,981.600.008,981.60
1.3
Project meetings2026-05-012027-09-30
32.0032.007,654.400.007,654.40
0.0090.000.000.000.00166.000.000.0056.000.000.006.000.000.00318.0050,899.10 - 50,899.10
6.2
## Richfield Transportation
## Commission
One staff. Up to 4 meeting. Includes presentation
material and attendance.2026-05-012027-09-3024.008.0032.006,716.000.006,716.00
6.3Open Houses
Two staff. Up to 4 meetings. Includes coordination,
presentation material, attendance, and summary. 2026-05-012027-09-3050.0090.0024.004.00168.0026,964.800.0026,964.80
6.9Pop-Up Events
Two staff. Up to 2 meetings. Includes coordination,
presentation material, attendance, and summary. 2026-05-012027-09-302.0040.008.002.0052.006,754.300.006,754.30
6.7Project Website
Zan provides content with support from Stantec.
Website hosted by city. Material for launch plus 4 2026-05-012027-09-3010.0016.0026.004,342.400.004,342.40
6.8Project CommunicationsUp to 4 flyers and 1 yard sign design.2026-05-012027-09-304.0012.0024.0040.006,121.600.006,121.60
0.00158.000.000.000.00168.000.000.0057.000.000.0022.000.000.00
## HoursFeeEscalation
## Total Labor
- 37,793.60 - - - 20,479.20 - - 8,792.25 - - 1,824.90 - -
405.0068,889.95 -
68,889.95
## ItemAssumptionsUnits CostTotal
Handouts8.5 x 11, color.
5000.25 125.00 -
Mounted boards24 x 36, mounted in sleaves.
4020.65 826.00 68,889.95
Sandwich boardsFor event wayfinding
223.25 46.50 President$283.55Associate 2$121.903,855.30
Roll plots6 feet, color.
641.40 248.40 Vice President$239.20Creative 2$121.90
Engagement activitiesFor pop-ups and open houses.
641.40 248.40 Senior Associate 3$224.90Associate 1$102.3072,745.25
Refreshments for events$100 per event
6100.00 600.00 Senior Associate 2$190.35Creative 1$102.30JS
Translations$250 per document 6250.00 1,500.00 Senior Creative 2$190.35Admin$82.95
Mileage10 round trips. 2 staff. 18 miles each3600.73 261.00 Senior Associate 1$154.25Intern$82.95
## Senior Creative 1$154.25Media Specialist$265.90
3,855.30
## Approved By
2026 Standard
## Total Project Hours
Zan Associates reserves the right to assign work to any staff category, depending on the requirements of the project.
As such, we request that this rate card to be included in the professional services contract upon project award. Zan
Associates will not change staffing assignments without prior approval from the client project manager.
Rates are subject to an increase on January 1st of each year based on the inflation assumption (or master contract
terms if applicable). The escalation is based on that assumption.
## Expense Total
## Subcontractor Total
## Project Total
## Labor Total
## Total Category Cost
## FCCM
69th Street in Richfield
## Total Expenses
## Expenses
## Task 1. Project Management
## Task 2. Public Engagement
Page 1
Page 33 of 43
City of Richfield | 69th Street Reconstruction Project Stantec | 11
Stantec is a global leader in sustainable
engineering, architecture, and environmental
consulting. The diverse perspectives of our
partners and interested parties drive us to
think beyond what’s previously been done on
critical issues like climate change, digital
transformation, and future-proofing our cities
and infrastructure. We innovate at the
intersection of community, creativity, and
client relationships to advance communities
everywhere, so that together we can redefine
what’s possible.
Stantec Consulting Services Inc.
Page 34 of 43
## City Council Meeting 5/26/2026
## Agenda Section: Consent Calendar
Agenda Item: 7.c.
## Report Prepared By:
## Jennifer Anderson, Support Services Manager
## Department Director:
## Jay Henthorne, Police Chief
## Item for Consideration:
Consider approval of a request for a new Secondhand Goods Dealer license for
EcoATM, LLC, located at 826 West 66th Street (inside Speedway).
## EXECUTIVE SUMMARY
On May 8, 2026, the City received an application for a new Secondhand Goods Dealer
license for EcoATM, LLC, located at 826 West 66th Street (inside Speedway). All
required information, documents and fees have been received.
