Edina Approves Water Treatment Plant Site, Shifts Assessing to County
The Edina City Council approved a location for a new water treatment plant to address water quality issues in the Southdale area and announced plans to transfer property assessment services to Hennepin County, a move expected to save taxpayers $1 million annually.
At its June 16 meeting, the Edina City Council greenlit the site for a new water treatment facility that will be built where Fire Station 2 currently stands. The plant aims to fix taste and odor problems affecting Southdale-area residents who receive water directly from the aquifer without treatment. Officials emphasized the water is safe to drink but acknowledged quality concerns.
The fire station will be demolished in 2026 after firefighters relocate to a larger facility elsewhere. City staff explained the site only became viable once the fire station relocation was planned. Before construction begins, the city will redesign nearby Adam Hills Park and Ridgefield Park in 2026, with public input on the treatment plant design expected in two to three years. Construction could start in four to six years, with the facility designed to serve the community for at least 50 years.
In a significant cost-cutting measure, Edina will transfer its entire assessing division to Hennepin County by July 1, 2026. The consolidation eliminates six full-time city positions and is projected to save approximately $500,000 next year and $1 million annually starting in 2027. Hennepin County already provides property assessment services to most cities in the county, and Maple Grove is also making the same transition.
The council also received updates on a planned pedestrian bridge over Minnesota Highway 62 to replace a 1960s structure that was closed after being struck twice by trucks. The state has committed $6 million for the project, though Engineering Director Chad Milner noted the budget is tight. "We're still going to get a great product at the end with bridges and ramps and most likely not stairs or buried power lines," he said. The design, featuring a steel truss bridge clad in wood slats, is 30 percent complete.
In community news, the Energy and Environment Commission is accepting nominations for its second annual tree recognition campaign through mid-October at bettertogetheredina.org, and the city's Independence Day parade will air live on Edina TV at 10 a.m. on July 4.
Our proprietary artificial intelligence agent analyzed publicly available documents including meeting agendas, minutes, and transcripts to write this story to help inform local residents. Feedback helps us improve, so please consider rating how we did with the thumbs up or down below.
Go deeper on this topic
Research related meeting documents and build a brief — without rewriting the story.
Full analysis
New Water Treatment Plant in Greater Southdale Area - Site Approval and Planning
The city council approved a site for a new water treatment plant to address taste and odor issues in the Southdale area caused by untreated aquifer water. The facility will be constructed on the current Fire Station 2 site, which will be demolished in 2026 after the fire station relocates to a larger facility at a new location. The design process will proceed after a master plan redesign of nearby Adam Hills Park and Ridgefield Park in 2026. Public input on the plant design will be solicited in 2-3 years, with construction projected to begin in 4-6 years. The new facility will serve the area for at least 50 years and will also reduce the load on Plant Number 6 during maintenance periods.
We're right at that budget number right now with just a little bit of contingency for those unknown things that we always find during construction. Could be soils, could be other construction contingencies that we see. a little bit more expensive than we had liked, but we're still going to get a great product at the end with bridges and ramps and most likely not stairs or buried power lines.
There's taste and order issues because we got to use water right from the aquifer that doesn't go through a treatment plant. It's still safe to drink.
We finally zeroed in on the Yorktown Park or where the fire station number two site is because we were starting to build a new fire station. So, we looked at that site previously, but with a fire station there, wasn't enough space to make it happen.
Once we understand what the community wants for the park, then we'll see how we integrate the water treatment plan at that time.
The main goal is to celebrate the trees. And by celebrating the trees, we want to you know uh create awareness of of the benefits that the tree has like you know not only of our well-being but also about the all the environmental services that they give us.
