StoryFleet Electrification Analysis

Richfield Council bans ICE use of city property

The Richfield City Council unanimously approved an emergency ordinance Tuesday that prohibits federal immigration enforcement agents from using city-owned parking lots and vacant land for operations, responding to resident concerns about increased Immigration and Customs Enforcement activity in the community.

Meeting date: Feb 10, 2026
Published Jul 24, 2026

The 5-0 vote on the emergency ordinance came after 17 residents spoke during the public comment period about the impact of federal immigration enforcement on immigrant families, children, and local businesses. Residents urged the council to take action limiting police cooperation with federal agencies, reallocating police funding, and removing surveillance technologies. The ordinance, which takes effect immediately, prohibits the use of city-owned off-street property for civil immigration enforcement unless legally required or authorized by a judicial warrant. City staff clarified the measure does not apply to on-street parking or public areas inside city buildings.

City Manager Rodriguez outlined additional steps the city has taken to address community concerns, including allocating $50,000 in emergency rental assistance and distributing "know your rights" information. The city is also monitoring ICE vehicle traffic stops and filed an amicus curiae brief—a legal document supporting a case—alongside other municipal prosecutors. However, staff determined that a city-level eviction moratorium is legally unfeasible, though the council directed staff to explore local tenant protections, including an ordinance allowing an affirmative defense in eviction cases for income loss due to ICE involvement.

In other business, the council discussed a fleet electrification analysis that identified 24 city vehicles suitable for conversion to electric power, with estimated savings of $140,000 and significant greenhouse gas reductions. The council requested additional studies and a detailed financial analysis before making commitments, including a separate study for police vehicles. The council also approved a cooperative agreement with Hennepin County for the 2026-27 reconstruction of Nicollet Avenue from 77th Street to 66th Street, with Richfield's cost share estimated at approximately $7.99 million of the $23.8 million total project. The city is actively seeking state bond funds to reduce its financial burden.

Our proprietary artificial intelligence agent analyzed publicly available documents including meeting agendas, minutes, and transcripts to write this story to help inform local residents. Feedback helps us improve, so please consider rating how we did with the thumbs up or down below.

Go deeper on this topic

Research related meeting documents and build a brief — without rewriting the story.

Full analysis

Review and discuss the Fleet Electrification Analysis conducted by the fleet electrification consultant Sawatch Labs (Work Session - Jan 27, 2026)

Discussion Only; Additional work session discussion and studies requested.

Dissent: None

Sustainability Coordinator Lindholm presented findings that identified 24 light-duty vehicles as strong options for conversion to electric, with estimated savings of $140,000 and significant greenhouse gas reductions. Level 2 chargers at Public Works and City Hall were recommended. Deputy Public Works Director Link advocated for a phased approach, prioritizing infrastructure installation. Council discussion covered budget impacts, leasing vs. purchasing, and the need for a separate study for police vehicles and a detailed financial analysis before making commitments. Council expressed general support for exploring EV fleet vehicles cautiously.

Open Forum (Regular Meeting - Jan 27, 2026)

5-0 Approved

Dissent: None

Moved by Council Member Coleman-Woods [Approx. 07:45] · Seconded by Council Member Burk [Approx. 07:45]

The Open Forum was extended to 50 minutes, and an ADA accommodation for a 4-minute time limit was approved, allowing seventeen residents to speak. The primary themes were deep concerns about increased Department of Homeland Security (DHS) and Immigration and Customs Enforcement (ICE) activity in the city, its negative impacts on immigrant families, children, and the broader community. Residents urged the Council to take action, including limiting law enforcement's cooperation with federal agencies, reallocating police funding to community services, advocating for a statewide eviction moratorium, and reconsidering the use of surveillance technologies like Flock cameras. Many expressed pride in community solidarity and called for greater city transparency and protection for vulnerable residents.

Proclamation recognizing January 26–30 as Winter Salt Week 2026 (Regular Meeting - Jan 27, 2026)

Proclamation Issued

Dissent: None

Mayor Supple read a proclamation officially recognizing January 26-30 as Winter Salt Week, presenting it to Deputy Public Works Director Chris Link.

Richfield Foundation Presentation of Grants (Regular Meeting - Jan 27, 2026)

Presentation Received

Dissent: None

Lindsay Crye, Chair of the Richfield Foundation, presented grants on behalf of the organization. She highlighted the Foundation's nearly 40-year history of supporting local nonprofits and neighborhood projects, with a mission to connect resources to community efforts and a vision of a vibrant, connected Richfield. The presentation included the announcement of 2025 grant recipients.

Consent Calendar Items (Regular Meeting - Jan 27, 2026)

5-0 Approved

Dissent: None

Moved by Council Member Hayford Oleary [Approx. 08:00] · Seconded by Council Member Burk [Approx. 08:00]

City Manager Rodriguez presented three items for the consent calendar: approval of disbursements/claims totaling $2,790,170.34; the second reading of Ordinance No. 2026-01 rezoning parcels for the Minnesota Independence College & Community (MICC) with related resolutions; and the second reading of Ordinance No. 2026-02 establishing a Human Resources Department and Director position, with a related resolution. These items were approved collectively.

Adoption of an emergency ordinance limiting the use of city-owned property for civil immigration enforcement staging purposes (Regular Meeting - Jan 27, 2026)

5-0 Approved

Dissent: None

Moved by Council Member Coleman-Woods [Approx. 08:10] · Seconded by Council Member Burk [Approx. 08:10]

Council Member Coleman-Woods presented Ordinance No. 2026-03, recommending an emergency ordinance to prohibit the use of city-owned off-street property (like parking lots and vacant lots) for civil immigration enforcement activities, unless legally required or with a judicial warrant. This measure was a direct response to recent federal enforcement activity and aimed to provide clear guidance for staff and residents, taking immediate effect. Staff clarified the ordinance does not apply to on-street parking or public areas inside city buildings.

Resolution Ratifying Participation in Municipal Prosecutors’ Amicus Curiae Brief (Regular Meeting - Jan 27, 2026)

5-0 Approved

Dissent: None

Moved by Mayor Supple [Approx. 08:15] · Seconded by Council Member Hayford Oleary [Approx. 08:15]

Mayor Supple read Resolution 12407, which formally ratifies the city's participation in a municipal prosecutors' amicus curiae brief. City Manager Rodriguez acknowledged the prompt consideration required due to recent intercity meetings and expressed gratitude for the Council's quick decision.

City Council's approval of the Mayor's appointment of a Housing and Redevelopment Authority Commissioner (Regular Meeting - Jan 27, 2026)

5-0 Approved

Dissent: None

Moved by Council Member Hayford Oleary [Approx. 08:20] · Seconded by Council Member Coleman-Woods [Approx. 08:20]

Council Member Hayford Oleary presented the staff report recommending Brett Stursa as a Housing and Redevelopment Authority (HRA) commissioner for a five-year term starting March 1, 2026. The appointment followed an application and interview process conducted by HRA/EDA members. Mayor Supple clarified that HRA and Economic Development Authority (EDA) members are the same, so this appointment also applies to the EDA. The Council also thanked Erin Vrieze Daniels for her prior service.

City Manager’s Report (Regular Meeting - Jan 27, 2026)

Report Received; Council Discussion ensued, directing staff to research further options for housing stability.

Dissent: None

City Manager Rodriguez provided a comprehensive update on responses to public concerns from recent open forums, particularly regarding federal immigration enforcement. Key actions included issuing Council statements, allocating $50,000 for emergency rental assistance, and adopting the emergency ordinance limiting city property use by ICE. Ongoing efforts include 'know your rights' information, monitoring ICE vehicle traffic stops, filing an amicus curiae brief, and exploring options for extending eviction notice requirements (as a city-level moratorium was deemed legally unfeasible). She also reported on Flock camera system security (no federal data sharing, 30-day retention), increased police patrols near schools, and school programming adjustments due to ICE activity. Council and staff discussed potential local ordinances for tenant protections, including an affirmative defense for income loss due to ICE involvement.

Council Discussion (Regular Meeting - Jan 27, 2026)

Discussion Only; No formal action taken.

Dissent: None

Council members used this time for general acknowledgments and updates. Council Member Burk praised community solidarity during challenging times, echoed by Council Member Hayford Oleary who also encouraged caucus participation. Council Member Coleman-Woods celebrated the Richfield High School basketball teams' success. Mayor Supple updated on coordination among West Metro mayors, city managers, and police chiefs to strengthen regional advocacy and engage with state and federal processes, noting that collective action increases impact. No liaison reports were presented.

Consider a resolution authorizing the Mayor and City Manager to finalize and execute Hennepin County Cooperative Agreement No. PW 22-19-25 for the 2026-27 Nicollet Avenue Reconstruction Project (Consent Calendar - Feb 10, 2026 Agenda Item)

Pending (Scheduled for Feb 10, 2026 Consent Calendar)

Dissent: None foreseen from report

This item proposes approval of a cooperative agreement with Hennepin County for the extensive reconstruction of Nicollet Avenue (CSAH 52). The project, scheduled for 2026-27, will update aging infrastructure from 77th Street to 66th Street, including roadway, utilities, ADA features, and active transportation elements. Richfield's estimated cost share is approximately $7.99 million of the total $23.8 million project. The plan aligns with city master plans for bicycle, pedestrian, and active transportation, aiming to enhance safety for all users. The City is actively seeking state bond funds to alleviate financial burden, with the agreement stipulating how these funds would be allocated if awarded. The resolution is crucial for the County to proceed with bidding.

The study identified 24 light-duty vehicles as strong options for conversion to battery electric vehicles: estimating approximately $140,000 in savings and significant greenhouse gas reductions.

Sustainability Coordinator Lindholm [Approx. 06:05]
Review and discuss the Fleet Electrification Analysis conducted by the fleet electrification consultant Sawatch Labs (Work Session - Jan 27, 2026)

emphasized a phased approach beginning with infrastructure installation before EV fleet vehicle acquisition.

Deputy Public Works Director Link [Approx. 06:10]
Review and discuss the Fleet Electrification Analysis conducted by the fleet electrification consultant Sawatch Labs (Work Session - Jan 27, 2026)

emphasized the need to conduct a separate study of police vehicles and to complete a detailed financial analysis before committing to a transition to electric vehicles.

Council [Approx. 06:28]
Review and discuss the Fleet Electrification Analysis conducted by the fleet electrification consultant Sawatch Labs (Work Session - Jan 27, 2026)

expressed concern that some immigrant residents have recently limited their public presence due to fear related to immigration enforcement and noted community efforts to support affected neighbors, concluding with pride in the community’s collective response.

Betsy Stark, Richfield resident [Approx. 07:50]
Open Forum (Regular Meeting - Jan 27, 2026)

Ms. Tackes summarized public comments from the January 13 meeting regarding concerns about increased Department of Homeland Security (DHS) and Immigration and Customs Enforcement (ICE) activity in the city. Ms. Tackes noted all comments expressing opposition to the current enforcement presence and requests for city action related to law enforcement practices, data-sharing technology, and housing stability.

Alicia Tackes, Richfield resident [Approx. 08:00]
Open Forum (Regular Meeting - Jan 27, 2026)

Ms. Cleland requested information on the economic impact of ICE activity on the city and asked the Council to clarify what authority and measures the city can use to prevent federal agencies from staging on city property, emphasizing the need to protect families, businesses, and community safety.

Nicole Cleland, Richfield resident [Approx. 08:15]
Open Forum (Regular Meeting - Jan 27, 2026)

Mr. Fulton expressed support for city actions that could limit ICE access to public spaces and for the removal of surveillance technologies such as Flock and opined on law enforcement limitations with federal agencies.

Michael Fulton, Richfield resident [Approx. 08:25]
Open Forum (Regular Meeting - Jan 27, 2026)

The measure responds to recent federal enforcement activity in Richfield, aims to address public safety and access concerns, and provides clear guidance for staff and residents. The ordinance does not limit federal enforcement or lawful judicial actions and would take effect immediately.

Council Member Coleman-Woods [Approx. 08:05]
Adoption of an emergency ordinance limiting the use of city-owned property for civil immigration enforcement staging purposes (Regular Meeting - Jan 27, 2026)

reviewed and clarified the ordinance applies only to city-owned off-street properties, such as parking lots, and cannot restrict access to on-street parking or public areas inside city buildings.

Staff [Approx. 08:08]
Adoption of an emergency ordinance limiting the use of city-owned property for civil immigration enforcement staging purposes (Regular Meeting - Jan 27, 2026)

added that recent intercity meetings provided an opportunity that required quick vetting for the Council meeting and expressed gratitude for the Council’s prompt consideration and decision.

City Manager Rodriguez [Approx. 08:15]
Resolution Ratifying Participation in Municipal Prosecutors’ Amicus Curiae Brief (Regular Meeting - Jan 27, 2026)

clarified that, according to the Economic Development Authority (EDA) bylaws, EDA members are the same members as Housing and Redevelopment Authority (HRA) members. Therefore, the appointment of the HRA commissioner also applies to the EDA, but the official appointment is made through the HRA.

Mayor Supple [Approx. 08:20]
City Council's approval of the Mayor's appointment of a Housing and Redevelopment Authority Commissioner (Regular Meeting - Jan 27, 2026)

Key actions completed included: Posting summaries of Council statements condemning ICE actions, both on the Richfield Recap and social media, with Mayor Supple issuing a separate statement over the weekend.

City Manager Rodriguez [Approx. 08:25]
City Manager’s Report (Regular Meeting - Jan 27, 2026)

Legal review found an eviction moratorium is not permitted; the city is examining options to extend eviction notice requirements.

City Manager Rodriguez [Approx. 08:30]
City Manager’s Report (Regular Meeting - Jan 27, 2026)

Flock camera systems were reviewed and confirmed secure, with no federal data sharing, license plate data retained for 30 days (compared to the 60-day industry standard), and no Condor video-enabled cameras in use.

City Manager Rodriguez [Approx. 08:35]
City Manager’s Report (Regular Meeting - Jan 27, 2026)

expressed appreciation for community members who are supporting one another during a time of crisis, noting strong local solidarity and willingness to help neighbors and others in need.

Council Member Burk [Approx. 08:38]
Council Discussion (Regular Meeting - Jan 27, 2026)

Mayor Supple noted that collective action among multiple cities increases impact, and that work is ongoing to formalize governance and communication, with a more formal announcement anticipated soon.

Mayor Supple [Approx. 08:40]
Council Discussion (Regular Meeting - Jan 27, 2026)

The City Council adopted a resolution supporting the project layout at the October 8, 2024 City Council meeting.

Report Prepared By Matt Hardegger, Transportation Engineer [Feb 10, 2026]
Consider a resolution authorizing the Mayor and City Manager to finalize and execute Hennepin County Cooperative Agreement No. PW 22-19-25 for the 2026-27 Nicollet Avenue Reconstruction Project (Consent Calendar - Feb 10, 2026 Agenda Item)

The project will create a safer, more comfortable corridor for all users of Nicollet Avenue, whether they are walking, biking, rolling, driving a personal vehicle, or taking public transit. The proposed design emphasizes the safety of the roadway's most vulnerable users to reduce or eliminate vehicle crashes with pedestrians and bicyclists, and reduce the severity of vehicle crashes on the road.

Report Prepared By Matt Hardegger, Transportation Engineer [Feb 10, 2026]
Consider a resolution authorizing the Mayor and City Manager to finalize and execute Hennepin County Cooperative Agreement No. PW 22-19-25 for the 2026-27 Nicollet Avenue Reconstruction Project (Consent Calendar - Feb 10, 2026 Agenda Item)

State funding could significantly reduce the financial impact on the debt levy and utility funds. Language has been included in the agreement to dictate the dispersal of any awarded bond funds.

Report Prepared By Matt Hardegger, Transportation Engineer [Feb 10, 2026]
Consider a resolution authorizing the Mayor and City Manager to finalize and execute Hennepin County Cooperative Agreement No. PW 22-19-25 for the 2026-27 Nicollet Avenue Reconstruction Project (Consent Calendar - Feb 10, 2026 Agenda Item)
Source document

## Richfield City Council Agenda

February 10, 2026 -- 7:00 PM

## Richfield Municipal Center

## Council Chambers

## 6700 Portland Avenue South

1. Call to Order

2. Pledge of Allegiance

3. Approval of the Agenda

4. Approval of Minutes

a. Meeting Minutes from (1) City Council Work Session from January 27, 2026, and (2)

Regular City Council Meeting from January 27, 2026.

## 5. Open Forum

Participants can share their comments in person, by voicemail, or email, and may also request to

participate virtually. For more information on submitting comments, refer to the Council Agenda and

Minutes page on richfieldmn.gov/citycouncil

6. Proclamations and Presentations

## 7. Consent Calendar

Consent Calendar contains several separate items, which are acted upon by the City Council in one

motion. Once the Consent Calendar has been approved, the individual items and recommended

actions have also been approved. No further Council action on these items is necessary. However,

any Council Member may request that an item be removed from the Consent Calendar and placed

on the regular agenda for Council discussion and action. All items listed on the Consent Calendar

are recommended for approval.

## a. Approve Disbursements/Claims

b. Consider a resolution authorizing the Mayor and City Manager to finalize and execute

Hennepin County Cooperative Agreement No. PW 22-19-25 for the 2026-27 Nicollet

Avenue Reconstruction Project.

c. Consider the approval of a resolution authorizing the lawful gambling premises permit

by Richfield Lions Club, to conduct lawful gambling at Sandy's Tavern, 6612 Penn

Avenue South.

## 8. Consideration of Items, if Any Removed From Consent Calendar

## 9. Public Hearings

## 10. Proposed Ordinances

11. Resolutions

## 12. Other Business

## 13. City Manager’s Report

## 14. Council Discussion

a. Hats off to Hometown Hits

## b. Council Liaison Reports

15. Adjournment

Auxiliary aids for individuals with disabilities are available upon request. Requests must be made at least 96 hours in advance to the

City Clerk at 612-861-9739.

Includes Materials - Materials relating to these agenda items can be found in the Council Chambers Agenda Packet book located by

the entrance. The complete Council Agenda Packet is available electronically on the City of Richfield website.

Page 1 of 76

## CITY COUNCIL MEETING MINUTES

## Richfield, Minnesota

City Council Work Session

January 27, 2026

ITEM #1

CALL TO ORDER

Mayor Supple called the work session to order at 6:00 p.m. in the Bartholomew Room.

Council Present:

Remote Access:

Mary Supple, Mayor; Walter Burk, Sean Hayford Oleary, Rori A. Coleman-

Woods.

Council Member Christensen participated remotely via interactive technology

for an excused medical reason.

Staff Present:

Guests:

## Katie Rodriguez, City Manager; Chris Link, Deputy Public Works Director;

## Karl Huemiller, Recreation Director; Andrew Spear, IT Manager; Rachel

Lindholm, Sustainability Coordinator; and Michelle Friedrich, City Clerk.

None.

## ITEM #2

ITEM DISCUSSION

a. Review and discuss the Fleet Electrification Analysis conducted by the fleet electrification

## consultant Sawatch Labs

Sustainability Coordinator Lindholm presented the results of the recent fleet analysis study, the

purpose of the analysis study, and the findings of the study related to guidance of future EV fleet

purchases, budget, and sustainability decisions. The study, conducted by Sewatch Labs from

October 2024 through January 2025, evaluated 68 of the City’s 254 vehicles, and focused on light-

duty vehicles where viable electric options currently exist. Sustainability Coordinator Lindholm noted

that based on total cost of ownership, vehicle use patterns, and charging feasibility, the study

identified 24 light-duty vehicles as strong options for conversion to battery electric vehicles:

estimating approximately $140,000 in savings and significant greenhouse gas reductions.