The Public Safety background investigation has been completed. The Public Safety
Director has reviewed the background investigation report. None of the information in
the report would cause the Public Safety Director to recommend denial of the requested
license.
## RECOMMENDED ACTION
By Motion: Approve the request for a new Secondhand Goods Dealer license for
EcoATM, LLC, located at 826 West 66th Street (inside Speedway).
## HISTORICAL CONTEXT
The Public Safety background investigation has been completed and reveals the
following:
The applicant has paid the required licensing fees.
The required license and permit bond for $1500.00 were issued by RLI Insurance
Company.
All real estate and personal property taxes due and payable for the premises have been
paid.
A criminal background check was conducted on the applicant and no criminal history
was found.
As a side note, on May 12, 2026, the Council approved the first Secondhand Goods
Dealer license for EcoATM, LLC, for a location at 6540 Penn Ave So. (CVS). Per city
code section 1186.21, each EcoATM requested location for a kiosk within the city
requires a new application and approval from the Council. If approved, this will allow a
second EcoATM in Richfield at the Speedway on 66th St and Rae Dr.
## EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS
The Richfield Police Department is committed to ensuring equity and inclusivity in our
Page 35 of 43
work. In some instances, equity considerations may not directly apply; however, DEI
principles are always considered.
## POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)
The applicant has complied with all the provisions of the application process.
## CRITICAL TIMING ISSUES
There are no critical timing issues.
## FINANCIAL IMPACT
Licensing fees have been received.
## LEGAL CONSIDERATIONS
There are no legal considerations.
## ALTERNATIVE RECOMMENDATION(S)
Deny the request for the Secondhand Goods Dealer license for EcoATM, LLC;
however, Public Safety has not found any basis for denial.
## ATTACHMENTS
## None
Page 36 of 43
## City Council Meeting 5/26/2026
## Agenda Section: Consent Calendar
Agenda Item: 7.d.
## Report Prepared By:
## Mark McKinley, Administrative Assistant
## Department Director:
## Katie Rodriguez, City Manager
## Item for Consideration:
Consider the approval of the second reading of an ordinance amending
Subsection 210.01 of the City Code related to City Council salaries for 2027 and
2028 and summary publication of said ordinance.
## EXECUTIVE SUMMARY
Chapter II, Section 210 of the City Code establishes the salaries of the City Council.
Subsection 210.01, Subd. 5 provides that salaries of Council Members shall be
reviewed by the City Council by May 1 in each year in which an election is held
pursuant to Section 200 of the Code. An ordinance amending the salaries established
by this section must not take effect until after the next succeeding municipal election.
City Council discussed council salaries during the April 28, 2026 work session and
directed staff to prepare the ordinance with no increase (0%) over the next two years for
Mayor and Council Member salaries.
City Council held the first reading of this report during the May 12, 2026 regular
meeting.
## RECOMMENDED ACTION
By Motion: Approve the second reading of the ordinance amending Subsection
210.01 of the City Code related to City Council salaries for 2027 and 2028 and
summary publication of said ordinance.
## HISTORICAL CONTEXT
The City has provided the same cost-of-living increase for all its employee groups for
many years. The anticipated cost-of-living increase for 2027 and 2028 is unknown at
this time. The cost-of-living increase for city employees in the General Pay Plan has
been 3% over the last 9 years. The 2027 cost-of-living increase will be set as part of the
budget process.
Since 2018, the City Council has taken the following actions related to Council wages:
2018: City Council approved that the salaries of the Mayor and Council Members shall
be increased by a percentage that was the lesser of 3.5% or the percentage increase to
match the General Services Pay Plan, effective January 1, 2019, and increased by a
percentage that was the lesser of 3.5% or the percentage increase in the General
Services Pay Plan effective January 1, 2020. In both years, the approved increase was
3%.
Page 37 of 43
2020: City Council approved that the salaries of the Mayor and Council members would
remain the same with no increase, effective January 1, 2021. The City Council directed
staff to provide an economic trigger in the ordinance for 2022 that would set the
increase to 0% if the economy has not improved, or, set the salary increase based on
what is granted to employees in the Management and General Services pay plan in the
previous year of 2021. The increase starting January 1, 2022, was 3%.
