Edina tackles water safety, rail noise, and police training

General Interest
Meeting Date: Date not available
Story generated: Jun 13, 2026
Focus: Edina tackles water safety, rail noise, and police training

At its March 15 retreat, the Edina City Council addressed three major infrastructure and public safety initiatives: completing a federally required water line inventory, seeking federal funding to improve railroad crossing safety, and breaking ground on a new police training facility shared with neighboring cities.

The city's Public Works Department finished a comprehensive inventory of water service lines required by the federal Environmental Protection Agency. The good news: no lead service lines were found in Edina. The work did identify two galvanized pipes that need replacement and 96 previously unknown lines that have since been evaluated. The city will cover the cost of replacing the two galvanized lines and will notify the affected property owners.

In a separate initiative, Edina is pursuing $200,000 in federal funding to support a $250,000 Railroad Crossing Safety Action Plan. The plan would study and improve seven railroad crossings within the city to enhance safety and potentially establish "quiet zones" where train horns are not required. The effort comes as residents have complained about increased nighttime train operations and associated horn noise. The process is complex and will require approval from the Federal Railroad Administration, making it a multi-year undertaking.

On a more celebratory note, the council held a groundbreaking ceremony for a new tactical training building at the South Metro Public Safety Training Facility on Brar Boulevard. The 6,524-square-foot facility is a collaborative project involving Edina, Bloomington, Eden Prairie, and the Metropolitan Airports Commission. Designed with an L-shaped layout, the building will allow law enforcement officers to train for various scenarios using simulated firearms. Construction is expected to be completed this winter.

The council also provided information about the upcoming general election on November 5th. Early voting is available at Edina City Hall with extended hours on November 2nd, 3rd, and 4th, ahead of Election Day voting at designated polling locations.

This story was created by artificial intelligence (a large language model) based on the proceedings captured in the video below.

Go deeper on this topic

Research related meeting documents and build a brief — without rewriting the story.

Rate this story

Other Topics from This Document

  • Railroad Crossing Safety Action Plan and Quiet Zones

  • South Metro Public Safety Training Facility Expansion

  • General Election and Early Voting Information

Meeting Analysis
Source Document
Focus: Original document text

[Music] welcome to agenda Edina a program summarizing the actions taken at City Hall that affect you most I'm your host dorothia Marty the Dina public works department recently wrapped up a service line inventory documenting materials used for water service lines throughout the city this project was part of a federal requirement under the US Environmental Protection agencies revised lead and copper rule the goal was to identify any lead or galvanized service lines requiring replacement to protect Public Health the revisions required water suppliers to complete an inventory and send it to the Minnesota Department of Health Edina submitted its findings in late August reporting no lead service lines two galvanized lines that require replacement 96 with unknown material and more than 13 ,000 non-led lines since August Public Works has finished evaluating the lines of unknown material so what we did was we started looking at all our all of our records that we had on hand and once we exhausted all those records then we started physically going out to houses and did what we call Hydro Excavating at the curb stop the curb stop is where the city ownership and the home ownership uh is separated which there we identify the material type even though the inventory is complete the city is requ required by federal law to notify Property Owners whose service lines were listed as unknown or galvanized requiring replacement in the August report those letters are expected to hit mailboxes within the next few weeks so we the city has uh two galvanized lines that need replacement on the homeowner side uh we made contact with those residents uh we have a contractor lined up already so as soon as we can just get the scheduling straightened out we're going to get those lines replaced at City cost for those those two residents learn more at eam mn.gov servine inventory the city is seeking Federal funding for a study to improve atg grade railroad crossings in Idina a rail line owned by cpkc railroad runs through the city and while many Crossings are grade separated with streets going over or under the tracks seven still remain at street level with varying levels of safety measures to address this issue the city would like to complete a railroad crossing Safety Action Plan to see what can be done to improve the situation at each of the seven at grade Crossings until recently most trains passing through Edina operated during the daytime now the railroad has begun operating these trains at night which might be disturbing residents since the train horn rule requires Engineers to sound train horns at least 15 15 seconds before entering public grade Crossings eliminating Crossings or making grade separation improvements would remove the need for trains to sound their horns at Crossings where that cannot be done other safety improvements could be evaluated to make the crossing safer we have to first study if we can eliminate any of the crossings and if we can't then what can we do to mitigate the risks to mitigate the risks are pavement markings to show where cars are supposed to stop before they cross the tracks we can do flashing lights we can do Crossing signage or just overhead arms that stop traffic when a train comes through so those are really the first steps uh if we want to consider a quiet Zone on our seven Crossings within town the city has requested Federal funding of $200,000 for creation of the railroad crossing Safety Action Plan which is estimated to cost $250,000 some have asked if the city can establish quiet zones in the meantime the city does not have that Authority and the process to establish one can take years so if the city wants to establish a quiet Zone that has to be approved by the Federal Railroad Administration they have to look at the RIS the mitigation risk tactics that we want to do at each Crossing we would have to implement those mitigation risk uh improvements and then we would be able to implement that quiet Zone with them and through them that process is a multi-year Endeavor to get to a officially approved quiet Zone the city does not expect to hear back from the Federal Railroad Administration about the funding request until March 2025 if the grant is not awarded there will be no funding available for the study in 2025 the city of Edina and other owners of the South Metro Public Safety Training Facility recently celebrated the start of construction on a new Tactical training build a groundbreaking ceremony was held at the site on Brar Boulevard October 15th the new 6,524 Square ft L-shaped building will sit on the south side of the property with garage doors at each end for police training most of the building will be one level but a mezzanine with stairs will allow for Second Story training scenarios it's designed to fit three vehicles at once which will be especially help during winter training the facility will be used by the owner agencies Edina Bloomington Eden Prairie and the Metropolitan airports commission other local and federal agencies will be able to rent the new facility for an hourly fee training will include building searches use of force techniques and traffic enforcement no live ammunition will be used in the facility only simulated Firearms will be used there in addition to a bathroom and mechanical room the building will mostly offer open space for flexible training needs for law enforcement though a building searches a lot of times you need larger rooms you need different doorway angles you need different entry points or exit points and this building is going to be customizable to give allow us that opportunity to be able to set up different layouts to be able to um change to the different tactics that we need to train on the new building is expected to be complete sometime this winter the general election will be held Tuesday November 5th early voting is underway at City Hall with extended hours those hours are 9:00 a.m. to 3:00 p.m. Saturday November 2nd 9:00 a.m. to 300 p.m. Sunday November 3rd and 8:00 a. to 5:00 p.m. Monday November 4th there is no voting at City Hall on Election Day voters must go to the polls to cast balance that day for more information on the election visit dinam mn.gov elction thank you for watching this episode of agenda Edina I'm your host dorothia Marty [Music]

This story was created by artificial intelligence (a large language model) based on the proceedings captured in the video below.

Want to know when new stories arrive?

Enter your email to receive updates.

We will not use your email for any other purpose. You can unsubscribe at any time.