Sustainability Coordinator Lindholm reviewed the charging infrastructure needs identified in the

study, and the study recommendation indicating Level 2 chargers at facilities such as Public Works

and City Hall. Deputy Public Works Director Link emphasized a phased approach beginning with

infrastructure installation before EV fleet vehicle acquisition.

Council and staff discussed budget impacts, leasing versus purchasing, the current practice of

cascading police vehicles to other departments, and the importance of rightsizing both vehicle type

and fleet size.

Page 2 of 76

City Council Work Session Minutes -2- January 13, 2026

Mayor Supple adjourned the work session at 6:26 p.m.

Council and staff requested additional work session discussion.

Mayor Supple reconvened the work session at 6:27 p.m.

Deputy Public Works Director Link asked for Council feedback on EV fleet vehicles. Council

discussed next steps following the fleet analysis and emphasized the need to conduct a separate

study of police vehicles and to complete a detailed financial analysis before committing to a

transition to electric vehicles. Council expressed general support for exploring EV fleet vehicles and

discussed leasing versus purchasing. Council highlighted the importance of understanding long-

term costs, maintenance implications, and budget impacts through a clear side-by-side financial

comparison before moving forward. Council indicated interest in pursuing the EV fleet vehicle

concept cautiously and methodically, with financial analysis as the first priority related to city budget

constraints.

## ITEM #3

ADJOURNMENT

Mayor Supple adjourned the work session at 6:30 p.m.

Date Approved: February 10, 2026

## Mary B. Supple

## Mayor

Michelle Friedrich Katie Rodriguez

## City Clerk City Manager

Page 3 of 76

ITEM #1

CALL TO ORDER

The meeting was called to order by Mayor Supple at 7:00 p.m. on January 27, 2026, in the Council

Chambers.

Council Present:

## Remote Access:

Mary Supple, Mayor; Walter Burk, Sean Hayford Oleary, Rori A.

## Coleman-Woods

Council Member Christensen participated remotely via

interactive technology for an excused medical reason.

Staff Present:

## Guests:

## Katie Rodriguez, City Manager; Jay Henthorne, Director of

## Public Safety; Joe Griffin, Deputy Director of Public Safety;

## Andrew Spear, IT Manager; Siobhan Tolar, Associate sitting in

## for Mary Tietjen, City Attorney; and Michelle Friedrich, City

Clerk.

None

ITEM #2

PLEDGE OF ALLEGIANCE

Mayor Supple led the Pledge of Allegiance. Mayor Supple noted there were many community

members wishing to participate in Open Forum and reviewed acceptable meeting etiquette and

requested that the audience listen respectfully, to not disrupt the speaker by clapping, cheering, or

booing. Mayor Supple noted follow-up information from the last Council meeting in the City

Manager’s report and invited residents to join the remainder of the meeting.

Mayor Supple asked for a moment of silence for Andrew Pretti.

ITEM #3

APPROVAL OF AGENDA

MOTION: made by Council Member Hayford Oleary, seconded by Council Member Burk to add

agenda item 11a, Resolution Ratifying Participation in Municipal Prosecutors’ Amicus Curiae Brief,

and approve the agenda as amended.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

## CITY COUNCIL MEETING MINUTES

## Richfield, Minnesota

Council Regular Meeting

January 27, 2026

Page 4 of 76

City Council Meeting Minutes -2- January 27, 2026

Motion carried: 5-0

ITEM #4

APPROVAL OF MINUTES

MOTION: made by Council Member Coleman-Woods, seconded by Council Member Hayford

Oleary to approve the minutes of the (1) City Council Work Session from January 13, 2026, and (2)

City Council Regular Meeting from January 13, 2026, and (3) Council Special Meeting from

January 15, 2026.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

ITEM #5

OPEN FORUM

Mayor Supple noted the number of individuals wishing to speak during Open Forum and extending

the Open Forum period from 30 minutes to 50 minutes. Staff noted an ADA accommodation

request for a time limit extension. Mayor Supple noted the request was included within the

extended period to 50 minutes and reviewed the three-minute time limit for public comments and

explained the use of time warning cards to alert the speaker when their time is almost expired.

Attendees were reminded to listen respectfully to all speakers. Instructions were given for speakers

to state their name and city of residence before speaking.

MOTION: made by Council Member Coleman-Woods, seconded by Council Member Burk to

extend the Open Forum period from 30 minutes to 50 minutes, extending the Open Forum period

until 8:47 p.m.; and extending the three-minute time limit to a four-minute time limit for an ADA

accommodation request.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

Seventeen residents addressed the Council during the Open Forum opportunity.

Besty Stark, Richfield resident, reflected on changes in the community over time, and identifies

increased diversity as a positive development. Ms. Stark described immigrant families as

contributing positively to neighborhood life and shared a personal example of neighborly assistance

during a winter snowstorm. Ms. Stark expressed concern that some immigrant residents have

recently limited their public presence due to fear related to immigration enforcement and noted

community efforts to support affected neighbors, concluding with pride in the community’s

collective response.

Debbie Nordmarken, Richfield resident, raised concerns about a criminal case involving the

removal of a 14-year-old student from a classroom by a non-teacher, noting limited public

information and a lack of detailed communication from school district leadership. Ms. Nordmarken

referenced recent court proceedings in which the defendant waived a jury trial and received a

sentence that did not include jail time or sex-offender registration and expressed concern about the

judicial decision and its implications. Ms. Nordmarken questioned school and judicial accountability,

requested greater transparency, and urged the city to voice concerns to both the school board and

the judicial system regarding student safety and sentencing outcomes.

Page 5 of 76

City Council Meeting Minutes -3- January 27, 2026

Alicia Tackes, Richfield resident, submitted documents electronically to the council prior to the

meeting. Council received the documents electronically immediately prior to the start of the

meeting. Ms. Tackes summarized public comments from the January 13 meeting regarding

concerns about increased Department of Homeland Security (DHS) and Immigration and Customs

Enforcement (ICE) activity in the city. Ms. Tackes noted all comments expressing opposition to the

current enforcement presence and requests for city action related to law enforcement practices,

data-sharing technology, and housing stability. Ms. Tackes submitted document(s) including

comment feedback, relevant city code references, and actions taken by neighboring cities. Ms.

Tackes thanked Council for their consideration of the materials submitted.

Coral Thacker, Richfield resident, referenced a poem, and expressed the need for hope, civic

action, and change in response to current political, social, and environmental challenges. Ms.

Thacker emphasized human equality, concerns about authoritarianism and profit-driven systems,

and encouraged consideration of alternative governance ideas and referenced democratic

socialism, and society that is humanitarian, and closer to democracy to promote equity and long-

term sustainability. Ms. Thacker opined on countries that practice democratic socialism

successfully.

Ashley Daniels, Richfield resident, thanked the council for recent funding allocated to VEAP for rent

assistance and expressed concern about broader state and federal actions affecting housing

security and immigration enforcement. Ms. Davis urged the Council to support a resolution calling

for a statewide eviction moratorium, emergency measures to prevent mass displacement, and

prioritization of community well-being, and asked the council to consider how it can use its authority

to respond to current conditions and support residents during this period.

Birgit Johnson, Richfield resident, emphasized the importance of civic participation, including

staying informed, voting, and speaking out when concerns arise, even when doing so feels

uncomfortable. Ms. Johnson highlighted the role of public engagement in holding those in power

accountable and protecting community safety. Ms. Johnson expressed concern about national

political trends she characterized as authoritarian and warned that such developments could have

long-term consequences beyond the local level. Ms. Johnson encouraged individuals to question

authority, speak openly about perceived injustices, and remain engaged rather than disengaging

for convenience.

Travis Mord, Richfield resident, addressed concerns regarding federal ICE activity and its effects

on children in the community. Mr. Moore noted that children directly impacted by these events may

experience lasting stress and trauma, which can affect development and resilience. Mr. Moore

expressed appreciation for recent reductions in ICE presence in Minnesota and encouraged the

Council to take active steps to support children’s sense of safety and trust. Mr. Moore suggested

creating community spaces, partnerships with local providers, family forums, and ongoing events to

help children and families recover, and offered to assist in these efforts.

Brianna Darling, Richfield resident, shared personal reflections on living in Richfield, appreciation

for Richfield’s community, expressed concern about ICE activity and its impact on families, and

highlighted the contributions of the city’s immigrant community, urging the Council to continue

supporting and protecting residents.

Nicole Cleland, Richfield resident, whose family has deep roots in the community, shared concerns

about ICE and Border Patrol activity in local parks and residential areas, describing personal

experiences as a legal observer and the broader impact on residents and businesses. Ms. Cleland

highlighted the community’s efforts to support one another and expressed appreciation for the

Council’s leadership. Ms. Cleland requested information on the economic impact of ICE activity on

the city and asked the Council to clarify what authority and measures the city can use to prevent

Page 6 of 76

City Council Meeting Minutes -4- January 27, 2026

federal agencies from staging on city property, emphasizing the need to protect families,

businesses, and community safety.

Patrick Jones, Richfield resident, expressed support for the city’s collaboration with other

municipalities to address issues such as preventing federal staging in public parks. Mr. Jones

noted the importance of documenting impacts, including economic effects and lost school days, to

help ensure these events are remembered and lessons are learned. Mr. Jones also referenced the

January 23 statewide general strike and suggested that the city consider closure or participation in

future similar events.

Geoff R, Richfield resident, acknowledged recent city efforts, including funding for eviction

assistance through VEAP, but expressed concern that federal activity continues to impact

neighborhoods. Geoff R opined on local law enforcement’s response to reckless driving and federal

enforcement presence and questioned the current police funding. Geoff R suggested reallocating

resources to support community needs, including housing and basic services, to improve safety

and well-being in the city.

Michael Fulton, Richfield resident, spoke in support of continued community engagement on

current issues. Mr. Fulton expressed support for city actions that could limit ICE access to public

spaces and for the removal of surveillance technologies such as Flock and opined on law

enforcement limitations with federal agencies. Mr. Fulton also voiced support for ongoing advocacy

for a statewide eviction moratorium and thanked the Council for its responsiveness to public

comments and for the recent funding for VEAP.

Landon McKay, Richfield resident, spoke in support of the city’s efforts to limit cooperation with

ICE, including reconsidering the use of Flock cameras in the community. Mr. McKay commended

Council for taking actionable steps within their authority and expressed support for continued

advocacy and advocating for a statewide eviction moratorium by the governor. Mr. McKay

highlighted ongoing community efforts to provide food and rent assistance and noted that local

resources are limited, and additional support is needed to prevent evictions and protect residents.

Ben Brown, Richfield resident, shared concerns about ICE presence near local schools and

daycare centers, citing a recent incident in a school pickup line. Mr. Brown emphasized the need

for measures to keep ICE agents away from school areas and suggested that increased police

presence could help. Mr. Brown also commented on broader concerns about authoritarian

practices and the protection of certain groups under the law, urging action to ensure community

safety around educational facilities.

Alicia Waters, Richfield resident, noted support of city’s engagement with neighboring cities

regarding federal agency presence and asking for information to be shared with residents about

those efforts. Ms. Waters raised concerns about fear of ICE activity, including door-knocking and

how dispatch and police respond to related calls. Ms. Waters encouraged long-term support for

vulnerable community members, reiterated that challenges remain, and noted the upcoming

caucuses as an opportunity for civic participation.

John Grabow, Richfield resident, described a specific case involving an immigrant community

member who was reportedly issued a notice to appear for an ICE meeting and subsequently

transported out of state, noting that a court order indicated the individual should not have been

moved. Mr. Grabow explained the person was later returned to Minnesota and remains in custody.

Mr. Grabow shared this account to illustrate that not all immigration enforcement actions occur in

public and to highlight ongoing community concern about federal enforcement activities affecting

residents.

Page 7 of 76

City Council Meeting Minutes -5- January 27, 2026

Teresa Guthrie, Richfield resident, shared a personal account of encountering federal immigration

agents near their home and described feeling frightened when the agents photographed them on

private property. They expressed concern about the impact of ICE activities on the community,

including the use of public funds and police resources to support federal enforcement. The resident

suggested reallocating those resources to support local community programs and assist affected

residents. They emphasized the need for accountability for federal agents and expressed gratitude

for the efforts of community members working to help and protect one another.

Mayor Supple thanked residents for participating in the Open Forum public comment opportunity.

ITEM #6

PROCLAMATIONS AND PRESENTATIONS

a. Proclamation recognizing January 26–30 as Winter Salt Week 2026.

Mayor Supple read the proclamation recognizing January 26-30 as Winter Salt Week and presented

the proclamation to Deputy Public Works Director Chris Link.

b. Richfield Foundation Presentation of Grants.

Lindsay Crye, Chair of the Richfield Foundation, presented the grants on behalf of the volunteer-led

nonprofit and its board of trustees. Chair Crye highlighted the Foundation’s nearly 40-year history

of supporting local nonprofits and neighborhood projects, with a mission to connect resources to

community efforts and a vision of a vibrant, connected Richfield. Chair Crye noted the Foundation’s

programs and announced the 2025 grant recipients.

ITEM #7

CONSENT CALENDAR

City Manager Rodriguez presented the consent calendar.

a. Approve Disbursements/Claims

## U.S. BANK 1-16-2026

A/P Checks/ETF’s: (1/3/2026 thru 1/16/2026) $1,637,722.23

Payroll (1/16/2026) $1,152,448.11

## TOTAL $2,790,170.34

b. Second reading of an ordinance rezoning four parcels at approximately 76th Street and

Morgan Avenue from R to MR-2 to facilitate construction of a new learning center for

Minnesota Independence College & Community and related conditional use permit,

variances, plat, and summary resolution.

## ORDINANCE NO. 2026-01

## AN ORDINANCE RELATING TO ZONING; AMENDING APPENDIX I OF THE

RICHFIELD CITY CODE BY REZONING 2000, 2006 & 2018 - 76th STREET WEST AND

## 7532 MORGAN AVENUE SOUTH FROM LOW DENSITY RESIDENTIAL (R) TO

## MULTIFAMILY RESIDENTIAL (MR-2)

Page 8 of 76

City Council Meeting Minutes -6- January 27, 2026

## RESOLUTION NO. 12403

## APPROVING SUMMARY PUBLICATION OF ORDINANCE 2026-01

## RESOLUTION NO. 12405

## APPROVING A CONDITIONAL USE PERMIT AND VARIANCES FOR MINNESOTA

INDEPENDENCE COLLEGE AND COMMUNITY AT 2000, 2006, 2018 - 76th STREET

## WEST AND 7532 MORGAN AVENUE SOUTH

## RESOLUTION NO. 12406

## APPROVING A PRELIMINARY PLAT FOR MICC BULLDOG

c. Consider approval of the second reading and summary publication of an ordinance

amending Section 300 and 310 of the Code of Ordinances to establish a Human

Resources Department and create the position of Human Resources Director.

## ORDINANCE NO. 2026-02

## AN ORDINANCE AMENDING SECTION 300 AND SECTION 310

## OF THE CODE OF ORDINANCES RELATING TO THE CREATION OF

## THE HUMAN RESOURCES DEPARTMENT AND HUMAN RESOURCES DIRECTOR

## POSITION WITHIN THE CITY ORGANIZATION

## RESOLUTION NO. 10404

## APPROVING SUMMARY PUBLICATION OF ORDINANCE 2026-02

MOTION: made by Council Member Hayford Oleary, seconded by Council Member Burk to

approve the consent calendar items 7a-c.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

ITEM #8

## CONSIDERATION OF ITEMS, IF ANY, REMOVED FROM CONSENT

## CALENDAR

None.

ITEM #9

PUBLIC HEARINGS

None.

ITEM #10

PROPOSED ORDINANCES

a. Adoption of an emergency ordinance limiting the use of city-owned property for civil

immigration enforcement staging purposes.

Council Member Coleman-Woods presented the staff report recommending an emergency

ordinance prohibiting the use of city-owned property for civil immigration enforcement activities,

except as required by law or judicial warrant. The measure responds to recent federal enforcement

activity in Richfield, aims to address public safety and access concerns, and provides clear

Page 9 of 76

City Council Meeting Minutes -7- January 27, 2026

guidance for staff and residents. The ordinance does not limit federal enforcement or lawful judicial

actions and would take effect immediately.

## ORDINANCE NO. 2026-03

## ADOPTION OF AN EMERGENCY ORDINANCE LIMITING THE USE OF CITY-OWNED

## PROPERTY FOR CIVIL IMMIGRATION ENFORCEMENT STAGING PURPOSES

Council and staff reviewed and clarified the ordinance applies only to city-owned off-street

properties, such as parking lots, and cannot restrict access to on-street parking or public areas

inside city buildings. Staff further added private city-controlled spaces can be marked to indicate

restrictions, but public lobbies and similar areas remain accessible.

MOTION: made by Council Member Coleman-Woods, seconded by Council Member Burk adopt

Emergency Ordinance Limiting the Use of City-Owned Property for Civil Immigration Enforcement

Staging Purposes.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

ITEM #11

RESOLUTIONS

a. ADDED ITEM: Resolution Ratifying Participation in Municipal Prosecutors’ Amicus Curiae

Brief.

Mayor Supple read the full Resolution Ratifying Participation in Municipal Prosecutors’ Amicus

Curiae Brief.

## RESOLUTION 12407

## RATIFYING PARTICIPATION IN MUNICIPAL PROSECUTORS’ AMICUS CURIAE

## BRIEF

City Manager Rodgriguez thanked the Council, city staff, and prosecutors for their support. City

Manager Rodriguez added that recent intercity meetings provided an opportunity that required

quick vetting for the Council meeting and expressed gratitude for the Council’s prompt

consideration and decision.

MOTION: made by Mayor Supple, seconded by Council Member Hayford Oleary to approve a

resolution Ratifying Participation in Municipal Prosecutor’s Amicus Curiae Brief.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

ITEM #12

OTHER BUSINESS

a. Consider City Council's approval of the Mayor's appointment of a Housing and

Redevelopment Authority Commissioner.

Council Member Hayford Oleary presented the staff report considering the appointment of a

## Housing and Redevelopment Authority (HRA) commissioner. Council Member Hayford Oleary

Page 10 of 76

City Council Meeting Minutes -8- January 27, 2026

added the HRA, established by resolution in 2011, consists of two council-appointed members and

three mayor-appointed citizens, who also serve on the Economic Development Authority. Council

Member Hayford Oleary noted applications were accepted from November 15 to December 15,

2025, and five residents were interviewed by three HRA/EDA members on January 20, 2026.

Following the interviews, the members recommended Brett Stursa for the commissioner position.

Mayor Supple clarified that, according to the Economic Development Authority (EDA) bylaws, EDA

members are the same members as Housing and Redevelopment Authority (HRA) members.

Therefore, the appointment of the HRA commissioner also applies to the EDA, but the official

appointment is made through the HRA.

MOTION: made by Council Member Hayford Oleary, seconded by Council Member Coleman-

Woods to approve the appointment of Brett Stursa to the Housing and Redevelopment Authority

commissioner for a 5-year term beginning Marcy 1, 2026, and expiring February 28, 2031.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

Council thanked Chair Erin Vrieze Daniels for her service to the Housing and Redevelopment

Authority for her time on the commission.

ITEM #13

CITY MANAGER’S REPORT

City Manager Rodriguez provided a detailed update on responses to community concerns raised at

recent open forums, emphasizing staff appreciation for resident engagement and acknowledging

the challenges faced by both staff and residents regarding federal immigration enforcement

activities.