2022: City Council approved that the salaries of the Mayor and Council Members would
be increased to match the General Services Pay Plan, effective January 1, 2023, and
that the salaries would be increased to match the General Services Pay Plan, effective
January 1, 2024.
2024: City Council approved that the salaries of the mayor and council members would
be increased to match the General Pay Plan, effective January 1, 2025, and that the
salaries would be increased to match the General Pay Plan, effective January 1, 2026.
In the past, the City Council also reviewed and compared its salaries to Richfield’s peer
cities. That information is provided below for review:
## Mayor Salary (2026) City Council Salary (2026)
## Peer City Salary Peer City Salary
City of Roseville $10,620.00 City of Fridley $7,761.78
## City of Fridley $10,688.60 City of Inver Grove Heights $8,200.00
## City of Inver Grove
## Heights
$11,400.00 City of Roseville $8,220.00
City of Oakdale $12,000.00 City of Fridley (At-Large) $8,779.42
## City of Lino Lakes $12,400.00 City of Shakopee $9,000.00
City of Savage $12,487.80 City of Savage $9,503.36
City of Hopkins $12,500.00 City of Oakdale $9,600.00
## City of Cottage Grove $13,351.00 City of Eagan $10,000.00
## City of Eagan $13,625.00 City of Cottage Grove $10,057.00
City of Richfield (w/ 0%
increase)
$14,339.00 City of Lino Lakes $10,423.00
City of Brooklyn Center $14,857.00 City of Richfield (w/ 0%
increase)
$11,128.00
## City of Shakopee $15,000.00 City of Brooklyn Center $11,158.00
City of Maplewood $17,430.40 City of Hopkins $12,500.00
City of Maplewood $15,350.40
## EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS
Page 38 of 43
Regular evaluation of council compensation helps ensure that pay remains reasonable
and consistent with peer communities, without creating an undue financial burden for
those serving in a part-time elected role.
## POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)
Chapter II, Section 210 of the City Code establishes the salaries of the City Council.
## CRITICAL TIMING ISSUES
Council needs to establish its salaries for 2027 and 2028 by ordinance before the next
council election.
## FINANCIAL IMPACT
A zero percent increase would result in no change to current City Council compensation
levels for 2027 and 2028. There would be no additional impact on the General Fund
beyond maintaining existing budgeted amounts.
## LEGAL CONSIDERATIONS
None.
## ALTERNATIVE RECOMMENDATION(S)
The City Council could vote to approve a set-amount or percentage increase in 2027
and 2028.
## ATTACHMENTS
1. 05-26 Bill 2026-05
## 2. Resolution Summary Publication of Bill 2026-05
Page 39 of 43
City of Richfield May 26, 2026
## County of Hennepin
## State of Minnesota
## BILL NO. 2026-05
## DOCSOPEN\RC160\1\1084481.v2-4/15/26
Motion by:
Seconded by:
## AN ORDINANCE AMENDING SECTION 210 OF THE
## RICHFIELD CITY CODE PERTAINING TO CITY COUNCIL SALARIES
## THE CITY OF RICHFIELD DOES ORDAIN:
Section 1. Subsection 210.01 of the Richfield City Code is amended as follows:
Subdivision 1. Mayor. The annual salary of the mayor as of January 1, 20242026, is $13,518.62
$14,339.00. Effective January 1, 2025, the salary of the mayor shall be increased by a percentage that is
equal to the percentage increase in the annual pay structure granted January 1, 2025, to the General Pay
Plan.
Subd 2. Council. The annual salary of a member of the council as of January 1, 20242026, is
$10,492.73 $11,128.00. Effective January 1, 2025, the salary of a member of the council shall be increased
by a percentage that is equal to the percentage increase in the annual pay structure granted January 1,
2025, to the General Pay Plan.
Subd. 3. Compensation adjustment. There shall be no increase in the salary of the mayor or
council members for the calendar years 2027 and 2028. Effective January 1, 2026, the annual salary of the
mayor and a member of the council as provided in Subdivision 1 and 2 above shall receive an increase that
would match the increase in the General Pay Plan granted January 1, 2026.
Subd. 4. Payable. Salaries of members of the Council are payable bi-weekly.
Subd. 5. Salary review. The Council shall review the salaries set by this Section by May 1 in each
year in which an election is held pursuant to Section 200 of this code. An ordinance amending the salaries
as established in this Section must not take effect until after the next succeeding municipal election.