Source document
[Music] Welcome to Agenda Edina, a program summarizing the actions taken at city hall that affect you most. I'm your host, Dorothia Marty. A new pedestrian bridge over Minnesota Highway 62 will likely not have stairs to accompany its ADA compliant ramps. This is unless the project comes in greatly under budget or another funding source is secured. The current bridge was built in the 1960s and is owned and managed by the Minnesota Department of Transportation. The bridge currently does not meet requirements of the Americans with Disabilities Act and was closed for most of 2022 after it was struck twice by trucks traveling below on the highway. The state will provide $6 million in funding for the new bridge, which would then be given to the city to own and maintain. Designs for the bridge, which drops into Rosland Park, are about 30% complete and far enough along for the city to begin discussions with Mindot about the details, including height, location, construction, staging, and architectural cladding or covering. The cladding is particularly important to some members of the city council who would like the bridge to serve as an iconic gateway into the community. Designs by project architect Snow Kryik feature a steel truss bridge clad in wood slats. At a city council meeting earlier this month, engineering director Chad Milner said the $6 million will not cover the cost of stairs or bury nearby overhead power lines. We're right at that budget number right now with just a little bit of contingency for those unknown things that we always find during construction. Could be soils, could be other construction contingencies that we see. a little bit more expensive than we had liked, but we're still going to get a great product at the end with bridges and ramps and most likely not stairs or buried power lines. If final approvals are given this year, the city could move forward with obtaining bids for construction in 2026. To reduce spending and ease the municipal property tax levy burden, Henipin County will take over assessing services in Edina no later than July 1, 2026. Edina's assessing division, which currently includes six full-time staff members, establishes estimated market value and determines the property classification of every Edina property each year for property tax allocation. The division also maintains property records, performs annual quintile property reviews, performs property reviews based on new construction and building permits, administers the appeals process, including the board of appeals and equalization, and works with Henipin County on programs related to property assessment and classification. The county currently provides assessing services to most cities in Henipin County as well as Fort Snelling and the Minneapolis St. Paul International Airport. Maple Grove is also moving assessing services to the county. The change is estimated to reduce city spending by approximately $500,000 in 2026 and by $1 million annually starting in 2027. A site has been approved for a new water treatment plant in the greater Southdale area, but before it can be built, a longstanding building must be demolished. Last month, the city council approved using the land currently occupied by Fire Station 2, which is set to be replaced with a much larger building at a new location later this year. Edina TV shows us why a new water treatment plant is needed in the area. Thousands of homes and businesses in Edina use millions of gallons of water every day. This is water treatment plant number six. This is one of five treatment facilities. Most of it is treated in a place like this. So we have various wells that produce raw water into this facility. And this line right here is that raw water line. It's filtered and treated to make it clean and safe to drink. After all the treatment trains, clean water is distributed out this dark blue line into our distribution system. But if you're in the South Dale area, that glass of water likely has a unique flavor. There's taste and order issues because we got to use water right from the aquifer that doesn't go through a treatment plant. It's still safe to drink. A solution to these issues lies in a new water treatment plant and the city council has approved its location. We finally zeroed in on the Yorktown Park or where the fire station number two site is because we were starting to build a new fire station. So, we looked at that site previously, but with a fire station there, there wasn't enough space to make it happen. The city council will be asked to approve the demolition of fire station 2 in 2026. A new plant will also take the load off of plant number six when others are taken offline for maintenance. The design of the building will be decided after a redesign of the nearby Adam Hills Park in Ridgefield. So, they're going to do some master planning for the parks in 2026. Once we understand what the community wants for the park, then we'll see how we integrate the water treatment plan at that time. Once built, the new facility will serve up great tasting water for at least 50 years. It's something you build once and hopefully maintain for a very, very long time. I'm Dan Carpenter for Adina TV. The public will have an opportunity to provide input on the design of the new water treatment plant in 2 to three years. Construction is projected to begin in four to six years. Is there a tree in Dina that is special to you? Does it look the best in your neighborhood with holiday lights? Is it the most climbable? Does it dazzle passers by with its fall colors? Is it spooky? Is it meaningful to your family for some reason? To raise awareness about the importance of trees, promote good tree care, and recognize those who own and care for significant trees in Edina, the Energy and Environment Commission is taking nominations for its second annual tree recognition campaign. The main goal is to celebrate the trees. And by celebrating the trees, we want to you know uh create awareness of of the benefits that the tree has like you know not only of our well-being but also about the all the environmental services that they give us. Trees of any size, color, species or stature that are interesting, unique or significant to residents can be nominated. The tree can be on public or private property. To nominate a tree, visit betterto togetherina.org to fill out a form which requires users to upload at least one photo of the tree. Nominations will be accepted through midocctober. The commission will select trees for recognition and notify nominees and owners of the award later in the year. If you can't see Edina's Independence Day parade in person, tune in to Edina TV at 10:00 a.m. July 4th for a live broadcast of the event. The parade is organized by the Edina Community Foundation and presented by Explore Edina. It runs from behind Edina City Hall to the 50th and France district ending at West 50th Street and Halifax Avenue. The hour-long parade will include marching bands, floats, and other crowd favorites. The live broadcast can be viewed on Comcast channel 813. Thank you for watching this episode of Agenda Edina. I'm your host, Dorothia Marty. [Music]
Was this story helpful?
Other Topics from This Document
Transfer of Assessing Services to Hennepin County
New Water Treatment Plant in Southdale Area
Second Annual Tree Recognition Campaign
Independence Day Parade Broadcast
Also from this meeting
Want to know when new stories arrive?
Enter your email to receive updates.
We will not use your email for any other purpose. You can unsubscribe at any time.