Key actions completed included:

• Posting summaries of Council statements condemning ICE actions, both on the Richfield

Recap and social media, with Mayor Supple issuing a separate statement over the weekend.

• Allocating $50,000 in emergency rental assistance funding through VEP to support residents

facing housing instability, with information shared with local landlords and staff monitoring

potential future needs.

• Adoption of an emergency ordinance restricting the use of city-owned property, including

parking lots and vacant lots, for ICE staging or operational activities, with public signage to be

installed by Public Works. Staff clarified the ordinance does not apply to on-street parking or

public areas inside city buildings.

Other initiatives and ongoing work:

• Sharing “know your rights” information and directing residents to ACLU Minnesota and the

Attorney General’s office to report ICE activity, while noting the City cannot maintain its own

database due to privacy and logistical concerns.

• Monitoring traffic stops involving ICE vehicles; officers follow standard protocols, including

issuing warnings, and prioritize 911 calls over traffic enforcement.

• Filing a friend-of-the-court brief in a federal lawsuit regarding ICE activities; options to formally

join the lawsuit are still under review.

• Legal review found an eviction moratorium is not permitted; the city is examining options to

extend eviction notice requirements.

Page 11 of 76

City Council Meeting Minutes -9- January 27, 2026

Regarding public safety and technology:

• Flock camera systems were reviewed and confirmed secure, with no federal data sharing,

license plate data retained for 30 days (compared to the 60-day industry standard), and no

Condor video-enabled cameras in use.

• Police are providing additional patrols at schools during drop-off and pick-up times, while the

community has organized volunteers to observe and support students. Richfield Public

Schools and Partnership Academy have temporarily adjusted programming, including online

learning and suspension of certain field trips. Staff are exploring additional support for daycare

providers through local networks.

City Manager Rodriguez highlighted ongoing collaboration across city departments, community

organizations, and legal counsel to address public safety, housing, and community concerns while

maintaining resident privacy and public trust.

Council and staff discussed potential options for addressing housing instability and evictions,

particularly for residents affected by loss of income related to immigration enforcement. It was

noted that the City’s legislative priorities already include requests for state law changes to extend

the notice period for nonpayment-of-rent evictions from 14 to 30 days and to prohibit discrimination

against tenants who receive Section 8 housing assistance. Council members suggested exploring

adoption of similar tenant protections at the local level, as other cities have done. Additionally, the

possibility of creating a city ordinance establishing an affirmative defense in nonpayment eviction

cases was raised, allowing tenants to assert loss of income due to direct ICE involvement as a

defense in court. Staff were encouraged to research the legal feasibility and implications of these

options for further consideration.

ITEM #14

COUNCIL DISCUSSION

a. Hats off to Hometown Hits.

Council Member Burk expressed appreciation for community members who are supporting one

another during a time of crisis, noting strong local solidarity and willingness to help neighbors and

others in need. Council Member Burk emphasized the importance of community response in

addressing concerns related to federal actions and thanked those engaged in mutual support

efforts.

Council Member Hayford Oleary reiterated Council Member Burk’s comments and encouraged

community participation in the upcoming precinct caucuses.

Council Member Coleman-Woods offered positive community acknowledgment, highlighting the

success of the Richfield High School boys’ and girls’ basketball teams, encouraging residents to

attend games and support local students, and noting the role of sports in bringing the community

together.

Mayor Supple thanked all speakers and community members for their engagement and support

and provided an update on ongoing coordination among West Metro mayors, city managers, and

police chiefs, including representatives from Richfield. Mayor Supple noted the group is

collaborating to align objectives, strengthen regional advocacy, and engage with state and federal

processes, including legislative hearings and meetings associated with the U.S. Conference of

Mayors. Mayor Supple noted that collective action among multiple cities increases impact, and that

work is ongoing to formalize governance and communication, with a more formal announcement

anticipated soon.

Page 12 of 76

City Council Meeting Minutes -10- January 27, 2026

b. Council Liaison Reports; No reports presented.

ITEM #15

ADJOURNMENT

MOTION: made by Council Member Burk, seconded by Council Member Coleman-Woods to

adjourn the meeting at 8:42 p.m.

Voting Aye: Mayor Supple, Council Member Burk, Council Member Hayford Oleary, Council

Member Christensen (remote), and Council Member Coleman-Woods.

Motion carried: 5-0

Date Approved: February 10, 2026

## Mary Supple

## Mayor

## Michelle Friedrich Katie Rodriguez

## City Clerk City Manager

Page 13 of 76

## City Council Meeting 2/10/2026

## Agenda Section: Consent Calendar

Agenda Item: 7.b.

## Report Prepared By:

## Matt Hardegger, Transportation Engineer

## Department Director:

## Kristin Asher, Public Works Director

## Item for Consideration:

Consider a resolution authorizing the Mayor and City Manager to finalize and

execute Hennepin County Cooperative Agreement No. PW 22-19-25 for the 2026-

27 Nicollet Avenue Reconstruction Project.

## EXECUTIVE SUMMARY

Hennepin County has planned a full reconstruction of County State Aid Highway

(CSAH) 52 (Nicollet Avenue) for 2026. Public engagement and outreach began in

August of 2023 and consisted of four phases of engagement following Richfield's Public

Engagement Policy for Public Works projects. The City Council adopted a resolution

supporting the project layout at the October 8, 2024 City Council meeting.

Staff have been collaborating with Hennepin County and their consultants throughout

the final design process to ensure that the final plans are in substantial compliance with

the layout that was approved by the City Council in 2024. Staff have been negotiating

the City's cost contribution, payment schedule, and maintenance responsibilities with

County staff and have agreed upon the terms of this Cooperative Agreement.

## RECOMMENDED ACTION

By Motion: Approve the resolution authorizing the Mayor and City Manager to

## finalize and execute Hennepin County Cooperative Agreement No. PW 22-19-25

for the 2026-27 Nicollet Avenue Reconstruction Project.

## HISTORICAL CONTEXT

## Project Background

Hennepin County has planned a full reconstruction of CSAH 52 (Nicollet Avenue) from

77th Street to CSAH 53 (66th Street) in their Capital Improvement Plan for 2026

construction. The roadway and City-owned utilities have not been fully replaced since

their original construction in the 1960s, when it was constructed as a four-lane roadway.

The road has been milled and overlaid several times, most recently in 2014 when the

road was also re-striped to a three lane configuration. The northbound lane of Nicollet

Avenue was impacted by a gas transmission line project in 2018 and repaved by the

private utility owner. Median refuges were added at 71st, 72nd, and 73rd Streets in

2020.

## Process

## Hennepin County followed Richfield’s Public Engagement Policy to develop the

preliminary design for this project, with open houses in August 2023, October 2023,

Page 14 of 76

February 2024, and July 2024. The layout was recommended for approval by the

Transportation Commission at their September 2024 meeting, and a resolution

supporting the preferred layout concept was adopted by the City Council at the October

8, 2024 regular meeting. Design plans have been provided to City staff for review and

comment at the 30%, 60%, 90%, 95%, and 100% completion points.

## EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS

Strategic Considerations: The proposed re-design of Nicollet Avenue will ensure City

infrastructure supports service needs.

Equity Considerations: The project will create a safer, more comfortable corridor for all

users of Nicollet Avenue, whether they are walking, biking, rolling, driving a personal

vehicle, or taking public transit. The proposed design emphasizes the safety of the

roadway's most vulnerable users to reduce or eliminate vehicle crashes with

pedestrians and bicyclists, and reduce the severity of vehicle crashes on the road.

## POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)

## Bicycle Master Plan (2012)

This project aims to achieve all 3 Key Objectives of the plan:

## • Link Destinations

## • Improve Safety

## • Community Awareness

Nicollet Avenue is identified as a primary bikeway corridor.

## Pedestrian Master Plan (2018)

The proposed design incorporates nearly all of the best practices for pedestrian safety

identified in the 2018 plan.

## Active Transportation Action Plan (2024)

Proposed design achieves goal of "Centering active transportation users in the Nicollet

Avenue redesign, prioritizing people walking, rolling, biking, and using transit, followed

by other vehicles in design decisions."

## CRITICAL TIMING ISSUES

An approved agreement is required for the County to advertise the project for

construction bids. County staff have indicated that they would like to open bids as soon

as feasible.

## FINANCIAL IMPACT

The estimated cost breakdown for the project is included as an attachment and has

been developed per Hennepin County's Cost Participation Policy dated October 20,

2020. Richfield is responsible for approximately $5.08 Million of shared roadway/storm

sewer costs and approximately $2.91 Million of City-owned utility costs. These totals

include a 10% contingency, as well as standard-applied costs for Design Engineering

(roadway and utilities) and Construction Administration (roadway only). The City

anticipates hiring consultant staff to inspect the City utility work during construction.

The City's adopted 2026 Capital Improvement Budget allocates $3.5 Million of general

Page 15 of 76

obligation bonds and $4 Million of utility bonds for this project, and an additional $4

Million of general obligation bonds in the 2027 Capital Improvement Plan. The City will

be responsible for a $2 Million payment as of June 1, 2026, with the remainder of the

project costs due on July 1, 2027. The City intends to sell the bonds in 2027.

The City has continued to request funding for the project in the City's 2026 Legislative

platform via state bond funds. State funding could significantly reduce the financial

impact on the debt levy and utility funds. Language has been included in the agreement

to dictate the dispersal of any awarded bond funds.

## LEGAL CONSIDERATIONS

The City Attorney has reviewed the agreement and will be available for any questions.

## ALTERNATIVE RECOMMENDATION(S)

## None

## ATTACHMENTS

## 1. 2026-02-10 Nicollet Agreement Resolution

## 2. PW 22-19-25 Richfield CSAH 52 V2

3. PW 22-19-25 CSAH 52-Exhibit A

4. PW 22-19-25 CSAH 52-Exhibit B

5. PW 22-19-25 CSAH 52-Exhibit C

6. PW 22-19-25 CSAH 52-Exhibit D

7. PW 22-19-25 CSAH 52-Exhibit E

Page 16 of 76

RESOLUTION NO.

## RESOLUTION AUTHORIZING MAYOR AND CITY MANAGER TO FINALIZE AND

## EXECUTE HENNEPIN COUNTY AGREEMENT NO. PW 22-19-25, FOR CONSTRUCTION

## ON HENNEPIN COUNTY COUNTY STATE AID HIGHWAY 52 (NICOLLET AVENUE) IN

## RICHFIELD.

BE IT RESOLVED, that the City of Richfield enter into Hennepin County Agreement

No. PW 22-19-25 with Hennepin County for the following purposes:

To provide for construction and maintenance of County State Aid Highway (CSAH)

52 in Richfield, the limits of which are defined in said Agreement.

BE IT FURTHER RESOLVED, the Mayor and the City Manager are hereby

authorized to finalize and execute the Agreement, and any amendments to the Agreement.

Adopted by the City Council of the City of Richfield, Minnesota this 10th day of

February, 2026.

## Mary B. Supple, Mayor

## ATTEST:

Michelle Friedrich, City Clerk

Page 17 of 76

## Agreement No. PW 22-19-25

## County Project No. 2120800

## County State Aid Highway 52

## City of Richfield

## County of Hennepin

DOCSOPEN\RC160\4\1060422.v1-11/13/25

## CONSTRUCTION

## COOPERATIVE AGREEMENT

This Agreement is made between the County of Hennepin, a body politic and corporate under the

laws of the State of Minnesota, hereinafter referred to as the “County”, and the City of Richfield,

a Minnesota home-rule charter city, under the laws of the State of Minnesota, hereinafter referred

to as the “City.” The County and the City collectively are referred to as the “Parties.”

Recitals

The following Recitals are incorporated into this Agreement.

1. The County and City desire to improve County State Aid Highway (CSAH) 52 (Nicollet

Avenue) from 66

th

Street (CSAH 53) to 77

th

Street, which improvements include roadway

reconstruction, ADA improvements, off-street bike lanes, roundabouts, street lighting,

Rectangular Rapid Flashing Beacon (RRFB) and Accessible Pedestrian Signals (APS)

installation, water main replacement, and other associated construction, as shown in County

Project (CP) 2120800, which shall hereinafter be referred to as the “Road Project” and as

further illustrated in the attached Project Plan Title Sheet marked Exhibit B.

2. The Project includes tree planting in the boulevard areas (“Boulevard Trees”) and tree

plantings and perennial vegetation in the median areas (“Median Landscaping”) within existing

County owned right of way along the Project corridor, as further illustrated in the attached

Exhibit E (Landscaping Project), and which shall collectively be referred to as the

“Landscaping Project”. The County will use its own forces to furnish and install the Boulevard

Trees, and the City will be responsible to furnish and install the Median Landscaping.

3. The Parties have agreed to enter into this Agreement to memorialize the partnership and to

outline each party’s ownership and financial responsibilities, maintenance responsibilities, and

associated costs for the Road Project and Landscaping Project, and which shall hereinafter be

referred to as the “Project”.

4. The County shall be the lead agency in Project designs, engineering, and construction

administration, and be responsible for acquiring all necessary right of way and/or other

governmental agencies-required permits needed for the Project.

5. The City has indicated its willingness to perform inspection and testing for the water main and

Page 18 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52; C.P. 212800

sanitary sewer work included in the Project.

6. The County Engineer has prepared an Engineer’s Estimate of quantities and unit prices for the

above described Project, and a copy of the Engineer’s Estimate and an estimated Division of

Cost Summary, marked Exhibit A, is attached hereto.

7. The Project will be carried out by the Parties under the provisions of Minnesota Statutes,

section 162.17, subdivision 1, and section 471.59.

Agreement

NOW, THEREFORE, the Parties agree as follows:

1. Term of Agreement, Survival of Terms, and Exhibits.

1.1. Effective Date. This Agreement is effective as of the date of the final signature.

1.2. Expiration Date. This Agreement will expire after the date in which all obligations

have been satisfactorily fulfilled.

1.3. Survival of Terms. Provisions that by their nature are intended to survive the term,

cancellation or termination of this Agreement do survive such term, cancellation or

termination. Such provisions include but are not limited to: Maintenance

Responsibilities, Records/Audits, Indemnification, Insurance, Worker Compensation

Claims, Cancellation, Termination, and Minnesota Laws Govern.

1.4. Exhibits. All exhibits are attached and incorporated into this Agreement.

1.4.1 Exhibit A (Division of Cost Summary)

1.4.2 Exhibit B (Project Plan Title Sheet)

1.4.3 Exhibit C (Drainage Ownership and Maintenance Responsibilities)

## 1.4.4 Exhibit D (Traffic Control Procedures for Stormwater Treatment

## Infrastructure Maintenance)

1.4.5 Exhibit E (Landscaping Project)

2. Project Construction.

2.1. Contract Award and Administration. The County or its agents shall prepare the

necessary plans, specifications, and proposal; obtain approval of the plans and

Page 19 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

specifications from the Minnesota Department of Transportation (MnDOT) and the

City; advertise for bids for the work and construction; receive and open bids pursuant

to the advertisement; enter into a contract with the successful bidder at the unit prices

specified in the bid of such bidder; administer the contract; and perform the required

engineering and inspection; all in accordance with the plans and specifications set forth

below.

2.2. Project Plans and Specifications.

2.2.1 Project Design Work. All design work performed by the County and its agents

that is to be incorporated into the bidding documents for the Project shall be

prepared and certified by a Professional Engineer licensed in the State of

Minnesota. All designs which affect County facilities shall conform to MnDOT

Design Standards applicable to County State Aid Highways and to the

requirements of the Americans with Disabilities Act (ADA) standards and be

approved by the County Engineer. The Project plans specify locations for the

Landscaping Project to be performed by others. All designs which affect County

## facilities shall conform to Hennepin County Sustainable Landscape Guidelines,

Hennepin County Streetscape Guidelines, MnDOT Specifications, City

practices, and be approved by the County Engineer.

2.2.2 Project Plan Numbers (S.A.P.#/S.P.#). The plans and specifications are

referenced and identified as S.A.P # 027-652-046 and S.A.P. # 157-020-034 and

shall be approved by MnDOT before Project construction.

2.2.3 Request for Copies of Plans. At the request of the City, the County or its agents

shall furnish the City with any working copies of any plans, designs or reports

at any time during the Project design process.

2.3. Construction Supervision and Inspection. The County or its agents will administer

the construction contract, and perform all necessary engineering, inspection and testing

of all the contract work, except for the following: The City is responsible for the

inspection of its water main and sanitary sewer work included in the Project. This

includes but is not limited to shop drawing reviews, inspection of pit and trench

excavation, proper pipe laying, bedding and backfilling, water main and sanitary sewer

testing and all associated documentation necessary for compliance with the contract

specifications.

All work for the Project shall be completed in compliance with the MnDOT and City

approved plans and specifications. The City Engineer or a designated representative

shall have the right, as the work progresses, to enter upon the job site to make any

inspections deemed necessary and shall cooperate with the County Engineer and staff at

their request to the extent necessary but will have no responsibility for the supervision

of the work, notwithstanding the City’s responsibility for inspection and testing of its

water main and sanitary sewer work included in the Project.

The City’s inspection and testing responsibilities shall not cause unnecessary delays to

the County or its contractors. The City’s inability to satisfactorily perform its

Page 20 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

inspection and testing responsibilities shall be cause for the County to perform this

work and to invoice the City of Construction Engineering Costs associated with he

City’s water main and sanitary sewer work in accordance with the provisions of

Section 3.3.

2.4. Plan Changes and Additional Construction.

2.4.1 Plan Changes. The City agrees that the County may make changes in the plans

or in the character of the contract construction that are reasonably necessary to

cause the construction to be in all things performed and completed in a

satisfactory manner. Notwithstanding the standards/requirements noted above in

Subsection 2.2.1, the County agrees that the City may make changes in the plans

or in the character of the Median Landscaping that are reasonably necessary to

cause the construction to be in all things performed and completed in a

satisfactory manner. It is further agreed by the City that the County may enter

into any change orders or supplemental agreements with the County’s contractor

for the performance of any additional construction or construction occasioned

by any necessary, advantageous or desirable changes in plans, within the original

scope of the Project.

2.4.2 Review Proposed Changes. The Parties shall have the right to review any

proposed changes to the plans and specifications as they relate to cost

participation prior to the work being performed, except in emergencies, and in

those instances where the proposed changes necessitate a re-engineering of the

design and/or specifications, the Party requesting the change shall submit the re-

engineered design and/or specifications to the reviewing Party. The reviewing

Party’s Engineer or designated representative shall respond to the request for

approval to authorize the issuance of any change orders or supplemental

agreements that affect the reviewing Party’s share of the constructions cost

within a reasonable time frame to avoid delays or added costs to the Project. The

reviewing Party’s approval shall not be unreasonably withheld.

2.5. Right of Way/Permit.

2.5.1 Right of Way Acquisition. The County or its agents shall acquire all additional

right of way, permits and/or easements required for the construction of the

Project.

2.5.2 Access Rights and Permits. To the extent permitted by law, the City shall

transfer, convey, permit, or otherwise allow the use of property rights controlled

or maintained by the City, including but not limited to easements or access rights

that may be required by the County for the Project, including future maintenance

of the Project. The Parties understand that any such access rights shall be subject

to the City council approval and will be granted at no cost to the County. Any

and all permits required by the City for the Project shall be granted at no cost or

expense to the County or its contractors. These permits include but are not

limited to the following: obstruction permits, erosion and sediment control

Page 21 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

permits, storm water management permits, after hours work permits, and permits

related to City water and sanitary infrastructure. The City Engineer may waive

the requirement to obtain certain City permits at his/her discretion. The County

agrees that it will provide 7 calendar day notice to the City prior to accessing the

improvements for maintenance on City right of way described in Subsection 8.5.