Section 2. Effective Date. This ordinance becomes effective on January 1, 2027.
Passed by the City Council of the City of Richfield, Minnesota this 26
th
day of May 2026.
## VOTING AYE VOTING NAY
## Supple, Mary Supple, Mary
## Burk, Walter Burk, Walter
## Christensen, Sharon Christensen, Sharon
## Coleman-Woods, Rori Coleman-Woods, Rori
## Hayford Oleary, Sean Hayford Oleary, Sean
__________________________
## Mary B. Supple, Mayor
## ATTEST:
_______________________
## Michelle Friedrich, City Clerk
Page 40 of 43
## DOCSOPEN\RC160\1\1096703.v1-5/20/26
## DOCSOPEN\RC160\1\1096703.v1-5/20/26
## RESOLUTION NO.
## RESOLUTION APPROVING SUMMARY PUBLICATION OF
## AN ORDINANCE PERTAINING TO CITY COUNCIL
## SALARIES
WHEREAS, the City has adopted the above-referenced Ordinance; and
WHEREAS, the verbatim text of the Ordinance is cumbersome, and the expense
of publication of the complete text is not justified; and
WHEREAS, the following summary clearly informs the public of the intent and
effect of the Ordinance.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of
Richfield that the following summary is hereby approved for official publication:
## SUMMARY PUBLICATION
## BILL NO. 2026-
## AN ORDINANCE AMENDING SECTION 210 OF THE
## CITY CODE PERTAINING TO CITY COUNCIL
## SALARIES
On May 26, 2026 the Richfield City Council adopted an Ordinance, designated
as Bill No 2026-____, the title of which is stated above. This summary of the Ordinance
is published pursuant to Section 3.12 of the Richfield City Charter. The purpose of the
Ordinance is to update the salaries of the mayor and city council members. There will
be no increase in their salaries for the calendar years 2027 and 2028.
Copies of the Ordinance are available for public inspection in the City Clerk’s office
during normal business hours or upon request by calling 612-861-9738.
Adopted by the City Council of the City of Richfield, Minnesota on this 26th day
of May 2026.
## May B. Supple, Mayor
## ATTEST:
## Michelle Friedrich, City Clerk
Page 41 of 43
## City Council Meeting 5/26/2026
## Agenda Section: Other Business
Agenda Item: 12.a.
## Report Prepared By:
## Mark McKinley, Administrative Assistant
## Department Director:
## Katie Rodriguez, City Manager
## Item for Consideration:
Consider alternate appointment to fill a vacancy on the Human Rights
Commission.
## EXECUTIVE SUMMARY
The City Council interviews candidates yearly in November and designates commission
appointees and alternates in case a vacancy arises. The City Council designated
Jocelynn Klos as an alternate appointment. A Human Rights Commissioner has
vacated their seat and Jocelynn has agreed to join the Human Rights Commission with
the term expiring January 31, 2029. Maintaining a full commission roster allows for a
diverse range of perspectives to be shared during each commission meeting.
Maintaining a full roster allows for more flexibility in instances where a quorum is
needed to conduct official business.
## RECOMMENDED ACTION
By motion: Approve the appointment of Jocelynn Klos as Human Rights Commissioner
commencing on May 26, 2026 and ending January 31, 2029.
## HISTORICAL CONTEXT
City advisory boards and commissions were established by City ordinance or resolution.
The council has previously appointed alternate commissioners to fill vacancies that
occur during an active term in order to maintain full commission membership and
support continued commission operations.
## EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS
Filling vacancies on advisory commissions helps ensure diverse community
perspectives are represented in commission discussions and decision-making
processes. Maintaining a full roster also supports consistent participation and the
commission’s ability to conduct official business.
## POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)
## None
## CRITICAL TIMING ISSUES
Timely appointment supports the commission’s ability to maintain quorum and conduct
official business.
Page 42 of 43
## FINANCIAL IMPACT
## None
## LEGAL CONSIDERATIONS
## ALTERNATIVE RECOMMENDATION(S)
The City Council may choose not to approve the appointment and instead direct staff to
continue recruitment efforts or consider alternate applicants for the vacancy.
## ATTACHMENTS
## None
Page 43 of 43