The County shall also obtain, and comply with, any and all permits and

approvals required from other governmental or regulatory agencies to

accomplish the Project.

2.5.3 Right of Way Cost. The City shall participate in the right of way cost for the

Project as provided herein. The Parties understand and agree that the City’s share

of the Project right of way cost is fifty percent (50%) of the total Project right of

way cost (“City’s Right of Way Cost”).

It is understood by the Parties that there is an existing surface water treatment

best management practice pond located at Augsburg Park, which shall

hereinafter be referred to as “Augsburg Pond.” A portion of Augsburg Pond’s

volume receives and treats surface water runoff from CSAH 52. In recognition

of contributing storm water flow from CSAH 52, the County will reduce the

City’s right of way cost participating share due the County by the City’s

Stormwater Quality Fee by the lump sum amount of $218,000.00. The City’s

Stormwater Quality Fee, consistent with City standards, is calculated as $0.75

for every square foot of impervious surface, totaling 290,546 square feet of

surface water flow from County Highway right of way that is treated by

Augsburg Pond.

As further described in Exhibit A, the City’s Right of Way Cost is currently

estimated to be $632,375.00 which shall be paid to the County as a part of the

City’s total cost participation in the Project.

2.6. Traffic Signal. The Project will revise one (1) traffic signal system on CSAH 52 at the

intersection of 77

th

Street (System ID# 8044500), (the “Signal System”).

2.6.1 Accessible Pedestrian Signal (APS). The Project will require the relocation of

two (2) Accessible Pedestrian Signal (APS) push button stations, as a part of the

Project at the intersection of CSAH 52 and 77

th

## Street. The County will integrate

the components into the existing traffic signal system at the intersection as

described in the construction plans.

2.6.2 Rectangular Rapid Flashing Beacons (RRFB). The County will install nine

(9) RRFBs and associated components at the intersections as described in the

construction plans.

2.6.3 Electrical Power. The City, at no cost to the County, shall: (1) install, cause the

installation of, or perpetuate the existence of an adequate three wire, 120/240

volt, single phase, alternating current electrical power connection to the

permanent traffic control signal systems and integral streetlights included in the

Project; and (2) shall provide the electrical power for the operation of all

Page 22 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

permanent and temporary traffic control signal systems and integral traffic signal

pole mounted luminaires installed as a part of the Project.

2.7. Street Lighting. The County or its contractor will install streetlights per the

construction plans. The City, at no cost to the County, shall provide the electrical energy

for the operation of all the streetlights installed as a part of the Project.

2.8. Asbestos. The Project may include the removal of asbestos containing electrical

conduit. Only firms licensed to conduct asbestos abatement shall be used for the safe

removal of asbestos containing electrical conduit with proper shipping manifest

prepared and submitted to the appropriate agency. The lead agency in the Project

construction shall be responsible for the oversight of the removal of asbestos containing

electrical conduit and compliance with the abovementioned specifications.

2.9. Detours. The Project may require limited detouring of traffic onto the City’s streets.

The Parties agree that there will be no compensation to the City for detours onto its

streets required to construct the Project.

2.10. Boulevard Trees. The Project includes tree planting in the boulevard areas within the

existing County owned right of way along the corridor, as shown in Exhibit E. The

County intends to use its own forces, Hennepin County Foresters, under the supervision

of the County’s certified arborist (“County Forester”), to acquire, plant and maintain the

Boulevard Trees at no cost to the City, as provided herein.

2.10.1 Boulevard Tree Installation. Upon substantial completion of the County’s

Road Project construction work, the County shall furnish and install Boulevard

Trees along the CSAH 52 corridor. The County Forester will coordinate its

planting and maintenance activities with the County’s Road Project construction

contractor and shall obtain the County’s construction project engineer’s approval

before starting any work within the Road Project limits. It is anticipated that the

CSAH 52 corridor between 77th and 70th streets will be ready for planting

activities in spring of the calendar year 2027. It is anticipated that the CSAH 52

corridor between 70th and 66th streets will be ready for planting activities in

spring of the calendar year 2028.

2.10.2 Boulevard Tree Establishment Period. The County shall be responsible for

planting and maintaining the Boulevard Trees at its sole expense along the

corridor in the boulevard areas for the establishment period of two years. The

Establishment Period for Boulevard Trees between 77

th

and 70

th

streets is

estimated to begin in Spring, 2027 and conclude in Spring, 2029, and the

Establishment Period for Boulevard Trees between 70

th

and 66

th

streets is

estimated to begin in Spring, 2028 and conclude in Spring, 2030 (“Establishment

Period”). Prior to the conclusion of the Establishment Period, the City and

County staff shall perform a site walkthrough to review the health and vitality of

the Boulevard Trees, and the County will replace any dead or dying tree at no

cost to the City. After the Establishment Period, the City agrees to accept from

the County ownership and maintenance responsibilities of the Boulevard Trees.

Page 23 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

2.11. Median Landscaping. The Median Landscaping will be administered by the City and

includes the planting of trees, shrubs, perennials and ornamental grasses. The Parties

understand and agree that the City will use its own forces and be responsible to acquire,

plant, and maintain the Median Landscaping as provided herein.

2.11.1 Median Landscaping Installation. Upon substantial completion of the

County’s Road Project construction work and Boulevard Tree work, which is

anticipated to be Summer 2028, the City will furnish and install the Median

Landscaping in median areas along CSAH 52, as provided in Exhibit E. The City

will coordinate its planting and maintenance activities with the County’s Road

Project construction contractor and shall obtain the County’s construction

project engineer’s approval before starting any work within the Road Project

limits.

3. Cost Participation. In addition to the City’s cost participation in right of way for the Project

as stated in Subsection 2.5.3, Median Landscaping, as stated in Subsection 3.4 below, and

Stormwater Quality Fees, as stated in Subsection 3.5 below, the City shall participate in the

Project contract construction costs (“Contract Construction Costs”), associated design

engineering fees (“Design Engineering Costs”), and construction administration fees

(“Construction Engineering Costs”), collectively (“City’s Cost Participation”) as provided

herein.

It is recognized by the Parties that the City is seeking State Bonding Grant funds. It is

understood by the Parties that should State Bonding Grant funds be awarded, those funds will

be allocated in such a manner to reduce the City’s share of Contract Construction Costs for the

Project.

3.1. Contract Construction Costs and Exhibit A Unit Prices. The City’s Cost

Participation shall include the Contract Construction Costs for the Project as set forth in

the estimated Division of Cost Summary shown in Exhibit A. For informational

purposes only, the City’s share in Contract Construction Costs is currently estimated to

be $5,718,783.00. The respective proportionate shares of the pro-rata pay items included

in Exhibit A shall remain unchanged throughout the life of this Agreement. The Parties

each understand and agree that the amount as shown in Exhibit A is an estimate of the

Contract Construction Costs on the Project and the unit prices set forth in the contract

with the successful bidder and the final quantities as measured by the County Engineer's

designated representatives shall govern in computing and apportioning the Parties’ total

final Contract Construction Costs for the Project.

If during the life of this agreement City cost participation for Contract Construction

Costs is projected to exceed 110% as described above, the County Engineer must seek

written approval from the City Engineer before issuing changes to the City’s share of

the construction costs.

Following the contract award, the County shall provide the City a revised Exhibit A

(“Revised Exhibit A”) showing the successful bidder’s unit prices and a Division of

Cost Summary reflecting those prices. The Parties acknowledge that the Revised

Exhibit A will be based on the plans and estimated quantities at the time of bid and

Page 24 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

remains subject to plan changes and additional construction outlined in Section 2.4.

Upon completion of all contract construction and upon computation of the final

amount due to the County’s contractor, the County will prepare a final Exhibit A

(“Final Exhibit A”) and submit a copy to the City. The final quantities as measured by

the County Engineer's designated representatives for contract pay items in which the

City is participating shall be subject to review and approval by the City Engineer.

3.2. Design Engineering. The City’s Cost Participation shall also include reimbursement to

the County for the City’s proportionate share of the Design Engineering Costs for the

Project. The City’s share of the Design Engineering Costs shall be equal to twelve

percent (12%) of the total final amount of the City’s share of the Contract Construction

Costs for the Road Project. For informational purposes only, the City’s share in Design

Engineering Costs is currently estimated to be $686,134.00. The Parties understand and

agree that the City’s proportionate shares of the Design Engineering as listed in Exhibit

A are estimated, and the City’s actual proportionate shares will be computed using the

total final amount of the City’s share of the Contract Construction Costs for the Road

Project.

3.3. Construction Engineering Costs. The City’s Cost Participation shall also include

reimbursement to the County for the City’s proportionate share of Construction

Engineering Costs for the Project. The City’s share of Construction Engineering Costs

shall be equal to ten percent (10%) of the total amount of the City’s share of Contract

Construction Costs for the Road Project. For informational purposes only, the City’s

share in Construction Engineering Costs is currently estimated to be $333,047.00. The

Parties understand and agree that the City’s proportionate shares of the Construction

Engineering Costs as listed in Exhibit A are estimated, and the City’s actual

proportionate shares will be computed using the total final amount of the City’s share

of the Contract Construction Costs for the Road Project.

In recognition of the City’s effort referenced in Subsection 2.3, the City’s Cost

Participation reimbursement to the County for the City’s proportionate share of

Construction Engineering Costs for the Project shall not include reimbursement for

water main or sanitary sewer work.

3.4. Median Landscaping Costs. The County has agreed to participate in the cost of

Median Landscaping. The County’s Cost Participation for the Median Landscaping is

estimated to be $25,445.00, calculated as thirty-three percent (33%) of the total cost of

the Median Landscaping. The City’s estimated cost is $50,890.00, calculated as sixty

seven percent (67%) of the Median Landscaping Project, as shown in Exhibit A. The

County will directly pay the City for the costs rather than applying its share as a credit

against the City’s proportionate share of the Project costs.

4. Payment.

4.1. Amount Due. The City agrees to pay the City’s Cost Participation amount as described

herein.

Page 25 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

4.2. When to Invoice. After an award by the County to the successful bidder on the Project,

the County shall invoice the City according to the following schedule:

June 1, 2026: $2,000,000.00

July 1, 2027: The remainder of the City’s shares for the Project in an amount equal to

ninety five percent (95%) of the City’s Cost Participation

The City’s Cost Participation shall be based on actual contract unit prices applied to the

estimated quantities shown in the plans.

4.3. Pay to the Order of. Payments shall be made to the County, in the name of the

Hennepin County Treasurer, by the City for the full amount due stated on the invoices

within forty-five (45) days of the invoice date.

4.4. Where to Send Payment. The payment should include the date, the name of the

County’s project manager (Mr. Stan Lim, P.E.), project name and county project

number (C.P. 2120800). Payment and supporting documentation should be mailed to

the following address:

## Hennepin County Accounts Receivable

## Mail Code 131

300 South 6th St

## Minneapolis, MN 55487

4.5. Supplemental Agreement or Change Order. In the event the County Engineer or the

County's staff determines the need to amend the construction contract with a

supplemental agreement or change order which results in an increase in the contract

amount for the Project, the City hereby agrees to remit within forty-five (45) days of

notification by the County of the change an amount equal to ninety five percent (95%)

of the estimated City’s shares as documented in the supplemental agreement or change

order.

4.6. Final Amount Due. The remainder of the City’s shares in the engineering and contract

construction costs of the Project, including additional costs resulting from supplemental

agreements and change orders, will be due the County upon acceptance by the County’s

construction engineer of all the construction work performed by the County’s

construction contractor and submittal of the County Engineer's final estimate for the

Project to the City.

4.7. Remaining Balance. Upon final payment to the Project contractor by the County, any

amount remaining as a balance in the deposit account will be returned to the City, within

forty-five (45) days, on a proportionate basis based on the City’s initial deposit amount

and the City’s final proportionate share of the Project costs. Likewise, any amount due

the County from the City upon final payment by the County shall be paid by the City as

its final payment for the construction and engineering costs of the Project within forty-

five (45) days of receipt of an invoice from the County.

5. County Permit Issuance. The County reserves the right not to issue any permits for a period

Page 26 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

of five (5) years after completion of the Project for any service cuts in the roadway surfacing

of the County Highways included in the Project for any installation of underground utilities

which would be considered as new work. Service cuts shall be allowed for the maintenance

and repair of any existing underground utilities.

6. No Parking.

6.1. No Parking and Its Enforcement. As part of the Project, “No-Parking” signs shall be

installed as represented in the plans. In addition to the City’s cost participation as

provided elsewhere in this Agreement, the City, at its expense and according to its

practices, shall provide the enforcement for the prohibition of on-street parking on those

portions of county road constructed under this Project recognizing the concurrent

jurisdiction of the Sheriff of Hennepin County.

6.2. Parking Restriction Modification. No modification of the above parking restrictions

shall be made without first obtaining an approval from the County Highway Engineer

permitting the modification and in accordance with the funding requirements of the

Project. In addition to the City’s cost participation as provided elsewhere in this

Agreement, the City shall, at its own expense, remove and replace city-owned signs that

are within the construction limits of the Project if requested by the County's Project

Engineer.

7. The City’s Maintenance Responsibilities. Upon completion of the Project, the City shall

provide year-round maintenance at its sole cost as outlined below.

7.1. Roadways. Maintenance of all City streets, reconstructed under the Project according

to City practices at no cost to the County. Maintenance includes, but is not limited to

sweeping, debris removal, resurfacing and seal coating, and any other maintenance

activities according to accepted City maintenance practices.

7.2. Traffic Signals, Rectangular Rapid Flashing Beacons (RRFB), and Components.

7.2.1 Electrical Service Costs. The City, at its sole expense, shall provide electrical

energy for the operation of the Signal System and shall maintain fuses and wires

to the load side of the meter socket of the traffic Signal System and integral

streetlights/luminaires.

7.2.2 Traffic Signal System Adjustment. The City shall not revise by addition or

deletion, nor alter or adjust any component, part, sequence, or timing of the

Signal System, however, nothing herein shall prohibit prompt, prudent action by

properly constituted authorities in situations where a part of such Signal System

may be directly involved in an emergency.

7.2.3 Signal Luminaires. The City shall provide all required maintenance for the

lamps on the luminaire extensions above the signals. Maintenance includes but

is not limited to replacing burned out luminaire lamps, replacing fixtures,

replacing other lighting components, and replacing fuse and wire from luminaire

lamp to load side of meter socket of the Signal System.

Page 27 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

7.2.4 Signal Cleaning. The City shall be responsible for general cleaning and graffiti

removal from the Signal System equipment and components.

7.2.5 Rectangular Rapid Flashing Beacons (RRFB). The City shall own and

maintain the RRFBs installed as part of the Project.

7.2.6 Blocking County Roadways. When performing the Signal System

maintenance work under this Agreement, the City may partially block affected

County roadways within its corporate limits if needed. In cases of emergency,

such County roadways may be wholly blocked and the passage of traffic thereon

prevented by the City. At no time, however, shall the City continue to obstruct

the free passage of traffic on the County roadways for a longer period of time

than is reasonably required for making the necessary traffic signal repairs. The

City shall not cause any portions of the County roadways on which traffic control

signals are to be maintained to be closed to traffic for any reason other than those

above without receiving prior written approval from Hennepin County and in no

event for a longer time than shall be necessary. In the event of the total blocking

or closing of any such County roadways, the City shall provide a suitable detour

during such time.

7.2.7 Maintenance Materials and Equipment. When performing the Signal System

maintenance work under this Agreement, the City shall be responsible for proper

signing, marking, barricading and such other warning devices as may be required

to adequately protect the pedestrian and vehicular traffic. All materials used by

the City in the performance of the maintenance work shall conform to the

requirements of the current Edition of the MnDOT "Standard Specifications for

Construction" and all amendments and supplements thereto. All traffic signs,

pavement markings and warning devices shall comply with the current

Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD).

7.3. Street Lighting. The City shall own and maintain the streetlights installed as part of

the Project according to City practices at no cost to the County.

7.4. Sidewalks, Pedestrian Ramps, and Off-street Shared-use Paths/Trails/Bike Lanes.

The City shall own and maintain sidewalks, pedestrian ramps, off-street shared-use

paths/trails/bike lanes constructed as part of the Project according to City practices at

no cost to the County. Maintenance includes but is not limited to repairing faulted or

broken panels or surfaces, vegetation control, and snow and ice removal in accordance

with City standards.

7.5. Pedestrian Refuges. The City shall maintain pedestrian refuges constructed/revised

as part of the Project according to City practices at no cost to the County.

7.6. Green Bicycle Conflict Zone Markings. The City shall assume maintenance

according to City practices of the newly installed green bicycle conflict zone markings

at no cost to the County.

Page 28 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

7.7. City Road Pavement Striping, Crosswalk Markings, and Tabled Intersection

Markings. The City shall assume maintenance of all CSAH 52 (Nicollet Avenue)

crosswalk markings and tabled intersection markings for roadway users installed as a

part of the Project.

7.8. Storm Sewers. The City shall own and maintain catch basins, manholes, and trunk

lines serving areas beyond the County right of way constructed or reconstructed under

the Project at no cost to the County. Maintenance includes but is not limited to repairs

to structures, casting, and adjacent curb section repairs along with removal of sediments,

vegetation, and ice. Storm sewers ownership and maintenance responsibilities are

further illustrated in the attached Exhibit C.

7.9. Watermain. The City shall own and maintain all watermain installed with the project.

7.10. Boulevard Trees. Upon completion of the Boulevard Tree planting and after the

Establishment Period, the City shall own and maintain the Boulevard Trees according

to its own practices.

7.11. Median Landscaping. The City shall own and maintain the Median Landscaping

according to its own practices.

7.12. City Communication Lines. The City shall be responsible for maintenance and repair

of all city communication lines (primarily fiber optic lines). The City will be responsible

for performing all underground location of city fiber optic lines and related equipment

for the purpose of various design and construction projects or other projects which may

be required through the Gopher State One Call system, and furnishing all labor,

materials, supplies, tools and other necessary items without cost to the County.

8. The County’s Maintenance Responsibilities. Upon completion of the Project, the County

shall provide year-round maintenance at its sole cost as outlined below.

8.1. Roadways. Maintenance of CSAH 52 reconstructed under the Project. Maintenance

includes, but is not limited to, sweeping, debris removal, resurfacing and seal coating,

and any other maintenance activities according to accepted County maintenance

practices.

8.2. Traffic Signals, Rectangular Rapid Flashing Beacons (RRFB), and Components.

8.2.1 Locating Traffic Signal Electrical Power Service Drop Lines. The County

will be responsible for performing all underground location of electrical service

drop from source of power (wood pole or other transformer location) to service

cabinet of the Signal System for the purpose of various design and construction

projects or other projects which may be required through the Gopher State One

Call system, and furnishing all labor, materials, supplies, tools and other

necessary items.

8.2.2 Locating Traffic Signal Cable. The County will be responsible for performing

all underground location of signal equipment, conduit, wiring and related

Page 29 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

equipment for the purpose of various design and construction projects or other

projects which may be required through the Gopher State One Call system, and

furnishing all labor, materials, supplies, tools and other necessary items without

cost to the City.

8.2.3 Locating County Traffic Signal Fiber Optic Lines. The County will be

responsible for performing all underground location of county fiber optic lines

and related equipment for the purpose of various design and construction

projects or other projects which may be required through the Gopher State One

Call system, and furnishing all labor, materials, supplies, tools and other

necessary items without cost to the City.

8.2.4 Traffic Signal Components. The County shall be responsible for maintenance

and repair of all traffic signal system components, including cabinets, controller,

control equipment, conduit system and interconnect cable, signal poles, mast

arms, pushbutton posts, wiring, detection, EVP, signal heads, pedestrian

pushbuttons, Pan Tilt and Zoom (PTZ) cameras, and mast-arm mounted street

signs.

8.2.5 Signal Head Indications. The County shall provide all required maintenance

for the signal head indications. Maintenance includes but is not limited to

replacement of signal indications for vehicular and pedestrian signal indications.

8.2.6 Traffic Signal Interconnect. The County shall be responsible for maintenance

and repair of all communication lines (primarily fiber optic lines) between the

Signal System, other infrastructure, and County’s traffic management center.

8.2.7 Signal Timing and Coordination. The County shall be responsible for signal

timing and coordination. Timing and coordination include but are not limited to

front page timing, coordination timing, EVP timing, pedestrian timing, and

preemption timing.

8.2.8 Traffic Signal Component Knockdowns. The County shall be responsible for

responding to signal and its component knockdown calls and repairing or

replacing associated components damaged as a result of minor or major

knockdowns to ensure proper functioning of traffic signals.

8.2.9 Blocking City Roadways. When performing the Signal System maintenance

work under this Agreement, the County may partially block affected City

roadways within its corporate limits if needed. In cases of emergency, such City

roadways may be wholly blocked and the passage of traffic thereon prevented

by the County. At no time, however, shall the County continue to obstruct the

free passage of traffic on the City roadways for a longer period of time than is

reasonably required for making the necessary traffic signal repairs. The County

shall not cause any portions of the City roadways on which traffic control signals

are to be maintained to be closed to traffic for any reason other than those above

without receiving prior written approval from the City of Richfield and in no

event for a longer time than shall be necessary. In the event of the total blocking

Page 30 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

or closing of any such City roadways, the County shall provide a suitable detour

during such time.

8.2.10 Maintenance Materials and Equipment. When performing the Signal System

maintenance work under this Agreement, the County shall be responsible for

proper signing, marking, barricading and such other warning devices as may be

required to adequately protect the pedestrian and vehicular traffic. All materials

used by the County in the performance of the maintenance work shall conform

to the requirements of the current Edition of the MnDOT "Standard

Specifications for Construction" and all amendments and supplements thereto.

All traffic signs, pavement markings and warning devices shall comply with the

current Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD).

8.3. County Road Pavement Striping. The County shall thereafter maintain and repair

pavement striping, excluding Crosswalk Markings, Tabled Intersection Markings,

Green Bicycle Conflict Zone Markings, for CSAH 52 installed as a part of the Project

at the expense of the County.

8.4. Storm Sewers. The County shall own and maintain culverts, catch basins and leads,

manholes, trunk lines and all other components that serve only County right of way

constructed or reconstructed under the Project at no cost to the City. Maintenance

includes repairs to structures, casting, and adjacent curb section repairs along with

removal of sediments, vegetation, and ice. Storm sewers ownership and maintenance

responsibilities are further illustrated in the attached Exhibit C.

8.5 Stormwater Treatment Infrastructure.

8.5.1 Maintenance. The County shall own and maintain the newly installed/revised

stormwater treatment infrastructure constructed as part of the Project according

to County practices as further illustrated in the attached Exhibit C. Routine

maintenance includes, but is not limited to, removal of litter, clearing ice,

mowing, vegetation management, minor erosion repairs, and replacement of

filter media and sediment removal. Non-routine maintenance, includes

dredging and replacement of stormwater treatment structures. The County

agrees that it will provide 7 calendar day notice to the City and 48-hour notice

to adjacent private properties prior to accessing the improvements for

maintenance on City right of way.

## 8.4.1 Blocking City Roadways. When performing the Stormwater Treatment

Infrastructure maintenance work under this Agreement, the County may

partially block affected City roadways within its corporate limits if needed. In

cases of emergency, such City roadways may be wholly blocked and the

passage of traffic thereon prevented by the County. At no time, however, shall

the County continue to obstruct the free passage of traffic on the City roadways

for a longer period of time than is reasonably required. The County shall not

cause any portions of the City roadways on which Stormwater Treatment

Infrastructure is to be maintained to be closed to traffic for any reason other

than those above without receiving prior written approval from the City of

Page 31 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

Richfield and in no event for a longer time than shall be necessary.

8.4.2 Maintenance Materials and Equipment. When performing the Stormwater

Treatment Infrastructure maintenance work under this Agreement, the County

shall be responsible for proper signing, marking, barricading and such other

warning devices as may be required to adequately protect the pedestrian and

vehicular traffic. All materials used by the County in the performance of the

maintenance work shall conform to the requirements of the current Edition of

the MnDOT "Standard Specifications for Construction" and all amendments

and supplements thereto. All traffic signs, pavement markings and warning

devices shall comply with the current Minnesota Manual on Uniform Traffic

## Control Devices (MN MUTCD). Traffic Control Procedures for Stormwater

Treatment Infrastructure maintenance is further illustrated in the attached

Exhibit D.

9. Authorized Representatives. In order to coordinate the services of the County with the

activities of the City and vice versa so as to accomplish the purposes of this Agreement, the

Hennepin County Highway Engineer or designated representative and the City Engineer or

designated representatives shall manage this Agreement on behalf of the County and the City.

## County of Hennepin:

## Carla Stueve

## County Highway Engineer

## Hennepin County Public Works

## 1600 Prairie Drive, Medina, MN 55340

Office: 612-596-0356

## Carla.Stueve@hennepin.us

## City of Richfield:

## Joe Powers

## City Engineer

1901 66

th

## St East, Richfield MN 55423

(612) 861-9791

jpowers@richfieldmn.gov

## 10. Assignment, Amendments, Default, Waiver, Agreement Complete, Cancellation or

Termination.

10.1. Assignment. Except for routine maintenance performed under Paragraph 7 of this

Agreement, the City shall not assign, subcontract, transfer or pledge this Agreement

and/or the services to be performed hereunder, whether in whole or in part, without the

prior written consent of the County.

10.2. Amendments. Any alterations, variations, modifications or waivers of provisions of

this Agreement shall only be valid when they have been reduced to writing as an

amendment to this Agreement and signed by the Parties hereto.

10.3. Default.

Page 32 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

10.3.1 City Default. If the City fails to perform any of the provisions of this

Agreement or so fails to administer the work as to endanger the performance of

the Agreement, this shall constitute a default. Unless the City's default is excused

by the County, the County may, upon written notice, immediately cancel this

Agreement in its entirety.

10.3.2 County Default. If the County fails to perform any of the provisions of this

Agreement or so fails to administer the work as to endanger the performance of

the Agreement, this shall constitute a default. Unless the County’s default is

excused by the City, the City may, upon written notice, immediately cancel this

Agreement in its entirety.

10.4. Waiver. The County's failure to insist upon strict performance of any provision or to

exercise any right under this Agreement shall not be deemed a relinquishment or waiver

of the same, unless consented to in writing. Such consent shall not constitute a general

waiver or relinquishment throughout the entire term of the Agreement.

10.5. Agreement Complete. The entire Agreement between the Parties is contained herein

and that this Agreement supersedes all oral agreements and negotiations between the

Parties relating to the subject matter hereof. All items referred to in this Agreement are

incorporated or attached and are deemed to be part of this Agreement.

10.6. Cancellation or Termination. This Agreement may be terminated or cancelled by

each party by mutual agreement with or without cause by either party upon thirty (30)

day written notice. This Agreement shall be terminated or cancelled by any party upon

a material breach by the other party. In the event of a termination or cancellation, the

Parties will remain responsible for cost participation as provided in this Agreement for

obligations incurred up through the effective date of the termination or cancellation,

subject to any equitable adjustment that may be required to account for the effects of a

breach.

11. Indemnification.

11.1. The City Indemnifies the County. The City agrees to defend, indemnify and hold

harmless the County, its officials, officers, agents, volunteers, and employees from any

liability, claims, causes of action, judgments, damages, losses, costs or expenses,

including reasonable attorneys’ fees, resulting directly or indirectly from any act or

omission of the City or the City’s consultant or sub consultant, anyone directly or

indirectly employed by them, and/or anyone for whose acts and/or omissions they may

be liable in the performance of the services required by this Agreement, and against all

loss by reason of the failure of the City to perform fully, in any respect, all obligations

under this Agreement. The City’s liability shall be governed by the provisions of

Minnesota Statutes, Chapter 466 or other applicable law.

11.2. The County Indemnifies the City. The County agrees to defend, indemnify and hold

harmless the City, its officials, officers, agents, volunteers, and employees from any

liability, claims, causes of action, judgments, damages, losses, costs or expenses,

Page 33 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

including reasonable attorneys’ fees, resulting directly or indirectly from any act or

omission of the County or the County’s consultant or sub consultant, anyone directly or

indirectly employed by them, and/or anyone for whose acts and/or omissions they may

be liable in the performance of the services required by this Agreement, and against all

loss by reason of the failure of the County to perform fully, in any respect, all obligations

under this Agreement. The County’s liability shall be governed by the provisions of

Minnesota Statutes, Chapter 466 or other applicable law.

11.3. Single Governmental Unit. For purposes of determining total liability for damages

under this Agreement, the City and County will be considered a single governmental

unit pursuant to Minnesota Statutes, section 471.59, subd. 1a(b).

12. Insurance. The County and the City agree that any future contract let by the Parties for the

performance of any of the work included hereunder shall include clauses that will: 1) Require

the contractor to indemnify and hold the County and the City, their commissioners, officers,

agents and employees harmless from any liability, claim, demand, judgments, expenses, action

or cause of action of any kind or character arising out of any act or omission of the contractor,

their officers, employees, agents or subcontractors; 2) Require the contractor to be an

independent contractor for the purposes of completing the work provided for in this

Agreement; and 3) Require the contractor to provide and maintain enough insurance so as to

assure the performance of its indemnification and hold harmless obligation:

Limits

(1) Commercial General Liability on an occurrence

basis with contractual liability coverage:

## General Aggregate $2,000,000

## Products - Completed Operations Aggregate $2,000,000

## Personal and Advertising Injury $1,500,000

## Each Occurrence - Combined Bodily Injury

and Property Damage $1,500,000

Hennepin County and the City of Richfield shall be named as additional

insureds for the Commercial General Liability coverage with respect to

operations covered under this Agreement.

## (2) Automobile Liability:

Combined Single limit each occurrence coverage or the

equivalent covering owned, non-owned, and hired

automobiles: $1,500,000

(3) Workers’ Compensation and employer’s Liability:

## Workers’ Compensation: Statutory

If the contractor is based outside the State of

Minnesota coverage must apply to Minnesota laws.

Page 34 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

## Employer’s Liability. Bodily injury by:

## Accident – Each Accident $500,000

## Disease – Policy Limit $500,000

## Disease - Each Employee $500,000

(4) Professional Liability – Per Claim and Aggregate: $2,000,000

The above listed Professional Liability insurance will not be required in any construction

contract let by the City if the City’s contractors are not required to perform design engineering

as part of the construction contract.

An umbrella or excess policy over primary liability coverages is an acceptable method to

provide the required insurance limits.

The above subparagraphs establish minimum insurance requirements. It is the sole

responsibility of the City’s contractors to determine the need for and to procure additional

insurance which may be needed in connection with the Project.

All insurance policies shall be open to inspection by the County and the City. Copies of policies

and certificates of insurance shall be submitted to the County and the City upon written request.

13. Worker Compensation Claims.

13.1. City’s Employees. Any and all employees of the City and all other persons engaged by

the City in the performance of any work or services required or provided for herein to

be performed by the City shall not be considered employees of the County, and any and

all claims that may or might arise under the Workers' Compensation Act or the

Unemployment Compensation Act of the State of Minnesota on behalf of the employees

while so engaged and any and all claims made by any third parties as a consequence of

any act or omission on the part of the employees while so engaged on any of the work

or services provided to be rendered herein shall in no way be the obligation or

responsibility of the County.

13.2. County’s Employees. Any and all employees of the County and all other persons

engaged by the County in the performance of any work or services required or provided

for herein to be performed by the County shall not be considered employees of the City,

and any and all claims that may or might arise under the Workers' Compensation Act or

the Unemployment Compensation Act of the State of Minnesota on behalf of the

employees while so engaged and any and all claims made by any third parties as a

consequence of any act or omission on the part of the employees while so engaged on

any of the work or services provided to be rendered herein shall in no way be the

obligation or responsibility of the City.

14. Records/Audits. The City agrees that the County, the State Auditor or any of their duly

authorized representatives at any time during normal business hours, and as often as they may

reasonably deem necessary, shall have access to and the right to examine, audit, excerpt and

transcribe any books, documents, papers, records, etc., which are pertinent to the Project and

Page 35 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

the accounting practices and procedures of the City which involve transactions relating to this

Agreement. The applicable term of this provision is six years consistent with Minn. Stat 16C.,

subd. 5.

15. Nondiscrimination. The provisions of Minnesota Statute Section 181.59 and of any

applicable local ordinance relating to civil rights and discrimination and the Affirmative Action

Policy statement of Hennepin County shall be considered a part of this Agreement as though

fully set forth herein.

16. Counterparts/Electronic Signatures. This Agreement may be executed in one or more

counterparts, each of which will be deemed to be an original copy of this Agreement and all

of which, when taken together, will be deemed to constitute one and the same agreement. The

facsimile, email or other electronically delivered signatures of the Parties shall be deemed to

constitute original signatures, and facsimile or electronic copies hereof shall be deemed to

constitute duplicate originals.

17. Minnesota Laws Govern. The laws of the State of Minnesota shall govern all questions and

interpretations concerning the validity and construction of this Agreement and the legal

relations between the Parties and their performance. The appropriate venue and jurisdiction

for any litigation will be those courts located within the County of Hennepin, State of

Minnesota. Litigation, however, in the federal courts involving the Parties will be in the

appropriate federal court within the State of Minnesota.

(This space left intentionally blank)

Page 36 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

IN TESTIMONY WHEREOF, the Parties hereto have caused this Agreement to be executed

by their respective duly authorized officers and agree to be bound by the provisions herein set

forth.

CITY OF RICHFIELD

## By:_______________________________

## Mayor

Date:______________________________

## And:______________________________

## City Manager

Date:______________________________

COUNTY OF HENNEPIN

ATTEST:

## By: By:__________________________________

Deputy/Clerk of the County Board Chair of its County Board

## Date: Date: ________________________________

And: ________________________________

## County Administrator

Date: ________________________________

## REVIEWED BY

## THE COUNTY ATTORNEY’S OFFICE: And:_________________________________

## Assistant County Administrator, Public Works

## By: Date:________________________________

## Assistant County Attorney

## Date:

## RECOMMENDED FOR APPROVAL

## REVIEWED: By:_________________________________

## By: County Highway Engineer

## County Administrative Clerk Date:________________________________

## Date:

## RECOMMENDED FOR APPROVAL

## By:_________________________________

## Department Director, Transportation

## Operations

## Date:________________________________

Page 37 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

## EXHIBIT A

## Engineer’s Estimate and Division of Cost Summary

Page 38 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

## EXHIBIT B

## Project Plan Title Sheet

Page 39 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

## EXHIBIT C

## Drainage Ownership and Maintenance Responsibilities

Page 40 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

## EXHIBIT D

## Traffic Control Procedures for Stormwater

## Treatment Infrastructure Maintenance

Page 41 of 76

## Agreement No. PW 22-19-25

## CSAH No. 52 C.P. 2120800

## EXHIBIT E

## Landscaping Project

Page 42 of 76

## TOTAL

## Hennepin County

## City of Richfield

## Roadway / Storm

## City of Richfield

## Sanitary / Water

## Construction Contract Total

(1)

19,083,181.60$

13,365,398.85$

3,330,469.75$

2,387,313.00$

## Design Engineering

(2)

686,133.93$

-$

399,656.37$

286,477.56$

## Construction Administration

(2)

333,046.98$

-$

333,046.98$

-$

## Right-of-Way

(3)

1,700,750.00$

1,068,375.00$

632,375.00$

-$

## Boulevard Trees

(4)

38,800.00$

38,800.00$

-$

-$

## Median Landscaping

(5)

76,335.00$

25,445.00$

50,890.00$

-$

## Contingency

(6)

1,908,318.16$

1,336,539.89$

333,046.98$

238,731.30$

## PROJECT TOTAL

23,826,565.67$

15,834,558.74$

5,079,485.07$

2,912,521.86$

## NOTES:

(1)(2)(3)(4)(5)(6)

10% contigency applied to Construction Contract Total.100 boulevard trees based on $388 per tree at 100% County cost to be installed by County Forestry staff.Median Landscaping costs split 33% (County) / 67% (City).

## CSAH 52 (NICOLLET AVENUE) - HENNEPIN COUNTY PROJ. NO.: 2120800 - (SAP 027-652-046, SAP 157-020-034)

## EXHIBIT "A" - DIVISION OF COST SUMMARY

Based on Hennepin County Cost Participation Policy dated October 20, 2020.22% fee applied to City Construction Contract Totals(12% Design Engineering + 10% Construction Administration)Right-of-Way costs split 50% (County) / 50% (City). City Stormwater Quality Fee of $218,000.00 is applied to the County's share of Right-of-Way costs and reduces the City's share of Right-of-Way costs.

File Location:c:\bentley\pw_working_hc\dms10419\2025V_CSAH052_2120800_SEQ_Estimate_Final; WORKSHEET:(EE Summary)

1 of 1

## Last Update: 1/21/2026

Page 43 of 76

## MnDOT METRO DISTRICT

## HENNEPIN COUNTY

## PROJECT LOCATION

2

.

6

## Penn

## Lake

2

.

5

2

.

0

1.6

## Long

## W

ood

## Lake

1

.

7

1

.

1

## MINNEAPOLIS-

## ST. PAUL

## INTERNATIONAL

## AIRPORT

0

.

1

0

.

3

0.1

0

.

9

## POP.

## Rich-

field

## Lake

1

.

2

1.1

## Grass

## Lake

0

.

6

## Mother

## L.

## I

n

c

.

## Lake

## N. N. G. CO.

16

"

16"

## N. N. G. CO.

1

6

"

## N

## G

25

1

3

5

27

29

33

35

23

## W

.

## ST.

0.4

32

5

1

52

35

62

121

## 35W

62

## 2B

3

## 4A

## 4B

5

52

32

53

## 2C

494

77

## 2A

## WOLD-

## CHAMBERLAIN

## FIELD

## L.R.T.

76

## T

## H

35,228

## XERXES

## S

.

## E

.

60

## T

## H

## S

## T

.

## R

## D

.

## S

## HAKO

## P

## EE

## 12TH

## PORTLAND

## A

## V

## E

.

## AVE.

## AVE.

## AV

## E

.

## S

## T

.

## AVE.

80

## T

## H

## S

## T

.

## S

## T

.

## P

## E

## NN

## 82ND

## L

## YNDA

## LE

## NICOLLET

## RICHFIELD

## AND DOCUMENTING EXISTING UTILITIES".

## "STANDARD GUIDELINES FOR INVESTIGATING

## GUIDELINES OF CI/ASCE 38-22 ENTITLED

## DETERMINED ACCORDING TO THE

## THIS UTILITY QUALITY LEVEL WAS

## IN THIS PLAN IS UTILITY QUALITY LEVEL D.

## THE SUBSURFACE UTILITY INFORMATION

## NET LENGTH

## EXCEPTION LENGTH

## BRIDGE LENGTH

## GROSS LENGTH

## MILES

## MILES

## MILES

## MILES

## SAP 027-652-046 / SAP 157-020-034 LOCATED ON CSAH 52 FROM 77TH ST TO CSAH 53 (66TH ST)

27, 34

## T 28 N, R 24 W SECTIONS:

## SECTIONS:

## THE FOLLOWING LAND

## PROJECT IS LOCATED WITHIN

Design Speed not achieved at:

Height of eye / Height of Object

## Based on Sight Distance

## Design Speed

## ESALS (20)

## NO. OF PARKING LANES

## NO. OF TRAFFIC LANES

## FUNCTIONAL CLASSIFICATION

## ADT 2048

## ADT 2023

## R-VALUE

## (NICOLLET AVE)

## CSAH 52

## FOR:

## DESIGN DESIGNATION

## THE PROJECT LENGTH AND DESCRIPTION ARE BASED ON CSAH 52 (NICOLLET AVE) ALIGNMENT

## ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.

## SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL

## IF ANY WERE PREPARED BY ME OR UNDER MY DIRECT

## I HEREBY CERTIFY THAT THE FINAL FIELD REVISIONS,

## DATE: SIGNATURE: ___________________

## PRINT NAME: LICENSE: #

## GOVERNING SPECIFICATIONS

## HENNEPIN COUNTY TRANSPORTATION DEPARTMENT

## CITY OF RICHFIELD

## SANITARY SEWER, STORM SEWER, WATERMAIN, ROUNDABOUTS, AND LIGHTING

## CONSTRUCTION PLAN FOR GRADING, CONCRETE AND BITUMINOUS SURFACING, BIKE LANE, ADA IMPROVEMENTS,

## 52 (NICOLLET AVE)COUNTY STATE AID HIGHWAY NO.

## INDEX

## SHEET NO.

## DESCRIPTION

## X-SECTIONS

## CONSTRUCTION STAGING & TRAFFIC CONTROL PLAN

## SIGNING & PAVEMENT MARKING PLAN

## PEDESTRIAN CROSSWALK FLASHER SYSTEM PLAN

## LIGHTING & FIBER OPTIC PLAN

## PERMANENT TURF ESTABLISHMENT PLAN

## TEMP EROSION CONTROL PLAN

## STORMWATER POLLUTION PREVENTION PLAN

## DRAINAGE DESIGN DETAILS

## DRAINAGE TABULATIONS

## DRAINAGE PROFILES

## DRAINAGE & SUPERELEVATION PLAN

## SANITARY & WATERMAIN PLAN & PROFILE

## INTERSECTION DETAILS

## CONSTRUCTION PROFILES

## CONSTRUCTION PLAN

## REMOVAL PLAN

## ALIGNMENT PLAN & TABULATION

## EXISTING TOPOGRAPHY & UTILITY PLAN

## MISCELLANEOUS DETAILS

## STANDARD PLAN

## TYPICAL SECTIONS

## QUANTITY TABULATIONS

## EARTHWORK SUMMARY, NOTES, & TABULATIONS

## CONSTRUCTION & SOILS NOTES

## STANDARD PLATES & INDEX OF TABULATIONS

## STATEMENT OF ESTIMATED QUANTITIES

## GENERAL LAYOUT

## TITLE SHEET

## THIS PLAN CONTAINS SHEETS

## APPROVED

## FOR APPROVAL

## RECOMMENDED

## APPROVED

## 10-TON DESIGN

10,300

## MINOR ARTERIAL

2

0

1,719,000

## FEET

## FEET

## FEET

## FEET

7352.151.39

0

0

7352.15

0

0

1.39

## R 24 W

## T 28 N

## ROUNDABOUTS

## 30 MPH

## STOPPING

3.5' / 2.0'

## HENNEPIN COUNTY: COUNTY HIGHWAY ENGINEER

## HENNEPIN COUNTY: DESIGN DIVISION ENGINEER

## CITY OF RICHFIELD: CITY ENGINEER

## WITH STATE AID RULES/POLICY

## DISTRICT STATE AID ENGINEER: REVIEWED FOR COMPLIANCE

## STATE AID ENGINEER

## APPROVED FOR STATE AID FUNDING:

## SAP 157-020-034, CP 41019, SAP 027-652-046

## TITLE SHEETSHEET

## 2120800/ HENNEPIN COUNTY PROJECT 52 (NICOLLET AVE)C.S.A.H.

## SCALES

## VERT. 1" = 10'

## HORIZ. 1" = 20'

1" = 200'

1" = 5,000'

1" = 20'

1" = 40'

## CROSS SECTIONS

## GENERAL LAYOUT

## INDEX MAP

## INTERSECTION PLAN

## PLAN

9,300

1

366

## DATE

## DATE

## DATE

## DATE

## DATE

## PATH & FILENAME:

c:\bentley\pw_working_hc\dms10336\0522120800_100tsh.dgn

## PLOTTED/REVISED:

## PLOT NAME:

## Title Sheet

4/1/2025

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

--/--/----

## S. VOELKER

## E. KRIEGER

## M. SWANSON

## COMMISSIONER / STATE AID ENGINEER, ON APRIL 3, 2025.

## THE VARIANCE WAS SIGNED BY KRISTINE ELWOOD, ASSISTANT

## IN LIEU OF THE REQUIRED 11-FOOT MINIMUM LANE WIDTH.

## SO AS TO PERMIT THE USE OF A 10-FOOT MINIMUM LANE WIDTH

## FROM MINNESOTA RULE 8820.9936, DATED DECEMBER 19, 2024,

## THIS PROJECT HAS BEEN GRANTED A VARIANCE

## SAP 027-652-046 / SAP 157-020-034 (CSAH 52)

## DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A

## STEVEN M. VOELKERLICENSE NO.

54175

12/15/2025

## DATE

1

25-34

-3571

72-79

80-94

95-117

118131

146-167

132-145

-168

184

198-210

211-220

221-227

228234

238-251

235-237

267-283

284-290

291-

340

## XS1-XS105

471

-

-

-252266

24

-

59

-

10

12

## IN THE CITY OF RICHFIELD.

185-197

341-

366

## PATH

## SHARED-USE

## ONE-WAY

## N/A

## N/A

## N/A

## N/A

## N/A

## N/A

## N/A

## 20 MPH

## STOPPING

## ROUNDABOUTS

4.5' / 0.0'

## BEGIN CONSTRUCTION

## STA 1000+57.85

## CP 41019

## SAP 027-652-046 / SAP 157-020-034

## CP NO 2120800

## CSAH 52 (NICOLLET AVE)

## STA 1074+10.00

## CP 41019

## SAP 027-652-046 / SAP 157-020-034

## CP NO 2120800

## CSAH 52 (NICOLLET AVE)

## END CONSTRUCTION

1315

-

1624

-

## TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS."

## SHALL CONFORM TO THE LATEST MMUTCD, INCLUDING THE LATEST "FIELD MANUAL FOR

## SPECIFICATIONS FOR CONSTRUCTION” SHALL GOVERN. ALL TRAFFIC CONTROL DEVICES

## THE 2025 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION “STANDARD

-

11

1/7/2026

Page 44 of 76

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## SAN

## SAN

## SAN

## SW

## SW

## SW

## SW

## 2' CONC WALL

## SAN

## SAN

## SAN

## SAN

## SAN

## SW

## SW

## SW

## SW

## EX. 8" CIP

## EX. 8" DIP

## E

## X

.

8

"

## C

## I

## P

## E

## X

.

8

"

## C

## I

## P

## EX. 9" VCP

## EX. 9" VCP

0.02

0.035

0.035

0.02

+

1

4

+

5

4

+

5

1

+

7

4

0

.

0

1

5

0.005

0.005

0.015

+

0

8

+

2

2

+

6

4

0.06

+

85

+

6

4

## W 77TH ST

## E 77TH ST

## SAN

## SAN

710

700

230

1000

## � CSAH 52 (NICOLLET AVE)

## CB-1000

## CB-1003

## CB-1004

## CB-1005

## CB-1006

## CB-1001

## 12" RCP INV = 841.39

## STORM SEWER

## CONNECT TO EXISTING

## 12" RCP INV = 841.80

## STORM SEWER

## CONNECT TO EXISTING

## MH-108

## CB-1002

## CB-1007

## 12" RCP INV = 841.15

## STORM SEWER

## CONNECT TO EXISTING

0'

## SCALE

40'

20'

## BEGIN CONSTRUCTION

## CSAH 52 (NICOLLET AVE)

## CP NO 2120800

## SAP 027-652-046 / SAP 157-020-034

## CP 41019

## STA 1000+57.85

## MATCHLINE STA 1004+50

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

198

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 45 of 76

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

42

"

## R

## C

## P

## E

## X

.

4

2

"

## R

## C

## P

## E

## X

.

1

0

"

## P

## V

## C

## E

## X

.

1

2

"

## P

## V

## C

## SAN

+

5

1

0.05

0

.

02

+

6

1

0.02

+

84

+

9

4

0.06

+

09

0

.

0

6

0

.

0

2

0

.

0

2

0

.

0

5

+

2

6

+

3

1

+

54

+

6

5

+

20

0.015

0.005

0

.

0

6

0

.

0

5

+

9

3

+

99

0

.

06

0

.

0

5

+

1

7

+

2

2

## SAN

## SAN

## SAN

## SAN

## SAN

## SAN

## SAN

1

0

220

200

210

1005

1

0

1

0

## � 76TH ST

## � CSAH 52 (NICOLLET AVE)

## � 76TH ST

## CB-1008

## CB-1011

## CB-1010

## CB-1027

## CB-1031

## CB-1029

## CB-1017

## CB-1016

## CB-1018

## CB-1019

## CB-1021

## EL 843.64

## STA 220+49.03

## 76TH NE QUAD

## LOW PT

## EL 843.55

## STA 233+40.05

## 76TH SE QUAD

## LOW PT

## EL 843.34

## STA 222+19.68

## 76TH NE QUAD

## LOW PT

## EL 843.60

## STA 201+96.00

## 76TH SW QUAD

## LOW PT

## EL 844.55

## STA 11+49.56

## 76TH RAB CIR

## LOW PT

## EL 844.74

## STA 11+09.07

## 76TH RAB CIR

## HIGH PT

## CB-1036

## CB-1035

## CB-1037

## CB-1034

## EL 843.55

## STA 231+64.87

## 76TH SE QUAD

## LOW PT

## EL 844.15

## STA 201+04.32

## 76TH SW QUAD

## HIGH PT

## EL 843.89

## STA 200+47.98

## 76TH SW QUAD

## LOW PT

## EL 843.34

## STA 211+32.02

## 76TH NW QUAD

## LOW PT

## EL 843.90

## STA 213+21.49

## 76TH NW QUAD

## LOW PT

## EL 844.34

## STA 212+63.02

## 76TH NW QUAD

## HIGH PT

## EL 844.15

## STA 221+07.45

## 76TH NE QUAD

## HIGH PT

## EL 844.38

## STA 23274.67

## 76TH SE QUAD

## HIGH PT

## EL 844.56

## STA 10+69.08

## 76TH RAB CIR

## LOW PT

## EL 844.74

## STA 11+09.07

## 76TH RAB CIR

## HIGH PT

## EL 844.00

## STA 1005+18.11

## CSAH 52

## LOW PT

## CB-1009

## CB-1033

## CB-1032

## CB-1026

## CB-1030

## CB-1028

## CB-1014

## CB-1024

## CB-1020

0'

## SCALE

40'

20'

## MATCHLINE STA 1004+50

## MATCHLINE STA 1010+50

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

199

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 46 of 76

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

+

1

7

0.02

+

07

0

.

0

6

+

4

1

+

51

0

.

06

0.02

+

7

3

+

80

+

8

9

+

35

+

4

1

+

5

2

0

.

01

5

0

.

0

0

.

005

0

.

00

5

0

.

0

0

.

015

0

.

0

0

5

+

52

0

.

0

1

5

+

5

0

+

6

0

0

.

0

0

5

0

.

0

1

5

## SAN

## SAN

## SAN

## SAN

110

1015

## � 75TH ST

## � CSAH 52 (NICOLLET AVE)

## � 75TH ST

## CB-1023

## CB-1127

## CB-1124

## CB-1125

## CB-1100

## CB-1102

## CB-1107

## 18" RCP INV = 837.46

## STORM SEWER

## CONNECT TO EXISTING

## CB-1106

## CB-1104

## CB-1022

## EL 844.50

## STA 1013+94.63

## CSAH 52

## LOW PT

## CB-1126

## MH-1133

## MH-1132

## CB-1103

## CB-1105

## MH-1131

## MH-1130

## EL 844.57

## STA 111+88.32

## 75TH ST

## LOW PT

## EL 844.57

## STA 111+88.38

## 75TH ST

## LOW PT

## MH-1129

0'

## SCALE

40'

20'

## MATCHLINE STA 1016+50

## MATCHLINE STA 1010+50

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

200

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 47 of 76

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

9

"

## V

## C

## P

## EX. 9" VCP

## G

## G

## G

+

5

5

0

.

06

+

6

5

0

.

0

2

+

8

9

0

.

0

2

+

9

9

0

.

0

6

+

50

+

60

0.015

0.005

0

.

0

1

5

+

2

5

+

3

3

0

.

01

5

0

.

015

+

0

2

+

1

0

0

.

01

5

0

.

0

0

.

0

+

4

4

+

9

0

## SAN

## SAN

## SAN

12

0

1020

## � CSAH 52 (NICOLLET AVE)

## � 74TH ST

## � 74TH ST

## CB-1108

## CB-1111

## CB-1114

## CB-1110

## EL 846.54

## STA 1018+50.01

## CSAH 52

## HIGH PT

## EL 845.52

## STA 1021+00.00

## CSAH 52

## LOW PT

## CB-1109

## CB-1116

## CB-1115

## CB-1117

## EL 845.53

## STA 1020+82.55

## CSAH 52

## LOW PT

0'

## SCALE

40'

20'

## MATCHLINE STA 1022+50

## MATCHLINE STA 1016+50

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

201

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 48 of 76

## T

## P

## T

## P

## SAN

## SAN

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

4

2

"

## R

## C

## P

## E

## X

.

42

"

## R

## C

## P

+

8

3

0

.

0

6

0

.

0

2

+

8

8

+

3

1

+

4

1

0

.

0

6

0

.

0

2

+

5

0

+

6

0

0.015

0.005

+

71

+

8

1

0

.

0

1

5

0

.

0

05

0.015

+

8

6

+

9

6

0.005

0

.

0

0

5

+

8

6

+

9

6

0

.

0

15

## SAN

## SAN

## SAN

## SAN

730

7

3

5

720

7

2

5

2

0

350

320

340

1

02

5

## � CSAH 52 (NICOLLET AVE)

## � 73RD ST

## � 73RD ST

## CB-1118

## CB-1120

## CB-1123

## CB-1122

## CB-1202

## CB-1205

## 15" RCP INV = 836.29

## STORM SEWER

## CONNECT TO EXISTING

## EL 846.10

## STA 321+79.54

## 73RD SW QUAD

## LOW PT

## EL 846.47

## STA 21+16.56

## 73RD RAB CIR

## LOW PT

## EL 847.78

## STA 21+47.31

## 73RD RAB CIR

## HIGH PT

## CB-1130

## EL 847.26

## STA 1027+69.39

## CSAH 52

## LOW PT

## CB-1128

## CB-1121

## EL 846.51

## STA 321+04.84

## 73RD SW QUAD

## HIGH PT

## EL 846.81

## STA 321+04.84

## 73RD SW QUAD

## HIGH PT

## EL 846.05

## STA 351+88.96

## 73RD SE QUAD

## HIGH PT

## EL 846.82

## STA 351+88.96

## 73RD SE QUAD

## HIGH PT

## EL 845.82

## STA 351+86.97

## 73RD SE QUAD

## LOW PT

## EL 846.36

## STA 341+28.67

## 73RD NE QUAD

## HIGH PT

## EL 846.13

## STA 342+10.34

## 73RD NE QUAD

## LOW PT

## EL 846.65

## STA 332+94.44

## 73RD NW QUAD

## HIGH PT

## EL 846.06

## STA 332+03.80

## 73RD NW QUAD

## LOW PT

## CB-1119

## MH-1134

## MH-1135

## MH-1137

## CB-1129

## MH-1136

## CB-1200

## CB-1204

## CB-1203

## CB-1201

## CB-1132

0'

## SCALE

40'

20'

## MATCHLINE STA 1028+50

## MATCHLINE STA 1022+50

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

202

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 49 of 76

## T

## P

## SAN

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

8

"

## C

## I

## P

0

.

0

1

5

+

41

+

5

3

+

6

1

0

.

0

1

5

0

.

0

+

0

4

+

1

4

+

22

0

.

01

5

0

.

0

0

.

0

1

5

## SAN

## SAN

## SAN

## SAN

1

4

0

33

0

1

0

3

0

## � CSAH 52 (NICOLLET AVE)

## � 72ND ST

## � 72ND ST

## CB-1206

## CB-1209

## CB-1211

## CB-1210

## CB-1312

## CB-1310

## CB-1315

## CB-1313

## DRAINAGE STRUCTURE

## CONNECT INTO EXISTING

## DRAINAGE STRUCTURE

## CONNECT INTO EXISTING

## EL 848.96

## STA 1030+21.17

## CSAH 52

## HIGH PT

## EL 848.61

## STA 1031+28.90

## CSAH 52

## LOW PT

## EL 849.01

## STA 1032+51.23

## CSAH 52

## HIGH PT

## EL 848.51

## STA 1033+96.76

## CSAH 52

## LOW PT

## MH-1332

## CB-1207

## CB-1208

## CB-1213

## MH-1334

## MH-1330

## CB-1324

## CB-1325

## ADJUST FRAME & RING CASTING

## ADJUST FRAME & RING CASTING

## EL 848.62

## STA 1031+40.17

## CSAH 52

## LOW PT

## EL 848.69

## STA 141+83.26

## 72ND ST

## LOW PT

## EL 848.69

## STA 141+83.30

## 72ND ST

## LOW PT

0'

## SCALE

40'

20'

## MATCHLINE STA 1034+50

## MATCHLINE STA 1028+50

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

203

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 50 of 76

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

0

.

0

1

5

+

9

9

+

1

2

0

.

0

0

.

0

1

5

+

2

0

0

.

0

1

5

+

6

5

+

7

3

+

8

3

0

.

0

1

5

0

.

0

+

9

5

0

.

0

1

5

+

0

5

0

.

0

0

5

0

.

0

0

5

+

64

+

7

4

0

.

0

1

5

## SAN

## SAN

150

1

0

3

5

1040

## � CSAH 52 (NICOLLET AVE)

## � 71ST ST

## CB-1311

## CB-1308

## CB-1307

## CB-1305

## CB-1306

## CB-1304

## CB-1302

## CB-1303

## CB-1301

## CB-1300

## CB-1309

0'

## SCALE

40'

20'

## MATCHLINE STA 1040+25

## MATCHLINE STA 1034+50

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

204

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 51 of 76

## EX. 20" CL-C

## EX. 9" VCP

+

2

2

0

.

0

6

## SAN

750

740

450

## � CSAH 52 (NICOLLET AVE)

## CB-1316

## CB-1317

## CB-1319

## CB-1321

## EL 849.98

## STA 450+47.97

## 70TH SE QUAD

## LOW PT

## EL 851.79

## STA 1040+98.76

## CSAH 52

## HIGH PT

## EL 850.36

## STA 1044+17.25

## CSAH 52

## LOW PT

0'

## SCALE

40'

20'

## MATCHLINE STA 1044+25

## MATCHLINE STA 1040+25

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

205

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## AB

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 52 of 76

## T

## P

## SAN

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

11

1

4

2

851

.

8

6

## NON

-

## T

## R

## A

## F

## F

## I

## C

## S

## I

## G

## N

+

3

2

+

3

5

0

.

0

2

0

.

02

0

.

06

+

3

0

0

.

0

1

5

+

7

6

+

8

8

0

.

0

0

5

0.015

+

2

2

+

1

7

0.005

## S

## A

## N

## S

## AN

## S

## A

## N

## S

## A

## N

## S

## A

## N

3

0

755

745

4

3

0

440

1045

1050

## � CSAH 52 (NICOLLET AVE)

## � 70TH ST RAB WB

## � 70TH ST RAB WB

## CB-1323

## CB-1320

## CB-1417

## CB-1416

## CB-1418

## CB-1419

## CB-1421

## EL 851.76

## STA 421+54.73

## 70TH SW QUAD

## HIGH PT

## EL 849.98

## STA 422+88.84

## 70TH SW QUAD

## LOW PT

## EL 851.55

## STA 452+02.73

## 70TH SE QUAD

## HIGH PT

## EL 851.16

## STA 441+79.99

## 70TH NE QUAD

## LOW PT

## EL 851.15

## STA 432+00.17

## 70TH NE QUAD

## LOW PT

## EL 851.51

## STA 431+05.85

## 70TH NE QUAD

## HIGH PT

## EL 851.84

## STA 30+18.81

## 70TH RAB CIR

## LOW PT

## EL 851.79

## STA 1047+47.77

## CSAH 52

## HIGH PT

## EL 852.13

## STA 30+62.00

## 70TH RAB CIR

## HIGH PT

## CB-1333

## EL 851.73

## STA 432+48.27

## 70TH NE QUAD

## HIGH PT

## EL 851.55

## STA 441+38.07

## 70TH NE QUAD

## HIGH PT

## EL 851.58

## STA 442+66.10

## 70TH NE QUAD

## HIGH PT

## EL 851.84

## STA 31+04.98

## 70TH RAB CIR

## LOW PT

## EL 852.33

## STA 31+53.77

## 70TH RAB CIR

## HIGH PT

## CB-1318

## CB-1332

## CB-1329

## CB-1330

## CB-1334

## CB-1335

## CB-1414

## CB-1415

## � 70TH ST RAB EB

## � 70TH ST RAB EB

0'

## SCALE

40'

20'

## MATCHLINE STA 1050+00

## MATCHLINE STA 1044+25

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

206

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## LCH

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 53 of 76

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

6

"

## C

## I

## P

+

38

0.06

+

4

8

0.02

0

.

0

1

5

+

20

0

.

0

+

2

6

0

.

01

5

+

3

4

+

8

0

0

.

01

5

0

.

0

+

8

9

0

.

0

1

5

+

9

6

0.015

+

5

3

0.005

+

6

3

0.015

+

4

0

+

5

0

0.005

0.015

0.005

+

3

1

+

21

## S

## A

## N

## S

## A

## N

## S

## A

## N

## S

## AN

1

70

175

1050

1055

## � CSAH 52 (NICOLLET AVE)

## � W 69TH ST

## � E 69TH ST

## CB-1421

## CB-1420

## CB-1422

## CB-1423

## CB-1425

## CB-1424

## MH-1430

## CB-1432

## CB-1431

## CB-1409

## CB-1407

## CB-1405

## CB-1408

## CB-1406

## CB-1404

## CB-1402

## CB-1403

## 18" RCP INV = 843.44

## STORM SEWER

## CONNECT TO EXISTING

## EL 848.88

## STA 1053+26.07

## CSAH 52

## LOW PT

## MH-1433

## EL 848.77

## STA 170+72.12

## 69TH ST

## LOW PT

## EL 848.77

## STA 170+72.09

## 69TH ST

## LOW PT

0'

## SCALE

40'

20'

## MATCHLINE STA 1055+75

## MATCHLINE STA 1050+00

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

207

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## LCH

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 54 of 76

## T

## P

## E

## X

.

1

6

"

## C

## I

## P

## EX. 6" CIP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

9

"

## V

## C

## P

## E

## X

.

9

"

## V

## C

## P

## E

## X

.

9

"

## V

## C

## P

+

9

4

+

1

4

0.06

0.02

+

9

3

0.025

+

7

9

0.025

+

8

0

+

0

5

0.02

0.02

+

9

3

+

6

4

0.03

+

6

7

0.03

0.02

+

9

7

0

.

0

0

5

+

6

2

## 0.5% BLVD

## 0.5% BLVD

## 0.5% BLVD

0.02

+

7

1

0

.

0

0

.

0

0

5

+

78

0

.

0

0

5

+

2

5

0

.

0

0

.

01

5

+

3

6

+

3

3

## S

## A

## N

## S

## A

## N

## S

## A

## N

## S

## AN

1

8

0

1060

## � CSAH 52 (NICOLLET AVE)

## � 68TH ST

## � 68TH ST

## CB-1613

## CB-1612

## CB-1614

## CB-1615

## EL 850.32

## STA 1057+23.55

## CSAH 52

## HIGH PT

## CB-1400

## CB-1401

0'

## SCALE

40'

20'

## MATCHLINE STA 1061+25

## MATCHLINE STA 1055+75

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

208

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## LCH

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

Page 55 of 76

## EX. 9" SANEX. 9" SAN

## E

## X

.

9

"

## V

## C

## P

## E

## X

.

9

"

## V

## C

## P

## EX. 9" VCP

+

6

9

0

.

0

6

0

.

02

+

7

9

0

.

00

5

0

.

00

5

0

.

0

1

5

+

1

4

+

2

0

## S

## A

## N

## S

## A

## N

## S

## A

## N

4

0

8

0

0

570

5

4

0

560

780

790

1065

## � CSAH 52 (NICOLLET AVE)

## � 67TH ST RAB WB

## � 67TH ST

## CB-1616

## CB-1617

## CB-1619

## CB-1620

## CB-1621

## CB-1622

## CB-1634

## CDS-3035-6-C

## MH-1638

## CB-1608

## CB-1607

## 15" RCP INV = 837.37

## STORM SEWER

## CONNECT TO EXISTING

## EL 845.23

## STA 561+86.58

## 67TH NW QUAD

## LOW PT

## EL 845.69

## STA 552+35.81

## 67TH NW QUAD

## LOW PT

## EL 846.50

## STA 40+57.14

## 67TH RAB CIR

## HIGH PT

## EL 846.08

## STA 41+91.87

## 67TH RAB CIR

## LOW PT

## EL 845.75

## STA 541+00.63

## 67TH SW QUAD

## LOW PT

## EL 845.53

## STA 1066+66.53

## CSAH 52

## LOW PT

## 8" ROOF DRAIN

## STORM SEWER

## CONNECT TO EXISTING

## CB-1631

## CB-1632

## CB-1630

## CB-1633

## CB-1635

## JFPD0812

## CB-1618

## EL 845.22

## STA 551+26.75

## 67TH NW QUAD

## LOW PT

## EL 845.75

## STA 552+14.14

## 67TH NW QUAD

## HIGH PT

## EL 845.63

## STA 561+08.76

## 67TH NW QUAD

## HIGH PT

## EL 846.24

## STA 40+93.90

## 67TH RAB CIR

## LOW PT

## EL 846.36

## STA 41+29.37

## 67TH RAB CIR

## HIGH PT

## ADJUST FRAME & RING CASTING

## ADJUST FRAME & RING CASTING

## � 67TH ST RAB EB

0'

## SCALE

40'

20'

## MATCHLINE STA 1067+00

## MATCHLINE STA 1061+25

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

209

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## LCH

Page 56 of 76

## T

## P

## S

-

## S

## E

## R

## EX. 9" SAN

## SAN

## SAN

## S

-

## S

## E

## R

## SAN

## E

## X

.

8

"

## D

## I

## P

## EX. 9" VCP

## EX. 9" VCP

+

9

4

0.02

0.06

+

0

4

## CSAH 53 (66TH ST)

## S

## AN

550

7

8

5

795

1

0

7

0

## � CSAH 52 (NICOLLET AVE)

## CB-1604

## CB-1605

## CB-1603

## CB-1602

## CB-1601

## CB-1600

## CB-1700

## 12" PVC INV = 841.90

## STORM SEWER

## CONNECT TO EXISTING

0'

## SCALE

40'

20'

## MATCHLINE STA 1067+00

## EXISTING STORM SEWER

## TRANSITION FT/FT

## SUPERELEVATION

## EXISTING DRAINAGE STRUCTURES

## PROPOSED DRAINAGE STRUCTURES

## SURFACE FLOW DIRECTION

## LEGEND

## CONSTRUCTION LIMITS

## EXISTING RIGHT OF WAY

## EXISTING PROPERTY LINE

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## PROPOSED STORM SEWER

## XXXXPROPOSED STRUCTURE NUMBER

## PROPOSED 4" PERF TP PIPE DRAIN

## CONNECTIONS PRIOR TO SHOP DRAWING SUBMITTAL.

## CONTRACTOR SHALL VERIFY ALL PROPOSED STORM SEWER AND STORM STRUCTURE 1.

## GENERAL NOTE:

## MINNESOTA.

## AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

## I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION

## LILY C.S. HOCKLICENSE NO.

63598

12/19/2025

## DATE

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_300drp.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_300drp

## 19-DEC-2025

## SHEETDRAINAGE & SUPERELEVATION PLAN

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

## DESIGN BY:

## CAD BY:

## CHECKED BY:

## LAST REVISION:

366

210

## SAP 157-020-034, CP 41019, SAP 027-652-046

--/--/----

## JCLA

## SSA

## LCH

Page 57 of 76

## INFRASTRUCTURE MAINTENANCE AREA

## COUNTY MAINTAINED STORM WATER TREATMENT

## DETOUR

## ROAD CLOSED

## THRU TRAFFIC

## TO

## C

## L

## O

## S

## E

## D

## R

## O

## A

## D

## AHA WAY

## E 67TH ST

## S 1ST AVE

## CSAH 52 (NICOLLET AVE)

## MAINTAIN ACCESS TO ALL RESIDENTIAL DRIVEWAYS. C.

## TEMPORARY TRAFFIC CONTROL MEASURES.

## BETWEEN CSAH 52 (NICOLLET AVE) AND 1ST ST PRIOR TO PLACING

## TO ALL AFFECTED PROPERTY OWNERS WITH DRIVEWAYS ON 67TH ST

## COUNTY SHALL PROVIDE A MINIMUM 48-HOUR WRITTEN NOTICE TOB.

## MAINTENANCE WORK.

## ADVANCE OF STORM WATER TREATMENT INFRASTRUCTURE

## COUNTY TO NOTIFY CITY ENGINEER AT LEAST 7 CALENDAR DAYS INA.

## GENERAL NOTES:

## MINNESOTA

## HENNEPIN COUNTY

Exhibit D - Traffic Control Procedures for Stormwater Treatment Infrastructure Maintenance

## CSAH 52 (NICOLLET AVE) - CP 2120800

## N

Publication date:

11/3/2025

damage, injury or loss resulting from this map.��

legal, engineering or surveying purposes. Hennepin County shall not be liable for any

or accuracy; (ii) is furnished with no warranty of any kind; and (iii) is not suitable for

This map (i) is furnished "AS IS" with no representation as to completenessDisclaimer:

Page 58 of 76

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## GENERAL LANDSCAPE NOTES

## OPERATIONS IS INCIDENTAL. ALL CURB AND GUTTER

## REPAIR/REPLACE PAVEMENT, CURBING OR TURF DAMAGED BY CONSTRUCTION

## NATURE AND SCOPE OF WORK.

## CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS NEEDED RELATING TO THE

## CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.

## REPAIR OR REPLACE THE ABOVE IF DAMAGED DURING

## VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. CONTRACTOR SHALL

## UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES,

## CONTRACTOR SHALL CONTACT GOPHER STATE ONE (811) FOR LOCATION OF

## ARCHITECT PRIOR TO MAKING ADJUSTMENTS.

## IN THE FIELD. NOTIFY OWNER AND LANDSCAPE

## ADJUSTMENTS IN LOCATIONS OF PROPOSED PLANT MATERIALS MAY BE REQUIRED

## QUANTITIES EXIST.

## PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN

## COMPLETED IN THE IMMEDIATE AREA.

## NO PLANTS WILL BE PLANTED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN

## CONTRACTORS WORKING ON SITE.

## AND PLANTING INSTALLATION WITH OTHER

## LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION

## REFER TO PLANTING DETAILS AND NOTES FOR MORE INFORMATION.

## PRIOR TO INSTALLATION.

## PLANT MATERIAL TO BE REVIEWED AND ACCEPTED BY LANDSCAPE ARCHITECT

## ARCHITECT APPROVAL PRIOR TO DIGGING HOLES.

## TREE LOCATIONS AND SPECIES TO BE STAKED BY CONTRACTOR FOR LANDSCAPE

## AND WARRANTY REQUIREMENTS.

## REQUIREMENTS, PLANT AND SEED MAINTENANCE,

## SEE SPECIFICATIONS FOR APPROVED PLANTING SEASONS, INSTALLATION

## EROSION AND SEDIMENT CONTROL PLANS FOR COORDINATION.

## REFER TO CONSTRUCTION & PROFILES FOR ROADWAY INFORMATION, REFER TO

## CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK.

## CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH EXISTING

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

1

## SAP 157-020-034, CP 41019, SAP 027-652-046

## CP 4 1 0 1 9

Page 59 of 76

## C

## ON

## C

## ON

## C

## ON

## City of Richfield

1

2

3

4

5

6

7

8

192

193

194

195

196

197

## W 77TH ST

## E 77TH ST

7614

7620

7626

7638

7619

7623

7627

7633

7643

7645

7644

7700

7701

## EX. 20" CL-C

## 2' CONC WALL

## SAN

## SAN

## SAN

## SAN

## SAN

## EX. 8" CIP

## EX. 8" DIP

## E

## X

.

8

"

## C

## I

## P

## E

## X

.

8

"

## C

## I

## P

## EX. 9" VCP

## EX. 9" VCP

1001100310001000

## SAN

## SAN

## � CSAH 52 (NICOLLET AVE)

0'

## SCALE

40'

20'

## BEGIN CONSTRUCTION

## CSAH 52 (NICOLLET AVE)

## CP NO 2120800

## SAP 027-652-046 / SAP 157-020-034

## CP 41019

## STA 1000+57.85

## MATCHLINE STA 1004+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

2

## SAP 157-020-034, CP 41019, SAP 027-652-046

## BUR OAK

## 3 - QM

## BUR OAK

## 2 - QM

## CP 4 1 0 1 9

Page 60 of 76

9

10

13

14

15

16

17

18

183

184

185

186

187

190

191

7600

7608

7609

7613

7520

7526

7532

7538

7544

7519

7525

7531

7537

7543

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

42

"

## R

## C

## P

## E

## X

.

4

2

"

## R

## C

## P

## E

## X

.

1

0

"

## P

## V

## C

## E

## X

.

1

2

"

## P

## V

## C

## SAN

1008

1005

1

0

1

0

1005

1

0

1

0

## SAN

## SAN

## SAN

## SAN

## SAN

## SAN

## SAN

## � 76TH ST

## � CSAH 52 (NICOLLET AVE)

## � 76TH ST

0'

## SCALE

40'

20'

## MATCHLINE STA 1004+50

## MATCHLINE STA 1010+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

3

## SAP 157-020-034, CP 41019, SAP 027-652-046

## SWAMP WHITE OAK

## 1 - QB

## SWAMP WHITE OAK

## 2 - QB

## SWAMP WHITE OAK

## 2 - QB

## CP 4 1 0 1 9

Page 61 of 76

110

19

20

21

22

23

24

25

26

27

174

175

176

177

180

181

182

7500

7508

7514

7501

7507

7513

7426

7432

7438

7444

7425

7433

7437

7445

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

1012

10151015

## SAN

## SAN

## SAN

## SAN

## � 75TH ST

## � CSAH 52 (NICOLLET AVE)

## � 75TH ST

0'

## SCALE

40'

20'

## MATCHLINE STA 1016+50

## MATCHLINE STA 1010+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

4

## SAP 157-020-034, CP 41019, SAP 027-652-046

## MOUNTAIN ASH

## 2 - SA

## JEFFERSON AMERICAN ELM

## 1 - UJ

## AUTUMN GOLD MAIDENHAIR TREE

## 2 - GA

## AUTUMN GOLD MAIDENHAIR TREE

## 2 - GA

## PINCETON AMERICAN ELM

## 1 - UP

## GRO-LOW FRAGRANT SUMAC

## 5 - RG

## RUBY STELLA DAYLILY

## 78 - HR

## PRARIE DROPSEED

## 30 - SH

## GRO-LOW FRAGRANT SUMAC

## 16 - RG

## RUBY STELLA DAYLILY

## 72 - HR

## PRAIRIE DROPSEED

## 28 - SH

## MOUNTAIN ASH

## 3 - SA

## MOUNTAIN ASH

## 1 - SA

## AUTUMN GOLD MAIDENHAIR TREE

## 2 - GA

## CP 4 1 0 1 9

Page 62 of 76

12

0

28

29

30

31

34

35

36

165

166

167

170

171

172

173

7400

7408

7414

7420

7401

7407

7413

7419

7344

7338

7332

7345 - 7343

7339 - 7337

7333 - 7331

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

9

"

## V

## C

## P

## EX. 9" VCP

## G

## G

## G

1018

10201020

## SAN

## SAN

## SAN

## T

## VAULT

## COMM

## � CSAH 52 (NICOLLET AVE)

## � 74TH ST

## � 74TH ST

0'

## SCALE

40'

20'

## MATCHLINE STA 1022+50

## MATCHLINE STA 1016+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

5

## SAP 157-020-034, CP 41019, SAP 027-652-046

## SILVER LINDEN

## 4 - TS

## SKYLINE® HONEY LOCUST

## 3 - GI

## KENTUCKY COFFEETREE

## 2 - GD

## GRO-LOW FRAGRANT SUMAC

## 10 - RG

## GRO-LOW FRAGRANT SUMAC

## 3 - RG

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## APRICOT SPARKLES DAYLILY

## 44 - HA

## PRAIRIE DROPSEED

## 16 - SH

## GROW-LOW FRAGRANT SUMAC

## 3 - RG

## SILVER LINDEN

## 1 - TS

## SKYLINE® HONEY LOCUST

## 1 - GI

## SKYLINE® HONEY LOCUST

## 1 - GI

## SKYLINE® HONEY LOCUST

## 1 - GI

## CP 4 1 0 1 9

Page 63 of 76

37

38

39

40

41

44

45

46

47

155

156

157

160

161

162

163

164

7326

7327 - 7325

7320

7319

7311 - 7315

7309

7301 - 7303

7314

7308

7300

7244

7238

7232

7245

7241

7237

7233

## T

## P

## T

## P

## R

## O

## C

## K

## R

## O

## C

## K

## R

## O

## C

## K

## R

## O

## C

## K

## SAN

## SAN

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

4

2

"

## R

## C

## P

## E

## X

.

42

"

## R

## C

## P

10

28

1023

1

02

5

1

02

5

## SAN

## SAN

## SAN

## SAN

## � CSAH 52 (NICOLLET AVE)

## � 73RD ST

## � 73RD ST

0'

## SCALE

40'

20'

## MATCHLINE STA 1028+50

## MATCHLINE STA 1022+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

6

## SAP 157-020-034, CP 41019, SAP 027-652-046

## GRO-LOW FRAGRANT SUMAC

## 3 - RG

## PRAIRIE DROPSEED

## 18 - SH

## STELLA SUPREME DAYLILY

## 25 - HS

## PRAIRE DROPSEED

## 5 - SH

## GRO-LOW FRAGRANT SUMAC

## 3 - RG

## PRAIRIE DROPSEED

## 17 - SH

## STELLA SUPREME DAYLILY

## 38 - HS

## PRAIRIE DROPSEED

## 17 - SH

## GRO-LOW FRAGRANT SUMAC

## 3 - RG

## KENTUCKY COFFEETREE

## 1 - GD

## CP 4 1 0 1 9

Page 64 of 76

1

4

0

## Hennepin County

48

49

50

51

52

53

54

55

58

59

60

148

150

151

152

153

154

7226

7220

7214

7208

7200

7229

7225

7221

7217

7213

7209

7201 - 7201

7145

7141

7137

7205

## T

## P

## M

## A

## I

## L

## R

## O

## C

## K

## M

## A

## I

## L

## R

## O

## C

## K

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

8

"

## C

## I

## P

10

4

7

7

84

9

.

04

## S

## T

## U

## M

## P

24

1

0

32

1

0

3

0

1

0

3

0

## SAN

## SAN

## SAN

## SAN

## VAULT

## COMM

## � CSAH 52 (NICOLLET AVE)

## � 72ND ST

## � 72ND ST

## PARCEL WITH IRRIGATION

0'

## SCALE

40'

20'

## MATCHLINE STA 1034+50

## MATCHLINE STA 1028+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

15

7

## SAP 157-020-034, CP 41019, SAP 027-652-046

## HENNEPIN COUNTY PROJECT 2120800

## JEFFERSON AMERICAN ELM

## 1 - UJ

## PRINCETON AMERICAN ELM

## 1 - UP

## TUPELO

## 3 - NS

## TUPELO

## 1 - NS

## GRO-LOW FRAGRANT SUMAC

## 19 - RG

## APRICOT SPARKLES DAYLILY

## 74 - HA

## PRAIRIE DROPSEED

## 28 - SH

## APRICOT SPARKLES DAYLILY

## 72 - HA

## PRAIRIE DROPSEED

## 27 - SH

## KENTUCKY COFFEETREE

## 3 - GD

## COMMON HACKBERRY

## 5 - CO

## COMMON HACKBERRY

## 1 - CO

## TUPELO

## 2 - NS

## CP 4 1 0 1 9

Page 65 of 76

150

61

62

63

67

7133

7129

7045

7101

## Hennepin County

148

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

1

0

3

5

1040

1

0

3

5

1040

## SAN

## SAN

## � CSAH 52 (NICOLLET AVE)

## � 71ST ST

## PARCEL WITH IRRIGATION

## PARCEL WITH IRRIGATION

0'

## SCALE

40'

20'

## MATCHLINE STA 1040+25

## MATCHLINE STA 1034+50

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

8

## SAP 157-020-034, CP 41019, SAP 027-652-046

## AUTUMN RADIANCE RED MAPLE

## 1 - AR

## SPAETH'S ALDER

## 2 - AA

## AUTUMN RADIANCE RED MAPLE

## 1 - AR

## JEFFERSON AMERICAN ELM

## 1 - UJ

## GRO-LOW FRAGRANT SUMAC

## 27 - RG

## GRO-LOW FRAGRANT SUMAC

## 5 - RG

## STELLA SUPREME DAYLILY

## 40 - HS

## PRAIRIE DROPSEED

## 14 - SH

## GRO-LOW FRAGRANT SUMAC

## 5 - RG

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## PRAIRIE DROPSEED

## 19 - SH

## RUBY STELLA DAYLILY

## 48 - HR

## FRAGRANT SUMAC

## GRO-LOW

## 7 - RG

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## AUTUMN RADIANCE RED MAPLE

## 1 - AR

## AUTUMN RADIANCE RED MAPLE

## 2 - AR

## SPAETH'S ALDER

## 1 - AA

## CP 4 1 0 1 9

Page 66 of 76

68

69

70

71

72

73

147

7033

7029

7025

7021

7019

7015

## Augsburg Park

## City of Richfield

## EX. 20" CL-C

## EX. 9" VCP

1041

1042

## SAN

## � CSAH 52 (NICOLLET AVE)

0'

## SCALE

40'

20'

## MATCHLINE STA 1044+25

## MATCHLINE STA 1040+25

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

9

## SAP 157-020-034, CP 41019, SAP 027-652-046

## PRINCETON AMERICAN ELM

## 1 - UP

## PRAIRIE HORIZON® MANCHURIAN ALDER

## 1 - AH

## PRAIRIE HORIZON® MANCHURIAN ALDER

## 3 - AH

## APRICOT SPARKLES DAYLILY

## 56 - HA

## PRAIRIE DROPSEED

## 20 - SH

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## SPAETH'S ALDER

## 2 - AA

## PRAIRIE HORIZON® MANCHURIAN ALDER

## 2 - AH

## CP 4 1 0 1 9

Page 67 of 76

7000

74

75

76

77

79

80

81

82

83

84

140

141

142

143

144

145

7009

7005

7001

6944

6949

6945

6936

6941

6920

6937

6935 - 6933

## Richfield Community Center

## T

## P

## M

## A

## I

## L

## M

## A

## I

## L

## M

## A

## I

## L

## M

## A

## I

## L

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

11

1

4

2

851

.

8

6

## NON

-

## T

## R

## A

## F

## F

## I

## C

## S

## I

## G

## N

1049

1045

1050

1045

1050

## S

## A

## N

## S

## AN

## S

## A

## N

## S

## A

## N

## S

## A

## N

## T

## VAULT

## COMM

## � CSAH 52 (NICOLLET AVE)

## � 70TH ST RAB WB

## � 70TH ST RAB EB

0'

## SCALE

40'

20'

## MATCHLINE STA 1050+00

## MATCHLINE STA 1044+25

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

10

## SAP 157-020-034, CP 41019, SAP 027-652-046

## RUBY STELLA DAYLILY

## 15 - HR

## GRO-LOW FRAGRANT SUMAC

## 3 - RG

## PRAIRIE DROPSEED

## 18 - SH

## RUBY STELLA DAYLILY

## 38 - HR

## RUBY STELLA DAYLILY

## 24 - HR

## PRAIRIE DROPSEED

## 14 - SH

## GRO-LOW FRAGRANT SUMAC

## 4 - RG

## RUBY STELLA DAYLILY

## 15 - HR

## RIVER BIRCH

## 3 - BR

## RIVER BIRCH

## 1 - BR

## CP 4 1 0 1 9

Page 68 of 76

1

70

175

85

86

87

88

89

90

92

93

131

132

133

134

137

138

139

6914

6908

6900

6927

6921

6915

6909

6901

6844

6838

6832

6826

6829

6825

## T

## P

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

6

"

## C

## I

## P

1053

1050

1055

1050

1055

## S

## A

## N

## S

## A

## N

## S

## A

## N

## S

## AN

## � CSAH 52 (NICOLLET AVE)

## � W 69TH ST

## � E 69TH ST

0'

## SCALE

40'

20'

## MATCHLINE STA 1055+75

## MATCHLINE STA 1050+00

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

11

## SAP 157-020-034, CP 41019, SAP 027-652-046

## PRINCETON SENTRY MAIDENHAIR TREE

## 2 - GP

## JEFFERSON AMERICAN ELM

## 1 - UJ

## PRINCETON AMERICAN ELM

## 1 - UP

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## STELLA SUPREME DAYLILY

## 40 - HS

## PRAIRIE DROPSEED

## 14 - SH

## GRO-LOW FRAGRANT SUMAC

## 13 - RG

## RUBY STELLA DAYLILY

## 40 - HR

## PRAIRIE DROPSEED

## 14 - SH

## GRO-LOW FRAGRANT SUMAC

## 7 - RG

## GRO-LOW FRAGRANT SUMAC

## 9 - RG

## APRICOT SPARKLES DAYLILY

## 50 - HA

## PRAIRIE DROPSEED

## 19 - SH

## FRAGRANT SUMAC

## GRO-LOW

## 9 - RG

## RIVER BIRCH

## 2 - BR

## NORTHERN CATALPA

## 3 - CS

## NORTHERN CATALPA

## 2 - CS

## NORTHERN CATALPA

## 1 - CS

## PRINCETON SENTRY MAIDENHAIR TREE

## 1 - GP

## PRINCETON SENTRY MAIDENHAIR TREE

## 1 - GP

## CP 4 1 0 1 9

Page 69 of 76

1

8

0

94

95

96

97

98

101

102

103

104

124

127

128

129

130

6802 - 6800

6810 - 6808

6816 - 6814

6822 - 6820

6819

6815

6811

6805

6803

6744

6745

6739

6733

## T

## P

## E

## X

.

1

6

"

## C

## I

## P

## EX. 6" CIP

## EX. 9" VCP

## EX. 9" VCP

## EX. 9" VCP

## E

## X

.

9

"

## V

## C

## P

## E

## X

.

9

"

## V

## C

## P

## E

## X

.

9

"

## V

## C

## P

1057

10601060

## S

## A

## N

## S

## A

## N

## S

## A

## N

## S

## AN

## � CSAH 52 (NICOLLET AVE)

## � 68TH ST

## � 68TH ST

## PARCEL WITH IRRIGATION

0'

## SCALE

40'

20'

## MATCHLINE STA 1061+25

## MATCHLINE STA 1055+75

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

12

## SAP 157-020-034, CP 41019, SAP 027-652-046

## EXCLAMATION!™ LONDON PLANE TREE

## 3 - PM

## JEFFERSON AMERICAN ELM

## 1 - UJ

## PRINCETON AMERICAN ELM

## 1 - UP

## GRO-LOW FRAGRANT SUMAC

## 4 - RG

## STELLA SUPREME DAYLILY

## 80 - HS

## PRAIRIE DROPSEED

## 30 - SH

## STELLA SUPREME DAYLILY

## 72 - HS

## PRAIRIE DROPSEED

## 27 - SH

## GRO-LOW FRAGRANT SUMAC

## 26 - RG

## PRINCETON SENTRY MAIDENHAIR TREE

## 1 - GP

## EXCLAMATION!™ LONDON PLANE TREE

## 1 - PM

## EXCLAMATION!™ LONDON PLANE TREE

## 1 - PM

## EXCLAMATION!™ LONDON PLANE TREE

## 1 - PM

## CP 4 1 0 1 9

Page 70 of 76

105

106

107

108

109

110

111

112

113

114

123

6740

6727

6721

6715

6711

6705

6701

6641

## 67TH E.

10 & 12

## EX. 9" SANEX. 9" SAN

## E

## X

.

9

"

## V

## C

## P

## E

## X

.

9

"

## V

## C

## P

## EX. 9" VCP

1063

10651065

## S

## A

## N

## S

## A

## N

## S

## A

## N

## � CSAH 52 (NICOLLET AVE)

## � 67TH ST

## � 67TH ST

## PARCEL WITH IRRIGATION

0'

## SCALE

40'

20'

## MATCHLINE STA 1067+00

## MATCHLINE STA 1061+25

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

13

## SAP 157-020-034, CP 41019, SAP 027-652-046

## GREENSPIRE LITTLELEAF LINDEN

## 1 - TG

## GRO-LOW FRAGRANT SUMAC

## 9 - RG

## PRAIRIE DROPSEED

## 15 - SH

## APRICOT SPRAKLES DAYLILY

## 20 - HA

## APRICOT SPARKLES DAYLILY

## 20 - HA

## PRAIRIE DROPSEED

## 15 - SH

## STELLA SUPREME DAYLILY

## 29 - HS

## PRAIRIE DROPSEED

## 15 - SH

## SIENNA GLEN® MAPLE

## 2 - AS

## SIENNA GLEN® MAPLE

## 3 - AS

## CP 4 1 0 1 9

Page 71 of 76

115

116

117

118

119

122

6600

6635

6633

6629

6625

6601

## CSAH 53 (66TH ST)

## T

## P

## S

-

## S

## E

## R

## EX. 9" SAN

## SAN

## S

-

## S

## E

## R

## SAN

## E

## X

.

8

"

## D

## I

## P

## EX. 9" VCP

## EX. 9" VCP

1068

1

0

7

0

1

0

7

0

## S

## AN

## V

## A

## U

## L

## T

## C

## O

## MM

## � CSAH 52 (NICOLLET AVE)

0'

## SCALE

40'

20'

## MATCHLINE STA 1072+00

## MATCHLINE STA 1067+00

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## 52 (NICOLLET AVE)C.S.A.H.

## 2120800HENNEPIN COUNTY PROJECT

15

14

## SAP 157-020-034, CP 41019, SAP 027-652-046

## GREENSPIRE LITTLEEAF LINDEN

## 3 - TG

## JEFFERSON AMERICAN ELM

## 1 - UJ

## STELLA SUPREME DAYLILY

## 29 - HS

## PRAIRIE DROPSEED

## 15 - SH

## APRICOT SPARKLES DAYLILY

## 21 - HA

## PRAIRIE DROPSEED

## 8 - SH

## STELLA SUPREMEN DAYLILY

## 21 - HS

## RUBY STELLA DAYLILY

## 21 - HR

## PRAIRIE DROPSEED

## 10 - SH

## STELLA SUPREME DAYLILY

## 35 - HS

## GRO-LOW FRAGRANT SUMAC

## 10 - RG

## RUBY STELLA DAYLILY

## 66 - HR

## PRAIRIE DROPSEED

## 48 - SH

## GRO-LOW FRAGRANT SUMAC

## 12 - RG

## GREENSPIRE LITTLELEAF LINDEN

## 1 - TG

## CP 4 1 0 1 9

Page 72 of 76

120

121

## C

## S

## A

## H

5

3

(

6

6

## T

## H

## S

## T

)

## CSAH 53 (66TH ST)

## � CSAH 52 (NICOLLET AVE)

0'

## SCALE

40'

20'

## MATCHLINE STA 1072+00

## CSAH 52 (NICOLLET AVE)

## CP NO 2120800

## SAP 027-652-046 / SAP 157-020-034

## CP 41019

## STA 1074+10.00

## END CONSTRUCTION

## CONSTRUCTION LIMITS

## TURF ESTABLISHMENT LEGEND

## SODDING TYPE LAWN (BY OTHERS)

## EXISTING RIGHT OF WAY

## PERMANENT EASEMENT

## TEMPORARY EASEMENT

## EXISTING PROPERTY LINE

## MULCH MATERIAL TYPE 6 (BY OTHERS)

## TREE PLANTING LOCATION

www.hkgi.com

## MINNEAPOLIS, MN 55401

## 800 WASHINGTON AVE N. #207

## PATH & FILENAME:

## Projects\052_2120800\Design\CADD\Plans\0522120800_350te_01.dgn

## PLOTTED/REVISED:

## PLOT NAME:

0522120800_350te_01

## 15-JAN-2026

## SHEET

## LANDSCAPING EXHIBITS

## C.S.A.H. 52 (NICOLLET AVE)

## HENNEPIN COUNTY PROJECT 2120800

15

15

## SAP 027-652-046, SAP 157-020-034, CP 41019

## CP 4 1 0 1 9

Page 73 of 76

## City Council Meeting 2/10/2026

## Agenda Section: Consent Calendar

Agenda Item: 7.c.

## Report Prepared By:

## Jennifer Anderson, Support Services Manager

## Department Director:

## Jay Henthorne, Police Chief

## Item for Consideration:

Consider the approval of a resolution authorizing the lawful gambling premises

permit by Richfield Lions Club, to conduct lawful gambling at Sandy's Tavern,

6612 Penn Avenue South.

## EXECUTIVE SUMMARY

On January 14, 2026, the City received an application for a premises permit to be

submitted to the Minnesota State Gambling Control Board by the Richfield Lions Club,

to conduct lawful gambling at Sandy's Tavern, 6612 Penn Avenue South.

Richfield Lions Club is a non-profit organization that provides funding to support

community programs, empowering their service and addressing the needs of their

communities both locally and globally.

The Public Safety Director has reviewed the background information and documents

and approves of its contents and sees no basis for denial.

## RECOMMENDED ACTION

By Motion: Adopt the resolution approving the lawful gambling premises permit

application by the Richfield Lions Club, to conduct lawful gambling at Sandy's

Tavern, 6612 Penn Avenue South.

## HISTORICAL CONTEXT

On January 14, 2026, the City received an application for a premises permit to be

submitted to the Minnesota State Gambling Control Board by the Richfield Lions Club,

to conduct lawful gambling at Sandy's Tavern, 6612 Penn Avenue South.

A Public Safety background investigation was completed. The Public Safety Director

has reviewed the information in the background investigation report. There is no

information in the investigation that shows any cause for recommending denial of the

requested license.

## EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS

There are no such considerations.

## POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)

Richfield City Code 1100.13 requires the Public Safety Department to review the

request for the gambling license and make its review and recommendation to the City

Page 74 of 76

Council.

## CRITICAL TIMING ISSUES

The Minnesota Gambling Control Board approves permit applications at the beginning

of each month. If the Council adopts the resolution at the meeting on February 10,

2026, Richfield Lions Club could potentially begin operation and management of the

gambling activity at Sandy's Tavern in March of 2026.

## FINANCIAL IMPACT

There is no financial impact.

## LEGAL CONSIDERATIONS

There are no legal considerations.

## ALTERNATIVE RECOMMENDATION(S)

The City Council could deny the request for the premises permit for the Richfield Lions

Club. This would mean the applicant would not be able to conduct gambling activities at

Sandy's Tavern.

## ATTACHMENTS

## 1. Resolution Sandy's Tavern Bar Gambling

Page 75 of 76

## RESOLUTION NO. ____

## A RESOLUTION APPROVING THE LAWFUL GAMBLING PREMISES PERMIT

## APPLICATION FOR RICHFIELD LIONS CLUB TO CONDUCT LAWFUL GAMBLING AT

## SANDY'S TAVERN AT 6612 PENN AVENUE SOUTH

WHEREAS, the Richfield Lions Club is submitting an application to the

Minnesota Gambling Control Board for approval of a Premises Permit application to

conduct lawful charitable gambling at Sandy's Tavern

## 6612 Penn Avenue South, Richfield, MN; and

WHEREAS, the gambling premises is located within the City limits of Richfield, Minnesota;

and

WHEREAS, the Richfield Lions Club is a lawful gambling organization within the City; and

WHEREAS, the Richfield Lions Club will be responsible for operating and managing the

lawful gambling activity at the Sandy's Tavern site and will comply with all applicable

requirements of

city code and state statutes.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Richfield, Minnesota

that the City Council does hereby approve the issuance of a Premises Permit to the Richfield

Lions Club to conduct lawful charitable gambling activities at Sandy's Tavern, 6612 Penn Avenue

South, Richfield, Minnesota.

Adopted by the City Council of the City of Richfield, Minnesota this 10th day of February, 2026.

## Mary Supple Mayor

## ATTEST:

## Michelle Friedrich, City Clerk

Page 76 of 76

Was this story helpful?

Other Topics from This Document

  • Public Concerns Regarding Federal Immigration Enforcement (ICE/DHS)

  • Housing Instability and Eviction Prevention

  • Student Safety and Judicial Accountability

  • Minnesota Independence College & Community (MICC) Development

  • Establishment of Human Resources Department and Director Position

  • Nicollet Avenue Reconstruction Project (CSAH 52)

  • Regional Collaboration on Immigration Enforcement and Advocacy

Want to know when new stories arrive?

Enter your email to receive updates.

We will not use your email for any other purpose. You can unsubscribe at any time.